Scheduling

pertains to establishing the timing of organizations special resources

2
New cards
  1. equipment

  2. facilities

  3. human activities

Scheduling pertains to…

3
New cards
  1. cost savings

  2. increases productivity

  3. other benefits

Effective scheduling can yield…

4
New cards

Loading Approches

  1. infinite loading

  2. finite loading

5
New cards

Infinite Loading

giving out tasks without checking if the person has time to do them.

6
New cards

Infinite Loading Example

A print shop schedules 20 print jobs for one day on a printer that can only handle 10 jobs per day. They don’t check the printer’s capacity—they just assign all the jobs anyway.

7
New cards

Finite Loading

means scheduling only the amount of work that fits into the time and space available.

8
New cards

Finite Loading Example

A bakery gets 10 cake orders, but the oven can only bake 5 cakes per day. So, the bakery schedules 5 cakes today and 5 cakes tomorrow, based on how much the oven can handle each day.

9
New cards

Scheduling Approaches

  1. Forward scheduling

  2. Backward scheduling

10
New cards

Forward Scheduling

starting work right away and planning everything after that based on the order of tasks and used when the issue is: “how long will it take to complete this job?”

11
New cards

Forward Scheduling Example

A construction company begins building a house as soon as the materials arrive, then schedules all the other tasks (like plumbing and painting) to follow as soon as the previous task is done.

12
New cards

Backward Scheduling

means working backward from the deadline to figure out the best time to start each task.

13
New cards

Backward Scheduling Example

A company has a product launch in two weeks. They plan all the tasks (like production, packaging, and shipping) by working backward from the launch date, ensuring everything is completed just in time.

14
New cards

Sequencing Jobs

Specifies the order in which jobs should be performed at work centers

15
New cards

Job time

time needed for setup and processing of a job

16
New cards

Priority Rules of Sequencing

  1. First come, first served (FCFC)

  2. Shortest Processing Time (SPT)

  3. Earliest Due Date (EDD)

  4. Longest Processing Time (LPT)

  5. Rush

17
New cards

First Come, First Served (FCFS)

processes jobs in the order they arrive, with no special consideration for how long each job takes.

18
New cards

Shortest Processing Time (SPT)

Jobs are processed according to processing time at a machine or work center, shortest job first

19
New cards

Earliest Due Date (EDD)

Jobs are processed according to due date, earliest due date first.

20
New cards

Longest Processing Time (LPT)

Jobs are processed according to processing time at a machine or work center, longest job first.

21
New cards

Rush

Emergency of preferred customers first

22
New cards

Benefits of Shortest Processing Time (SPT)

does well on minimizing flow time and number of jobs in the system

23
New cards

Risks of Shortest Processing Time (SPT)

moves long jobs to the end which may result in dissatisfied customers

24
New cards

Benefits of Earliest Due Date (EDD)

minimizes maximum lateness

25
New cards

Limitations of Rule-Based Dispatching Systems

1.Scheduling is dynamic and rules need to be revised to adjust to changes

2.Rules do not look upstream or downstream

3.Rules do not look beyond due dates

26
New cards

Finite Capacity Scheduling (FCS)

is a smart, visual scheduling tool that keeps work realistic, organized, and flexible when things change.

27
New cards

Finite Capacity Scheduling (FCS) Example

A furniture company uses software to schedule when to cut wood, assemble furniture, and pack orders. If a machine goes down, the system updates the schedule in real time so everything still gets done efficiently and on time.

28
New cards

Steps to Minimize Scheduling Difficulties

  1. set realistic due dates

  2. focus on bottleneck operations

    1. try to increase the capacity

    2. if not possible schedule the bottle neck operations first

  3. consider lot splitting for large jobs

29
New cards

Theory of Constraints: Metrics

  1. throughput

  2. inventory

  3. operating expense

30
New cards

Throughput

the rate at which the system generates money through sales

31
New cards

Inventory

represents money ries up in goods and materials used in a process

32
New cards

Operating Expense

all the money the system spends to convert inventory into throughput: this includes utilities, scrap, depreciation, and so on

33
New cards

throughput up, inventory and operating expense down

From (the Goal) what do we want for the theory of constraints