Quiz 4 Prof Prac

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:03 AM on 8/26/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

30 Terms

1
New cards

Pay for the excess expenses

Architect Lodi rendered a Design-Build Services with a Guaranteed Maximum Project Construction Cost for his Client Mrs. Gwaps, however the actual expenses exceeded 10% of the given estimate. What will Architect Lodi do?

2
New cards

6% DAEDS, 3.6% DADS

The buildings classified as Group 2 MODERATE, are considered to be more complex than SIMPLE buildings. What are the DAEDS and DADS RPF for a MODERATE building with a budget of less than Php. 50 Million.

3
New cards

Install

Build in, mount in positions, connect or apply.

4
New cards

MDPE - Multiple of Direct Personnel Experience

What is the method of compensation applicable for non-creative work?

5
New cards

Contractor

A person or firm whose proposal has been accepted & contract awarded.

6
New cards

Surety

A person, firm, or corporation providing guarantee for contractor's bonds

7
New cards

P1.50

Based on SPP203, for physical planning for building sites. a project with an area over 50 hectares should recommend an rpf of per square meter.

8
New cards

P50,000/ hectare or P5.00 per sq.m

Based on SPP203, for Physical Planning for Building Sites. What is the basic rate for the first 5 hectares or less?

9
New cards

Furnish

It means purchase and/or fabricate and deliver to the jobsite.

10
New cards

Proposal Bond

This term refers to the cashier's check or surety bond with the proposal submitted by the bidder to guarantee that the bidder will enter into the contract.

11
New cards

12%

What is the recommended professional fee for DAEDS for Monumental Projects at any budget?

12
New cards

10% to 15% x Cost of Work

Based on SPP203, what is the method of compensation for architectural interiors, landscape, and acoustics?

13
New cards

3.5M + 6% of excess of 50M DAEDS

The buildings classified as Group 3 EXCEPTIONAL, are the most complicated designs among the three main groups. What are the DAEDS recommended professional fee for an EXCEPTIONAL building with a budget of Php 80 Million.

14
New cards

10% DAEDS, 6% DADS

For RESIDENTIAL projects, the DAEDS RPF is % while the DADS RPF is%.

15
New cards

Performance Bond

It is the approved form of security furnished by the contractor as a guarantee to execute work in accordance with terms of the contract.

16
New cards

5000/appearance

When the Architect is engaged to provide services as an expert witness, the fee shall not be less than per appearance regardless as to whether the scheduled hearing took place or not.

17
New cards

1%

It is the Recommended Professional Fee for Groups 1, 2 and 3 decreases per budget cap from <50M, 50-100M, 100-200M, 200-500M, 500M-1B, 1B+. How much % is decreased per budget cap?

18
New cards

40% of initial RPF each.

A client requested to re-use your set of plans for 15 residential units. For the 11th to 15th units, how much RPF should you charge if you were to provide DAEDS.

19
New cards

Instructions to bidder

It is the list of instructions stipulating the manner on how bids are to be prepared and conditions for the award of contract.

20
New cards

50% - 2nd, 40% - 3rd, 30% - 4th

A client requested plans/designs for a repetitive construction project. For the 2nd, 3rd, and 4th construction, how much of the initial RPF should you charge?

21
New cards

Fee for 10 units plus 24% of RPF for each additional unit.

A client requested to re-use your set of plans for 30 residential units. For the 11th to 30th units, how much RPF should you charge if you were to provide DADS.

22
New cards

Sub-Contractor

Anyone having direct contact with contractor, acts in behalf of the contractor in executing any part of the contract.

23
New cards

Payment Bond

It is the approved form of security furnished by the contractor as guarantee to pay all obligations arising from the contract

24
New cards

Provide

This term shall be understood to mean furnish and install.

25
New cards

50% of initial RPF each.

A client requested to re-use your set of plans for 15 residential units. For the 2nd to 10th units, how much RPF should you charge if you were to provide DAEDS.

26
New cards

150%

For any alternation/renovation works for existing buildings belonging to Groups 1 to 5, how much RPF is the Architect entitled to?

27
New cards

Guarantee Bond

It is the approved form of security furnished by the contractor to guarantee to the quality of materials and workmanship performed.

28
New cards

Invitation to Bid

It is a notice or invitation issued to bidders giving information of the magnitude and extent of the project, nature, etc.

29
New cards

P1000/hour

When the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters, the chargeable RPF shall not be less than subject to increase depending on the extent and coverage of service.

30
New cards

Bid Bulletin

It is the additional information on contract documents