LEED V5

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/24

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:25 AM on 8/19/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

25 Terms

1
New cards

What happens after the project registration fee is paid to GBCI?

The project team gains access to the ARC platform

2
New cards

What term refers to a mandatory project characteristic, measurement,quality, value or function as identified within the LEED Rating System?

Prerequisite

3
New cards

Which is not a Minimum Program Requirement (MPR)?

Commitment to sharing whole-building energy and water usage data

4
New cards

CIR is most likely used for what part of the LEED process?

technical guidance for LEED credits

5
New cards

Which organization is responsible for administering LEED Project Certifications and Professional Accreditations?

GBCI

6
New cards

When is the best time to incorporate an integrative approach for a building project?

Predesign

7
New cards

What is the primary benefit of an integrated process?

Maximizing opportunities for integrated, cost-effective green design and construction strategies

8
New cards

The human impact assessment requires collecting data in which four categories?

Demographics, Local Infrastructure, Human Use & Health, Accessibility Codes

9
New cards

Who conducts the 25-year carbon assessment required in IPp3?

USGBC

10
New cards

In Core and Shell projects, which additional prerequisite is required in the Integrative Process Category?

Tenant Guidelines

11
New cards

What amount of parking will encourage alternative transportation and maximize open space?

The minimum amount required by any local code

12
New cards

How can the site boundary differ from the LEED Project Boundary?

The site boundary is the property line while the LEED Project Boundary is the portion of the site submitted for LEED

13
New cards

What is the best type of site to develop on?

Previously developed site

14
New cards

What types of land are not considered previously developed?

Farm land

15
New cards

How close must a project’s main entrance be to a bus stop to meet LTc3 Access to Transit, Path 1 requirements?

0.25 miles (400 m)

16
New cards

What site and/or project characteristics would contribute to maximizing open space?

Creating a narrow 10 story building instead of a wider 5 story building

17
New cards

What does the use of light colored pervious paving help with?

Heat Island Effect

18
New cards

What are heat islands?

Air and surface temperature differences between developed and undeveloped areas

19
New cards

What is the benefit of increasing the quality of open space?

Increasing stormwater infiltration

20
New cards

Placing a project’s parking underground would help with?

Heat Island Effect

21
New cards

Which of the following is required for WEp1: Water Metering and Reporting?

Share water data with USGBC annually for 5 years

22
New cards

Which strategies are associated with Xeriscaping?

Native or adaptive plants

23
New cards

What are attributes of native plants?

Require less pesticides

24
New cards

Which of the following does not help achieve a water efficient landscape?

Green roof

25
New cards

How frequently must submeter data be recorded under WEc Option 1?

Hourly