Chapter 7: Just-in-Time and Lean Systems

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
full-widthPodcast
1
Card Sorting

1/27

flashcard set

Earn XP

Description and Tags

Flashcards covering the core beliefs, elements, and impacts of Just-in-Time (JIT) and Lean systems as presented in Chapter 7 of Reid & Sanders' Operations Management.

Last updated 4:28 AM on 8/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

28 Terms

1
New cards

Just-in-Time (JIT)

An all-encompassing philosophy geared to eliminate waste—anything that does not add value—by getting the right quantity of goods at the right place and the right time.

2
New cards

Lean production / Lean systems

A broad view of JIT that encompasses the entire organization.

3
New cards

Toyota Motor Co.

The Japanese company where the JIT philosophy originated following WWII to survive devastation.

4
New cards

Kaizen blitz

A method often used in JIT to achieve continuous improvement.

5
New cards

Flexibility

An organizational strategy in which a company attempts to offer a greater variety of product choices to its customers.

6
New cards

JIT manufacturing

A philosophy of value-added manufacturing that focuses on production systems to achieve efficiency through elements like kanbans and small lot sizes.

7
New cards

Total Quality Management (TQM)

An integrated effort designed to improve quality performance at every level of the organization.

8
New cards

Respect for people

A JIT element based on the philosophy that human resources are an essential part of the JIT system, requiring mutual trust and worker empowerment.

9
New cards

Pull system

A production system where the last workstation requests precise amounts of materials from the previous station, working backwards from demand.

10
New cards

Kanban

A production system using cards or signals to ensure the right quantities of parts arrive when and where they are needed.

11
New cards

Variable TT in Kanban calculation

The time it takes to receive an order from the previous workstation, also known as the lead time.

12
New cards

Variable SS in Kanban calculation

Safety stock used to protect against variability, usually expressed as a percentage of demand during lead time.

13
New cards

Kanban square

A designated space on the factory floor used for storing supplies.

14
New cards

Signal kanban

Also known as flags, these are used to indicate when supplies need to be ordered.

15
New cards

External setup

Setup preparation that can be performed while the present job is still running on the machine.

16
New cards

Internal setup

Setup steps that require the machine to be stopped to simplify, eliminate, or shorten adjustments.

17
New cards

Single digit setups

A goal to reduce machine setup times to less than 10minutes10\,\text{minutes}.

18
New cards

Uniform Plant Loading

The use of a level schedule so that the same mix of products is made every day in small quantities.

19
New cards

Cell manufacturing

The placement of dissimilar machines and equipment together to produce a family of products with similar processing requirements.

20
New cards

U-shaped lines

A facility layout that provides flexibility and allows material handlers to quickly drop off materials and pick up finished work.

21
New cards

Jidoka

A TQM concept in JIT giving workers the authority to stop the production line.

22
New cards

Poka-yoke

Foolproof devices or mechanisms used to build quality into the process and prevent errors.

23
New cards

Preventative maintenance

Regular inspections and maintenance performed to keep machines operational and avoid unexpected breakage.

24
New cards

Bottom-round management

Consensus management practiced by committees or teams, emphasizing the role of production employees.

25
New cards

Quality circles

Small volunteer teams of employees that work together to solve quality problems.

26
New cards

Single-source suppliers

Suppliers that can provide an entire family of parts, allowing for long-term relationships and fewer contracts.

27
New cards

Push production

A traditional manufacturing system that anticipates future demand and produces items in advance.

28
New cards

Activity-based costing

The method used by accounting in a JIT environment to allocate overhead rather than using traditional methods.