1/17
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
A.F.F (Above Finish Floor)
Height of floor after finished with final covering
Bench Mark (B.M)
Level reference line
Compound Miter Saw
Vertical saw that cuts 45-90 degree cuts
Course
Shingles of a roof
Layers or rows of masonry brick bonded with mortar
Daylight Opening
Where the door fits; the space between the door and the door jamb (1/4”)
Drywall
System of interior wall finishes using sheets of gypsum board and taped joints. Standard width is 48”
Eq-Eq
Equal-Eqaul, exact measurement unknown but your should have an equal amount on either side
Field Dimensions
Actual site dimensions (true)
Green board
Moisture control (MR board)
Gypsum Wall Board (G.W.B)
Panels or slabs consisting of a non combustible gypsum core edged with covering material (wallboards sheathing backing boards form boards drywall or sheet rock)
Insulation
Material used to make a building more energy efficient, protection from heat cold fire sound reduction
Live load
Weight of a structure consisting of moveable objects or persons (flat roof live road is 20psf
Plumb
Vertical, perpendicular to level
PVC
Poly vinyl chloride
Rebar
Reinforcing bards used to increase the tensile strength of concrete
Story pole
stick made with all info needed for a specific layout that can be used all around
Stud
slender wood or metal vertical structural members placed as supporting elements in walls or partitions
Water level
Clear tube with water used to transfer a point from one place to another that is level with the first