1/41
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
LCM (least common multiple)
least positive integer that is a multiple of 2+ numbers
GCF (greatest common factor)
greatest positive integer that is a divisor of 2+ numbers
Integer 0 is positive/negative and a even/odd number?
neither pos/neg, even number
x/0 is defined?
undefined
when x is negative, √x is defined?
undefined, cannot take the square root of a negative number in DAT due to no imaginary numbers in the test
when x is positive, √x is ?
positive, e.g. √25 is 5
when x2 = a2 , x = ?
± a
∥
parallel symbol
⊥
perpendicular symbol
Profit =
revenue - cost
Area of circle
π r2
Circumference of circle
2π r
Arc length of circle
S = 2π r (θ/360)
where θ is the angle of the arc
Area of arc of circle
Asector = π r2 (θ/360)
Equation of circle
(x-h)2 + (y-k)2 = r2
where (h,k) is the center of the circle
Area of triangle
½ bh
where b is base length and h is height length
Perimeter of triangle
add up side lengths
Area of equilateral triangle
(√3)/4 s2
where s is the side length
Area of rectangle
Lw
where L is length and w is width
Perimeter of rectangle
2L + 2w
Area of square
s2
Surface area of rectangular prism
SA = 2(Lw + Lh + hw)
Volume of rectangular prism
V = Lwh
Surface area of cylinder
SA = 2π rh + 2π r2
Volume of cylinder
V = π r2h
Surface area of sphere
SA = 4π r2
Volume of sphere
V = 4/3 π r3
Pythagorean theorem: for right triangles
a2 + b2 = c2
remember 3, 4, 5 and 5, 12, 13 right triangles and their triples
1 mile to feet
5280 feet
1 inch to cm
2.54 cm
1 mile to km
1.6 km
1 kg to lbs
2.2 lbs
1 gallon to liters
3.8 L
Speed up and downstream:
Spupstream= spboat - spriver = x - y
Spdownstream= spboat + spriver = x + y
Simple Interest
A = P(1 + rt)
Compound Interest
A = P(1 + r/n)nt
Discriminant
used to determine number of solutions;
Δ = b2 - 4ac
Δ > 0
There are 2 distinct, real solutions
Δ < 0
There are no real solutions
Δ = 0
There is 1 real solution
Work-rate formula
Job = (Rate 1 + Rate 2) x time
Vertex of a parabola
x = -b/2a