1/88
Concepts and terminologies
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
TUR
Target Unit Rate
FC
FULFILMENT CENTER
SOS
START OF THE SHIFT
EOS
End of the shift
R2P
Rebin to Picker (
ALPS
Automated Labor Planning System
Que pasó con este buffer en el circulo rojo?
Hubo un OSP promotion por parte del PCS. OSP promotion es cuando se extendió el tiempo en AF o para modificar el nuevo HC para el segundo turno (quater) que normalmente nos lo envía el POC 60 minutos antes
AF
AutoFlow
¿que pasa en los flechas?
LS
Late Shift (6 a 14)
ES
Early Shift (14 a 22)
NS
Night Shift (22 a 6)
IB
InBound
OOB
Out of Buffer (when no enough totes are arriving to destination/packers)
OB
OutBound
ECFT
European Central Flow Team
What happens when buffer is above target or overflow
Overloaded Tote Router (jams on conveyors).
What should we do when buffers are too high?
Open TSO-Fracs; adjust pickers; labor moves; Apply pick Throttel (PT); Apply Min99 for AFE PPs when FIFO is lost
What is PT?
Pick Throttle: stops all ARs pick. with PG approval
FIFO
FIRST IN FIRST OUT
How can you turn on PT?
In Autoflow at the bottom part, we click “on”. It stops all process paths
Min 99
Is to stop AFE manually at PC. Just stops Afe path process. Solo lo que ya está despues del inductor es lo que continua fluyendo hacia el rebin
PC
Picking Console
When to apply PT?
When WIP or Buffer is above +20%. Above grey line on TOTAL. TSO Maxed out. No more than 10 mins.
VRETS
Vendor Returns
AFE
Amazon Fullfilment Engine
NWD
No Work Drop. RBPP No New Charge
AA
Amazon Associate
AR
Amazon Robotics
CE
Customer Experience
PPA
Process Path Aggregates:
PPR
Process Path Rollout
UFH
Uninterrupted Flow Hour
ABT
Associate Break Time
SLAM PAD time
depends on FC but normally 25 mins before CPT
Which are the conditions on Pickingnoyetpick?
prioritized; no prioritized; Non Pickable (also known as hardcapped)
Which are the conditions on Pickingpicked?
in progress; in transit; routing; at destination
Singles Family types
singlemedium; single slam; single no slam
CORA
Risk management tool, where it automatically sets TRB by family. If the TRB is set before fast track SLA 45 mins=no dely in CE
CATAN
Risk tool used when we are at risk level 2 or 3, and tells us how can mitigate it, usually by redistributing AA on other process whom had a OB crosstraining.
Sources where you can see the past, current, or future planned buffers
AF (current); SERA )for handover so the ;
Kipp
Is a calculator in which you estimate how to balance the buffer
SERA
Shift Execution Report Analyzer. We use it to do handover and to check the pass shift information.