ARE 5.0 CE - Section 2

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/8

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 9:53 PM on 9/18/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

9 Terms

1
New cards

Change Order

An amendment to the construction contract signed by the owner, architect, and contractor authorizing a change in the work, an adjustment in the contract sum or the contract time, or both.

2
New cards

Field Report

A written record that documents what the architect observed during a site visit.


Typically created during construction administration or initial field surveys

3
New cards

Site Visit

The architect’s visit to the construction site to observe the progress of the work.


Any observable deviations from the contract documents are recorded in a field report.

4
New cards

Fast Track

An expedited process where some design services and construction activities overlap as a way to complete the project at a faster pace.

5
New cards

Life Cycle Assessment (LCA)

An analysis that evaluates the total environmental impacts of a product, system, or building throughout its entire life cycle, from material extraction and construction through operation, replacement, and end-of-life disposal.

6
New cards

Deficiencies

A shortcoming or fault.


If this regards work performed by the contractor, it must be noted by the architect in a field report.

7
New cards

Minor Change in the Work

A change to the work, typically issued by the architect as an Architect’s Supplemental Instructions (ASI), that does not affect the contract sum or contract time.

8
New cards

Architect’s Supplemental Instructions (ASI)

A written instruction issued by the architect for minor changes that do not affect the contract sum or schedule.

9
New cards

Construction Change Directive (CCD)

A written directive issued by the owner and architect that requires the contractor to proceed with a change in the work when the parties have not yet agreed on the associated adjustment to the contact time or cost.