Home
Explore
Exams
Search for anything
Login
Get started
Home
Engineering
Architecture
Preservation Movement and Urban Renewal & Anti-Highway Activism
0.0
(0)
Rate it
Studied by 0 people
0.0
(0)
Rate it
Call with Kai
Knowt Play
New
Learn
Practice Test
Spaced Repetition
Match
Flashcards
Card Sorting
1/12
Earn XP
Description and Tags
Architecture
University/Undergrad
Add tags
Study Analytics
All Modes
Learn
Practice Test
Matching
Spaced Repetition
Name
Mastery
Learn
Test
Matching
Spaced
No study sessions yet.
13 Terms
View all (13)
Star these 13
1
New cards
Minoru Yamasaki
Pruitt-Igoe Housing
St. Louis, Missouri
Completed 1954, destroyed 1972
(the preservation movement and urban renewal)
2
New cards
Boston “Central Artery” (I-93)
Construction began 1950s
(the preservation movement and urban renewal)
3
New cards
The West End, before and after demolition of existing building stock to prepare for “urban renewal”
Late 1950s
(the preservation movement and urban renewal)
4
New cards
Government Center Development (the demolition of Scollay Square to make way for Boston City)
Boston
Begun late 1950s
(the preservation movement and urban renewal)
5
New cards
Wallace Harrison and Max Abramovitz, with Philip Johnson
Lincoln Center
New York
1961-65
(the preservation movement and urban renewal)
6
New cards
Robert Moses
Cross-Manhattan Arterial Proposal
1955
(the preservation movement and urban renewal)
7
New cards
Area Description for Home Owner’s Loan Corporation Security
Map of Greater Boston
1938
“Red-lining”
(anti-highway activism: Boston a case study)
8
New cards
Master Highway Plan for the Boston Metropolitan Area
1948
(anti-highway activism: Boston a case study)
9
New cards
Boston Redevelopment Authority, Family Relocation Department
Proposed path of Inner Belt and the Southwest Expressway
1967
(anti-highway activism: Boston a case study)
10
New cards
Perspective sketches of proposed highway development
Sometime before 1968
(anti-highway activism: Boston a case study)
11
New cards
Anti-highway sign along Southwest Corridor embankment
c. 1969
(anti-highway activism: Boston a case study)
12
New cards
Stull Associates
Urban Design Concept Plan
1978
(anti-highway activism: Boston a case study)
13
New cards
Stull Associates
Ruggles Station
Boston, Massachusetts
Dawings from 1979
Project completed 1987
(anti-highway activism: Boston a case study)