Calculated travel for a 45 Degree pipe offset with a center-to-center run of 28inches
Travel: 3’ 3 9/16”
What are the four functional valves found on all steaming boilers?
Main steam valve
Feed water valve
Blow off valve
Safety valve
What is the minimum clearance required around a pipe or pipe covering when passing through a pipe sleeve?
1/4inch (1/4").
What shall the discharge of a high pressure trap run through before emptying into a low pressure receiver?
A flash tank.
When the temperature exceeds ___
F, only bolt studs are recommended.
750
How should thermal expansion of piping preferably be provided for?
pipe bands
Offsets
Expansion loops
Changes in direction of Pipeline
Mechanical expansion joints
Variations in pressure and temperature not exceeding the allowable S value may occur
Up to 15 percent increase during the event for no more than 8 hours, 800 hours per year.
For all lines under pressure and above 250∘F, what should the gasket material be composed of?
Asbestos, non-burning material, or metallic material.
How many valves are required in a drain line?
1
Under what temperature condition must piping be insulated when passing through pipe sleeves?
When the temperature is over 250∘F.