A set of vocabulary terms based on MSC High Voltage Safety procedures, covering boundaries, risk assessments, testing protocols, and safety equipment.

Last updated 7:58 AM on 8/7/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

50 Terms

1
New cards

Arc Flash Protection Boundary

The distance from an arc source where a person could receive a second-degree burn without proper PPE.

2
New cards

Energized Electrical Work Permit (EEWP)

To authorize justified energized work while documenting hazards and required protections.

3
New cards

Qualified Person

Someone trained to recognize electrical hazards and safely work on energized equipment.

4
New cards

Restricted Approach Boundary

The distance from exposed energized parts where only qualified persons with proper precautions may enter.

5
New cards

Limited Approach Boundary

The distance where an electrical shock hazard exists and access must be controlled.

6
New cards

Incident energy

The thermal energy released during an arc flash at a specified working distance.

7
New cards

ATPV

Arc Thermal Performance Value—the arc rating of protective clothing.

8
New cards

Personal Protective Equipment (PPE)

The last line of defense against electrical hazards.

9
New cards

Leather protectors

Worn over rubber gloves to protect the rubber gloves from physical damage.

10
New cards

Rubber insulating gloves

Must be electrically tested before first issue and at required periodic intervals, typically every 6months6\,months while in service.

11
New cards

Rubber glove pre-use check

Perform a visual inspection and an air test before each use.

12
New cards

Ozone

Deteriorates rubber and causes cracking; rubber gloves should be kept away from it.

13
New cards

Arc-rated clothing

To reduce burn injury from an arc flash.

14
New cards

Contaminated PPE

If contaminated with oil or grease, it must be removed from service until properly cleaned or replaced.

15
New cards

Infrared thermography

The safest way to verify overheating electrical equipment.

16
New cards

Job briefing

A discussion of hazards, work procedures, responsibilities, and emergency actions before work begins.

17
New cards

Shock risk assessment

An evaluation of electrical shock hazards and protective measures.

18
New cards

Arc flash risk assessment

An evaluation used to determine incident energy, boundaries, and PPE requirements.

19
New cards

Safety attendant

To observe work and respond during an emergency.

20
New cards

Situational awareness

Recognizing hazards and anticipating changes in the work environment.

21
New cards

Absence of voltage verification

The first action after isolating equipment.

22
New cards

Live–Dead–Live testing

Used to confirm the voltage tester is operating correctly before and after testing.

23
New cards

Proximity voltage detector

Used to detect the presence of voltage without direct contact.

24
New cards

Exact absence of voltage confirmation

An approved contact voltage tester or phasing tester.

25
New cards

Temporary protective grounds

Installed to protect workers from induced or accidental energization.

26
New cards

Equipotential zone

An area where all grounded objects are at the same electrical potential.

27
New cards

Hot stick

To safely operate or test energized high-voltage equipment.

28
New cards

Shepherd's Hook

Used to rescue a person from energized equipment.

29
New cards

Sanction for Test

A permit allowing controlled energized testing after isolation procedures.

30
New cards

Permit to Work

A document controlling hazardous maintenance activities.

31
New cards

Earthing switch

To connect isolated equipment to ground.

32
New cards

Automatic shutters

Installed on withdrawable breakers to cover energized contacts when the breaker is removed.

33
New cards

HRC fuse

A High Rupturing Capacity fuse used for short-circuit protection.

34
New cards

Megger

An instrument that measures insulation resistance.

35
New cards

Polarization Index formula

10-minute insulation resistance1-minute insulation resistance\frac{10\text{-minute insulation resistance}}{1\text{-minute insulation resistance}}

36
New cards

Low Polarization Index

Indicates possible insulation deterioration or contamination.

37
New cards

Insulation resistance factors

Temperature, humidity, contamination, and insulation condition.

38
New cards

Switchgear

Used to control, protect, and isolate electrical systems.

39
New cards

Vacuum circuit breakers

Preferred because they require little maintenance and extinguish arcs efficiently.

40
New cards

Load shedding

Automatic removal of nonessential electrical loads to protect the power system.

41
New cards

Emergency generator

Required to automatically restore essential power after loss of the main supply.

42
New cards

Grounding

Reduces shock hazards and provides a path for fault current.

43
New cards

Touch potential

The voltage difference between an energized object and the ground where a person is standing.

44
New cards

Step potential

The voltage difference between a person's feet during a ground fault.

45
New cards

Ventricular fibrillation

The heart condition that is most dangerous from electric shock.

46
New cards

Electrical burns cause

Heat generated by electrical current or an arc.

47
New cards

Arc blast

The pressure wave produced by an electrical arc.

48
New cards

Arc flash

Intense heat and light produced by an electrical arc.

49
New cards

De-energized electrical work

Should be performed whenever it is feasible to do so.

50
New cards

Primary goal of electrical safety

Protect personnel from shock, arc flash, and other electrical hazards.