Flashcards covering the technical, regulatory, and procedural aspects of Safety, Security, and Safeguards (3S) integration for Advanced and Small Modular Reactors (A/SMRs).

Last updated 1:47 PM on 8/3/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

25 Terms

1
New cards

3S

A framework and goal representing the integration of safety, security, and safeguards together.

2
New cards

2S

A practical pairwise working unit, such as the interface between security and safeguards.

3
New cards

Interfaces

The points where a decision in one domain (safety, security, or safeguards) has consequences for another, involving shared systems, space, data, procedures, or requirement conflicts.

4
New cards

Leading indicators (Interface)

Metrics that measure whether a process is finding and fixing problems early, such as documented unresolved interface issues with an assigned owner before design freeze.

5
New cards

Lagging indicators (Interface)

Metrics that measure interface outcomes after the fact, such as problems identified during facility commissioning.

6
New cards

GUMBAL

A hypothetical pebble bed reactor model, deliberately scrubbed to resemble no real facility, used to demonstrate 3S walkthroughs and layout changes.

7
New cards

Scribe3D

A qualitative 3D3D modeling and simulation tool used for vulnerability analysis and scenario visualization, originating from game engine-based tabletop exercises.

8
New cards

PathTrace

A quantitative pathway analysis tool that complements the qualitative approach of Scribe3D.

9
New cards

DMA (Deliberate Motion Algorithm)

A notional future PIDAS concept utilizing sensor fusion (radar/lidar plus cameras) and ML to detect deliberate movement toward a facility to lower nuisance-alarm rates.

10
New cards

HALEU (High-Assay Low-Enriched Uranium)

Uranium with an enrichment level between 5%5\,\% and 20%20\,\% U-235U\text{-}235, identifying it as more attractive for security and safeguards than conventional LEU.

11
New cards

2024 ADVANCE Act

Legislation supporting NRC modernization and advanced-reactor licensing.

12
New cards

Article 14 (IAEA safeguards agreement)

A provision that allows a state to temporarily withdraw nuclear material from safeguards for non-proscribed military use, such as naval reactor fuel.

13
New cards

Backfit

An NRC term of art per 10 CFR 50.10910\text{ CFR }50.109 for imposing new requirements on a facility that has already been built.

14
New cards

Retrofit

Plain language term used for the modification of a facility, preferred for mixed INMM/ANS audiences over specific regulatory jargon.

15
New cards

PIDAS (Perimeter Intrusion Detection and Assessment System)

A system requiring at least two overlapping, complementary sensor types per zone, maintaining roughly 90%90\,\% detection through environmental disturbance per DG-5076.

16
New cards

10 CFR 73.55 / DG-5076

Core NRC physical protection regulations covering a 45-second45\text{-second} alarm assessment clock, vehicle barrier/standoff of 1.5×1.5\times the DBT explosive quantity, and search requirements.

17
New cards

Ballistic/blast tower

A security structure with a cost anchor of 28M2 \text{--} 8M per unit.

18
New cards

Bistatic microwave sensor pair

A security sensor component with a cost anchor of approximately 10k10k.

19
New cards

Active IR pair

A security sensor component with a cost anchor of approximately 1.5k1.5k.

20
New cards

Shark cage

A delay feature costing between 210k2 \text{--} 10k that adds an estimated 30sec30\,\text{sec} to 1min1\,\text{min} of delay.

21
New cards

Effectiveness

One of three interface success bins, measuring whether integrated objectives still meet their primary goals.

22
New cards

Efficiency

One of three interface success bins, measuring the cost in dollars, space, staff, or burden.

23
New cards

Maturity

One of three interface success bins, measuring whether issues are found and closed early rather than surfacing at licensing.

24
New cards

The equipment interference story

An example from the GUMBAL model where a shark cage was found to physically block access or sightlines needed by another system, illustrating a visible geometry problem.

25
New cards

The radioactive-monitoring gap story