C215 - Chp 10: Facility Layout

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/22

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 1:07 AM on 9/21/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

23 Terms

1
New cards

ALDEP and CRAFT

Computer software packages for designing process layouts.

2
New cards

Balance delay

The amount by which the line efficiency falls short of 100 percent.

3
New cards

Block plan

Schematic showing the placement of resources in a facility.

4
New cards

Cells

Hybrid layouts that create groups of products based on similar processing requirements

5
New cards

Cycle time

The maximum amount of time each workstation has to complete its assigned tasks.

6
New cards

Efficiency

The ratio of total productive time divided by total time, given as a percentage.

7
New cards

Fixed-position layout

A layout in which the product cannot be moved due to its size and all the resources have to come to the production site.

8
New cards

Flexible layouts

Layouts that remain desirable many years into the future or can be easily modified to meet changing demand.

9
New cards

From-to matrix

Table that gives the number of trips or units of product moved between any pair of departments.

10
New cards

Hybrid layouts

that combine characteristics of process and product layouts.

11
New cards

Immediate predecessor

A task that must be performed immediately before another task.

12
New cards

Intermittent processing systems

Systems used to produce low volumes of many different products.

13
New cards

Layout planning

Deciding on the best physical arrangement of all resources that consume space within a facility.

14
New cards

Line balancing

The process of assigning tasks to workstations in a product layout in order to achieve a desired output and balance the workload among stations.

15
New cards

Mixed-model line

A line designed to produce many versions of a product.

16
New cards

Output rate

The number of units we wish to produce over a specific period of time.

17
New cards

Paced line

A system in which the product being worked on is physically attached to the line and automatically moved to the next station when the cycle time has elapsed.

18
New cards

Process layouts

Layouts that group resources based on similar processes or functions.

19
New cards

Product layouts

Layouts that arrange resources in sequence to allow for an efficient buildup of the product.

20
New cards

REL chart

Table that reflects opinions of managers with regard to the importance of having any two departments close together.

21
New cards

Repetitive processing systems

Systems used to produce high volumes of a few standardized products.

22
New cards

Single-model line

A line designed to produce only one version of a product.

23
New cards

Theoretical minimum number of stations

The number of workstations needed on a line to achieve 100 percent efficiency.