CEA

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/41

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 11:02 AM on 6/26/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

42 Terms

1
New cards

PTI

Platform Train Interface

2
New cards

CBTC

Communication Base Train Control

3
New cards

OLE

Overhead Line Equipment

4
New cards

ABC-P

Accurate, Brief, Clear, Profesional

5
New cards

PASS

Pull, aim, squeeze, sweep

6
New cards

What are the elements of a fire triangle?

Fuel, heat, oxygen

7
New cards

OLE voltage

25.000 AC

8
New cards

Class A fire

Wood, paper, textile (paper textails)

9
New cards

Class B fire

Flammable liquids

10
New cards

Class C fire

Flammable gas

11
New cards

Class D fire

Burning metals

12
New cards

ECO

Electrical Control Operator

13
New cards

ORR

Office of Rail & Road

14
New cards

Foam

Cream

15
New cards

Co2

Black

16
New cards

Dry powder

Blue

17
New cards

Water

Red

18
New cards

Class A and B

Foam - cream

19
New cards

Class B & electrical

Co2 - black

20
New cards

Class A, B, C, D, electrical

Dry powder - blue

21
New cards

Class A

Water - red

22
New cards

4 stages of communication structure

  • opening

  • Information

  • Actions

  • Confirmation

23
New cards

How to reset fire panel

  1. Mute

  2. Silence

  3. Reset

24
New cards

4 reasons why fire panel can go straight into Evacuation

  • manual operation

  • 2 devices on

  • A device in a Secure room

  • Emergency services

25
New cards

Dispatch corridor

  • full length of the train

  • Gap between the train & the platform

  • The length of the platform accommodated by the train

  • At least the height of the train doors

26
New cards

Equipment affected when station goes into stage 2 alarm

  • lifts

  • EDNE sign

  • Dali lighting

  • Gateline

27
New cards

Red sign

Fire

28
New cards

Green sign

Safe

29
New cards

Blue sign

Mandatory

30
New cards

Yellow sign

Warning

31
New cards

Red circle crossed

Prohibition

32
New cards

Surface station document

The Regulatory Reform (Fire Safety) Order 2005

33
New cards

Sub-Surface documents

The Fire Precaution (Sub Surface Railway Stations) (England) Regulations 2009

34
New cards

Rule of 3

  1. Raise the alarm

  2. Call fire brigade

  3. Evacuate

35
New cards

OUT

I have finished my message, no reply is expected

36
New cards

4 methods to stop a train

  • raise 2 arms above the head with a red light or red flag

  • Contact the signaller

  • Raise 2 arms above the head

  • Any light waved vigorously

37
New cards

3 things that are found in refuge point

  • intercom

  • CCTV

  • Green signage

38
New cards

RSSB

Rail Safety Standards Board

39
New cards

Features of Fire Doors

  • doors that are made of fire-resistant materials

  • Doors that have a self-closing arm

  • Doors that feature intumescent smoke seals

40
New cards

Completed room

Utilisation of fire-resistant materials in walls, ceilings, floors & closing mechanism

41
New cards

Features of smoke dampers

  • must have a Louvre-type window consisting of steel panels or blades in the frame

  • Close automatically if smoke or fire is detected

  • Fire resistance rated in line with the compartmented space

42
New cards