BT4: SPECIFICATIONS & SPECS WRITING PT. 2

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/55

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 11:14 PM on 4/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

56 Terms

1
New cards

1

[masterformat divisions] General Requirements

2
New cards

2

[masterformat divisions] Sitework

3
New cards

3

[masterformat divisions] Concrete

4
New cards

4

[masterformat divisions] Masonry

5
New cards

5

[masterformat divisions] Metals

6
New cards

6

[masterformat divisions] Wood and Plastics

7
New cards

7

[masterformat divisions] Thermal and Moisture Protection

8
New cards

8

[masterformat divisions] Doors and Windows

9
New cards

9

[masterformat divisions] Finishes

10
New cards

10

[masterformat divisions] Specialties

11
New cards

11

[masterformat divisions] Equipment

12
New cards

12

[masterformat divisions] Furnishings

13
New cards

13

[masterformat divisions] Special Construction

14
New cards

14

[masterformat divisions] Conveying Systems

15
New cards

15

[masterformat divisions] Mechanical

16
New cards

16

[masterformat divisions] Electrical

17
New cards

21

[CSI Masterformat 2004 Edition] Fire Supression

18
New cards

22

[CSI Masterformat 2004 Edition] Plumbing

19
New cards

23

[CSI Masterformat 2004 Edition] Heating, Ventilatinmg, and Air Conditioning

20
New cards

25

[CSI Masterformat 2004 Edition] Integrated Automation

21
New cards

26

[CSI Masterformat 2004 Edition] Electrucal

22
New cards

27

[CSI Masterformat 2004 Edition] Communications

23
New cards

[CSI Masterformat 2004 Edition] Electronic Safety and Security

24
New cards

31

[CSI Masterformat 2004 Edition] Earthwork

25
New cards

32

[CSI Masterformat 2004 Edition] Exterior Improvements

26
New cards

33

[CSI Masterformat 2004 Edition] Utilities

27
New cards

34

[CSI Masterformat 2004 Edition] Transportation

28
New cards

35

[CSI Masterformat 2004 Edition] Waterway and Marine Construction

29
New cards

40

[CSI Masterformat 2004 Edition] Process Integration

30
New cards

41

[CSI Masterformat 2004 Edition] Material Processing and Handling Equipment

31
New cards

42

[CSI Masterformat 2004 Edition] Process Heating, Cooling, Drying Equipment

32
New cards

43

[CSI Masterformat 2004 Edition] Process Gas and Liquid Handling, Purification and Storage Equipment

33
New cards

44

[CSI Masterformat 2004 Edition] Pollution Control Equipment

34
New cards

45

[CSI Masterformat 2004 Edition] Industry-specific Manufacturing Equipment

35
New cards

48

[CSI Masterformat 2004 Edition] Electrical Power Generation

36
New cards

Part 1: General

[CSI Three part Section Format] This part covers those general areas of concern which precede and follow work, and which define the scope of work.

37
New cards

Part 2: Products

[CSI Three part Section Format] This part defines in detail the materials. equipment. system, fixtures, etc., which will be incorporate.d into the work.

38
New cards

Part 3: Execution

[CSI Three part Section Format] describes in detail the manner in which items covered in part two are to be incorporated into the work.

39
New cards

Summary

[CSI: Part 1 - General components]

A. Scope of Work

B. Work of other section

C. Related Section

D. Allowances

E. Unit Prices

F. Measurement and Payment

G. Alternates

40
New cards

Systems Description

[CSI: Part 1 - General components] generally applicable to mechanical, electrical, elevators, and process equipment and specified in those sections

41
New cards

Submittals

[CSI: Part 1 - General components] enumerate the various types of dataa to be submitted for architect's review.

42
New cards

quality assurance

[CSI: Part 1 - General components] srtabdards, qualifications, regulatory requirements, mock-up

43
New cards

delivery, storage, handling

[CSI: Part 1 - General components] general provisisons governing the transportation, handling, storage and protetcion of material and equipment

44
New cards

project/site conditions

[CSI: Part 1 - General components] specification subparagraphs dealing with physical environmental conditions under which the work is to be performed should be specified here

45
New cards

warranty

[CSI: Part 1 - General components] paragraph to set forth the requriements for correcting defects that extend beyond 1 year correction of work period

46
New cards

systems start up

[CSI: Part 1 - General components] generally applicable to mechanical, ellectrical, elevators, and process equipment and specified in those sections

47
New cards

mixes

[CSI: Part 2 - Products] whether prepared on or off site, specify material proportions

48
New cards

finishes

[CSI: Part 2 - Products] shop priming, shop finishing

49
New cards

source quality control

[CSI: Part 2 - Products] test and inspections of products fabricated off site

50
New cards

acceptable installers

[CSI: Part 3 - Execution] use in only very special instances where expert knowledge and worksmanship is paramount

51
New cards

preparation

[CSI: Part 3 - Execution] subparagraphs headings as field measurements, printing and so on; water proofing and damp proofing

52
New cards

erection/ installation/ application/ construction

[CSI: Part 3 - Execution] include various subparagraph detailing the requirements for installation details, construction and erection methods and quality of worksmanship

53
New cards

field quality control

[CSI: Part 3 - Execution] etst and inspection procedures to determine adequacy of work completed and installed are specified

54
New cards

adjusting

[CSI: Part 3 - Execution] would include putting builders hardware into operating condition balancing of mechanical ventilation systems etc

55
New cards

demonstration

[CSI: Part 3 - Execution] focuses primarily to mechanical adn electrical systems, elevators etc.

56
New cards

schedules

[CSI: Part 3 - Execution] includes items such as hardware schedules, lighting fixtures, and so forth

Explore top flashcards

flashcards
Mankind: the story of all of us
49
Updated 597d ago
0.0(0)
flashcards
APUSH Chapter 20
49
Updated 1130d ago
0.0(0)
flashcards
English 1h Semester two Final
149
Updated 1047d ago
0.0(0)
flashcards
Cardiovascular System
58
Updated 1140d ago
0.0(0)
flashcards
Lenses
21
Updated 29d ago
0.0(0)
flashcards
frans - vocabulaire p18-20
61
Updated 545d ago
0.0(0)
flashcards
Mankind: the story of all of us
49
Updated 597d ago
0.0(0)
flashcards
APUSH Chapter 20
49
Updated 1130d ago
0.0(0)
flashcards
English 1h Semester two Final
149
Updated 1047d ago
0.0(0)
flashcards
Cardiovascular System
58
Updated 1140d ago
0.0(0)
flashcards
Lenses
21
Updated 29d ago
0.0(0)
flashcards
frans - vocabulaire p18-20
61
Updated 545d ago
0.0(0)