BT4: SPECIFICATIONS & SPECS WRITING PT. 2

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/55

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:43 AM on 7/19/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

56 Terms

1
New cards

1

[masterformat divisions] General Requirements

2
New cards

2

[masterformat divisions] Sitework

3
New cards

3

[masterformat divisions] Concrete

4
New cards

4

[masterformat divisions] Masonry

5
New cards

5

[masterformat divisions] Metals

6
New cards

6

[masterformat divisions] Wood and Plastics

7
New cards

7

[masterformat divisions] Thermal and Moisture Protection

8
New cards

8

[masterformat divisions] Doors and Windows

9
New cards

9

[masterformat divisions] Finishes

10
New cards

10

[masterformat divisions] Specialties

11
New cards

11

[masterformat divisions] Equipment

12
New cards

12

[masterformat divisions] Furnishings

13
New cards

13

[masterformat divisions] Special Construction

14
New cards

14

[masterformat divisions] Conveying Systems

15
New cards

15

[masterformat divisions] Mechanical

16
New cards

16

[masterformat divisions] Electrical

17
New cards

21

[CSI Masterformat 2004 Edition] Fire Supression

18
New cards

22

[CSI Masterformat 2004 Edition] Plumbing

19
New cards

23

[CSI Masterformat 2004 Edition] Heating, Ventilatinmg, and Air Conditioning

20
New cards

25

[CSI Masterformat 2004 Edition] Integrated Automation

21
New cards

26

[CSI Masterformat 2004 Edition] Electrucal

22
New cards

27

[CSI Masterformat 2004 Edition] Communications

23
New cards

[CSI Masterformat 2004 Edition] Electronic Safety and Security

24
New cards

31

[CSI Masterformat 2004 Edition] Earthwork

25
New cards

32

[CSI Masterformat 2004 Edition] Exterior Improvements

26
New cards

33

[CSI Masterformat 2004 Edition] Utilities

27
New cards

34

[CSI Masterformat 2004 Edition] Transportation

28
New cards

35

[CSI Masterformat 2004 Edition] Waterway and Marine Construction

29
New cards

40

[CSI Masterformat 2004 Edition] Process Integration

30
New cards

41

[CSI Masterformat 2004 Edition] Material Processing and Handling Equipment

31
New cards

42

[CSI Masterformat 2004 Edition] Process Heating, Cooling, Drying Equipment

32
New cards

43

[CSI Masterformat 2004 Edition] Process Gas and Liquid Handling, Purification and Storage Equipment

33
New cards

44

[CSI Masterformat 2004 Edition] Pollution Control Equipment

34
New cards

45

[CSI Masterformat 2004 Edition] Industry-specific Manufacturing Equipment

35
New cards

48

[CSI Masterformat 2004 Edition] Electrical Power Generation

36
New cards

Part 1: General

[CSI Three part Section Format] This part covers those general areas of concern which precede and follow work, and which define the scope of work.

37
New cards

Part 2: Products

[CSI Three part Section Format] This part defines in detail the materials. equipment. system, fixtures, etc., which will be incorporate.d into the work.

38
New cards

Part 3: Execution

[CSI Three part Section Format] describes in detail the manner in which items covered in part two are to be incorporated into the work.

39
New cards

Summary

[CSI: Part 1 - General components]

A. Scope of Work

B. Work of other section

C. Related Section

D. Allowances

E. Unit Prices

F. Measurement and Payment

G. Alternates

40
New cards

Systems Description

[CSI: Part 1 - General components] generally applicable to mechanical, electrical, elevators, and process equipment and specified in those sections

41
New cards

Submittals

[CSI: Part 1 - General components] enumerate the various types of dataa to be submitted for architect's review.

42
New cards

quality assurance

[CSI: Part 1 - General components] srtabdards, qualifications, regulatory requirements, mock-up

43
New cards

delivery, storage, handling

[CSI: Part 1 - General components] general provisisons governing the transportation, handling, storage and protetcion of material and equipment

44
New cards

project/site conditions

[CSI: Part 1 - General components] specification subparagraphs dealing with physical environmental conditions under which the work is to be performed should be specified here

45
New cards

warranty

[CSI: Part 1 - General components] paragraph to set forth the requriements for correcting defects that extend beyond 1 year correction of work period

46
New cards

systems start up

[CSI: Part 1 - General components] generally applicable to mechanical, ellectrical, elevators, and process equipment and specified in those sections

47
New cards

mixes

[CSI: Part 2 - Products] whether prepared on or off site, specify material proportions

48
New cards

finishes

[CSI: Part 2 - Products] shop priming, shop finishing

49
New cards

source quality control

[CSI: Part 2 - Products] test and inspections of products fabricated off site

50
New cards

acceptable installers

[CSI: Part 3 - Execution] use in only very special instances where expert knowledge and worksmanship is paramount

51
New cards

preparation

[CSI: Part 3 - Execution] subparagraphs headings as field measurements, printing and so on; water proofing and damp proofing

52
New cards

erection/ installation/ application/ construction

[CSI: Part 3 - Execution] include various subparagraph detailing the requirements for installation details, construction and erection methods and quality of worksmanship

53
New cards

field quality control

[CSI: Part 3 - Execution] etst and inspection procedures to determine adequacy of work completed and installed are specified

54
New cards

adjusting

[CSI: Part 3 - Execution] would include putting builders hardware into operating condition balancing of mechanical ventilation systems etc

55
New cards

demonstration

[CSI: Part 3 - Execution] focuses primarily to mechanical adn electrical systems, elevators etc.

56
New cards

schedules

[CSI: Part 3 - Execution] includes items such as hardware schedules, lighting fixtures, and so forth