1
[masterformat divisions] General Requirements
2
[masterformat divisions] Sitework
3
[masterformat divisions] Concrete
4
[masterformat divisions] Masonry
5
[masterformat divisions] Metals
6
[masterformat divisions] Wood and Plastics
7
[masterformat divisions] Thermal and Moisture Protection
8
[masterformat divisions] Doors and Windows
9
[masterformat divisions] Finishes
10
[masterformat divisions] Specialties
11
[masterformat divisions] Equipment
12
[masterformat divisions] Furnishings
13
[masterformat divisions] Special Construction
14
[masterformat divisions] Conveying Systems
15
[masterformat divisions] Mechanical
16
[masterformat divisions] Electrical
21
[CSI Masterformat 2004 Edition] Fire Supression
22
[CSI Masterformat 2004 Edition] Plumbing
23
[CSI Masterformat 2004 Edition] Heating, Ventilatinmg, and Air Conditioning
25
[CSI Masterformat 2004 Edition] Integrated Automation
26
[CSI Masterformat 2004 Edition] Electrucal
27
[CSI Masterformat 2004 Edition] Communications
[CSI Masterformat 2004 Edition] Electronic Safety and Security
31
[CSI Masterformat 2004 Edition] Earthwork
32
[CSI Masterformat 2004 Edition] Exterior Improvements
33
[CSI Masterformat 2004 Edition] Utilities
34
[CSI Masterformat 2004 Edition] Transportation
35
[CSI Masterformat 2004 Edition] Waterway and Marine Construction
40
[CSI Masterformat 2004 Edition] Process Integration
41
[CSI Masterformat 2004 Edition] Material Processing and Handling Equipment
42
[CSI Masterformat 2004 Edition] Process Heating, Cooling, Drying Equipment
43
[CSI Masterformat 2004 Edition] Process Gas and Liquid Handling, Purification and Storage Equipment
44
[CSI Masterformat 2004 Edition] Pollution Control Equipment
45
[CSI Masterformat 2004 Edition] Industry-specific Manufacturing Equipment
48
[CSI Masterformat 2004 Edition] Electrical Power Generation
Part 1: General
[CSI Three part Section Format] This part covers those general areas of concern which precede and follow work, and which define the scope of work.
Part 2: Products
[CSI Three part Section Format] This part defines in detail the materials. equipment. system, fixtures, etc., which will be incorporate.d into the work.
Part 3: Execution
[CSI Three part Section Format] describes in detail the manner in which items covered in part two are to be incorporated into the work.
Summary
[CSI: Part 1 - General components]
A. Scope of Work
B. Work of other section
C. Related Section
D. Allowances
E. Unit Prices
F. Measurement and Payment
G. Alternates
Systems Description
[CSI: Part 1 - General components] generally applicable to mechanical, electrical, elevators, and process equipment and specified in those sections
Submittals
[CSI: Part 1 - General components] enumerate the various types of dataa to be submitted for architect's review.
quality assurance
[CSI: Part 1 - General components] srtabdards, qualifications, regulatory requirements, mock-up
delivery, storage, handling
[CSI: Part 1 - General components] general provisisons governing the transportation, handling, storage and protetcion of material and equipment
project/site conditions
[CSI: Part 1 - General components] specification subparagraphs dealing with physical environmental conditions under which the work is to be performed should be specified here
warranty
[CSI: Part 1 - General components] paragraph to set forth the requriements for correcting defects that extend beyond 1 year correction of work period
systems start up
[CSI: Part 1 - General components] generally applicable to mechanical, ellectrical, elevators, and process equipment and specified in those sections
mixes
[CSI: Part 2 - Products] whether prepared on or off site, specify material proportions
finishes
[CSI: Part 2 - Products] shop priming, shop finishing
source quality control
[CSI: Part 2 - Products] test and inspections of products fabricated off site
acceptable installers
[CSI: Part 3 - Execution] use in only very special instances where expert knowledge and worksmanship is paramount
preparation
[CSI: Part 3 - Execution] subparagraphs headings as field measurements, printing and so on; water proofing and damp proofing
erection/ installation/ application/ construction
[CSI: Part 3 - Execution] include various subparagraph detailing the requirements for installation details, construction and erection methods and quality of worksmanship
field quality control
[CSI: Part 3 - Execution] etst and inspection procedures to determine adequacy of work completed and installed are specified
adjusting
[CSI: Part 3 - Execution] would include putting builders hardware into operating condition balancing of mechanical ventilation systems etc
demonstration
[CSI: Part 3 - Execution] focuses primarily to mechanical adn electrical systems, elevators etc.
schedules
[CSI: Part 3 - Execution] includes items such as hardware schedules, lighting fixtures, and so forth