08. PP ARCC- PD1096, FIRE CODE, BP344

0.0(0)
Studied by 1 person
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/103

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:12 PM on 8/10/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

104 Terms

1
New cards

- traditional indigenous family dwelling

- projects covered by BP220

what is excluded and is not required to use NBCP as a requirement to construct?

2
New cards

addition

any new construction increasing the height and/or floor area

3
New cards

alteration

changes in materials, partitioning, openings, or utilities that do not increase height or floor area

4
New cards

conversion

a change in the use of occupancy of a building

5
New cards

renovation

any physical change made to increase value, quality, or improve aesthetics

6
New cards

- public buildings (government)

- traditional indigenous family dwelling (less than 15k, native materials, single family)

who are exempted from building permit fees

7
New cards

null and void

what happens to the building permit if you lack ancillary permits

8
New cards

false, mandatory

true or false:

a location clearance from the city/ municipal zoning administration is optional

9
New cards

building permit will be void

what happens if after 1 yr of issuance of building permit, there is still no construction?

10
New cards

120 days

how long can a work be suspended or paused for the building permit not be voided?

11
New cards

false, subject to most restrictive requirement

true or false:

when a building has mixed occupancy, the whole building is subject to whichever has high percentage of space.

12
New cards

occupancy

defines how a specific building within that zone is used

13
New cards

zoning

dictates where land can be used, density, development controls

14
New cards

R1

Low-density residential zone, characterized mainly by single-family, single detached dwellings with the usual community ancillary uses on a neighborhood scale, such as executive subdivisions and relatively exclusive residential communities which are not subdivisions

15
New cards

R2 BASIC

Single-attached or duplex building/structure of from one (1) storeyup to three (3) storeysin height and with each unit for separate use as single-family dwellings

16
New cards

R2 MAX

Low-rise multi-level building/structure of from three (3) up to five (5) storeysin height and for use as multiple family dwellings

17
New cards

R3 BASIC

Row house building/structure of from one (1) storey up to three (3) storeys in height and with each unit for separate use as single-family dwellings

18
New cards

R3 MAX

Medium-rise multi-level building/ structure of from six (6) up to twelve (12) storeys in height and for use as multiple family dwellings

19
New cards

R4

A medium to high-density residential use or occupancy, characterized mainly as a low-rise townhouse building/ structure for exclusive use as multiple family dwellings

20
New cards

R5

A very high-density residential use or occupancy, characterized mainly as a medium-rise or high-rise condominium building/structure for exclusive use as multiple family dwelling

21
New cards

PSO (Percentage of Site Occupancy)

portion of the lot that can be covered by the building footprint

22
New cards

TOSL (total open space of the lot)

the remaining portion of the lot not covered by the PSO, dedicated to yards, courts, and setback

23
New cards

10% of rooms floor area

according to NBCP for rooms without artificial ventilation, the total free area of windows must be at least _____________

24
New cards

2.7m

minimum floor to ceiling height for naturally ventilated rooms

25
New cards

occupant load

the maximum number of people a space is designed to safely hold

26
New cards

1.80

what is the unit area in sqm per occupant in a classroom use

27
New cards

9.30

what is the unit area in sqm per occupant in a office use

28
New cards

0.65

what is the unit area in sqm per occupant in a auditorium use

29
New cards

2

how many exit is required for occupant load less than 500

30
New cards

3

how many exit is required for occupant load 500-999

31
New cards

4

how many exit is required for occupant load 1000 or more

32
New cards

not less than 1/5 of the perimeter of the area served

if 2 exits are required they must be placed a distance apart of

33
New cards

60m

with sprinkler system what is the maximum travel distance to exits

34
New cards

45m

without sprinkler system what is the maximum travel distance to exits

35
New cards

1.1m

what is the minimum stairway dimension according to NBCP For occupant load less than 50

36
New cards

200MM, 250MM

maximum rise and minimum rise of stairs as per NBCP

37
New cards

3m

minimum clear height of arcades above the sidewalk, vertoical clearance of canopies/ marquees, and balconies

38
New cards

2.4m

minimum height of fences

39
New cards

1.2m

when sidewalk is closed a temporary walkway of not less than _______ wide must be provided

40
New cards

development controls

A set of inter-acting regulationsconcerning the physical utilization of a lot and likewise governing the planning/design of spaces and/or the use or occupancy of a building/structure to be introduced (or already existing) on a lot

41
New cards

development controls

help determine in detail the Development Potential

and/or the Carrying Capacityof all lots and/or of proposed developments on lots.

42
New cards

It can be enforced on any building, regardless of when it was built.

what is the meaning of this: fire code is retrospective

43
New cards

architect in charge of construction

who signs for occupancy permit

44
New cards

Fire Safety Inspection Certificate

No

Certificate of Occupancy, Business Permit or Permit to Operate

shall be issued without securing a

45
New cards

means of egress

a continuous and unobstructed route of exit from one point in a building, structure, or facility to a public way.

46
New cards

Access, Exit, Exit discharge

what are the 3 distinct parts of means of egress

47
New cards

exit

That portion of means of egress that is separated from all other spaces of a building or structure by construction, location, or equipment as required to provide a protected way of travel to the exit discharge.

48
New cards

access

That portion of means of egress that leads to an exit.

49
New cards

exit discharge

That portion of a means of egress between the termination of an exit and a public way.

50
New cards

3m

Public Way. A street, alley, or other similar parcel of land open to the outside air, deeded to the public, with a clear width and height of at least ___________

51
New cards

self-closing fire resistive door

Any opening in the separation wall/construction shall be protected by an approved

52
New cards

1hr

for protective enclosures of exit of 3 storeys what is the fire resistance duration

53
New cards

2hrs

for protective enclosures of exit of 4 or more storeys what is the fire resistance duration

54
New cards

915mm

The width of any means of egress shall not be less than

55
New cards

the number of fixed seats installed

The occupant load of an area having fixed seats shall be determined by

56
New cards

not less than two (2) exits by separate ways of travel

When exits are not immediately accessible from an open floor area, continuous passageways, aisles, or corridors leading directly to every exit shall be maintained and shall be arranged to provide access for each occupant to

57
New cards

not less than 1/2 of the length of the maximum overall diagonal dimension of the building

When two (2) exits or exit access doors are required, they shall be located at a

distance from one another

58
New cards

false, single exit

true or false:

interlocking or scissor stairs are considered 2 exits for new buildings

59
New cards

6m

Means of egress shall be so arranged that there are no dead-end pockets, hallways, corridors, passage ways or courts, whose depth exceeds

60
New cards

2m

fire exit The minimum headroom shall not be less than

61
New cards

side-hinged or pivoted-swinging type

Any door in a means of egress shall be of the

62
New cards

1/2 of corridor

When the door is swinging open, it cannot block more than

63
New cards

178mm

When the door is completely open, it must not stick into the corridor by more than:

64
New cards

not less than the width of the door

he landing shall have a width...

65
New cards

710mm

Door openings in means of egress shall not be less than

66
New cards

1.22m

No single door in a doorway shall exceed a width of

67
New cards

915mm

What is the minimum clear width of a stair serving fewer than 50 occupants, excluding projections below handrail height?

68
New cards

1120mm

What is the minimum clear width of a stair serving less than 2000 occupants, excluding projections below handrail height?

69
New cards

1420mm

What is the minimum clear width of a stair serving more than 2000 occupants, excluding projections below handrail height?

70
New cards

applies only to events, construction, or changes that occur after the law takes effect

what is the meaning of this:bp344 is prospective

71
New cards

10%

how many percent of the total units for government housing shall be accessible

72
New cards

1.1m x 0.8m

wheelchair size

73
New cards

1.8m

wheelchair turning diameter

74
New cards

0.4m

lowest point a person on a wheelchair can can reach

75
New cards

1.2m

highest point a person on a wheelchair can can reach

76
New cards

1.2m

Minimum clear width for a PWD ramp

77
New cards

there is dropped sidewalk, curb ramp, an elevator, or other mechanical device

Changes in level shall require a ramp except when

78
New cards

100mm

ramp raised edge on both sides minimum height

79
New cards

tactile warning strips

Ramps shall be provided with __________________ at the head, foot, and landings.

80
New cards

300 mm

handrails must extend __________ past the start and end of the ramp

81
New cards

1.8m

minimum landing length and length of level area before and after the ramp

82
New cards

10.50m

Maximum total length allowed for a ramp with 1:15 slope

83
New cards

700mm

Maximum rise allowed for a ramp with 1:15 slope

84
New cards

15m

for a 1:20 slope at what length do you need to add landing (landing interval for 1:20 slope)

85
New cards

10m

for a 1:15 slope at what length do you need to add landing (landing interval for 1:15 slope)

86
New cards

railing across the full width of its lower end

Any ramp with a rise greater than 200 mm and leads down towards an area where vehicular trafficis possible, shall have a

87
New cards

170mm

Handrails

shall be required for accessible ramps for changes in grade higher than

88
New cards

900mm

upper handrail height for accessible ramp and stairs

89
New cards

700mm

lower handrail height for accessible ramp and stairs

90
New cards

150mm

for accessible stairs what is the maximum uniform riser

91
New cards

300mm

for accessible stairs what is the minimum uniform treads

92
New cards

1.5m

accessible staircase shall have a clear width of

93
New cards

1.5m

Sidewalks, walkways, and pathways shall have a minimum width of

94
New cards

1.8m

Where space is required for two (2) wheelchairs to pass, the minimum width shall be

95
New cards

2.2m

Sidewalk/walkway headroom shall not be less than

96
New cards

900mm/leaf

according to bp344 All doors shall have a minimum clear width of

97
New cards

1.5m

Corridors shall have minimum clear width of

98
New cards

12 m, 1.8 m × 1.8 m

for Every _________ along a long corridor, you must provide a ___________ turnabout space

99
New cards

2

Highly populated or high occupancy buildings shall be able to accommodate at least _________ wheelchair users per elevator at the same time

100
New cards

30m

accessible elevators should be how far from the entrance