Feedback and control system handout 1

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/15

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 9:09 PM on 9/7/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

16 Terms

1
New cards

actuator

the device that can influence the controlled variable of the process. It moves the process from the current state to the desired state. 

2
New cards

process

the house whose output is the room temperature. It is the process you want to control. It is the variable that needs to be driven to the desired state. 

3
New cards

disturbance

represents unwanted inputs which affect the control-system’s output, and result in an increase of the system error. 

4
New cards
5
New cards

plant 

combination of process and actuator

6
New cards

controller

The component that actually computes the desired control signal

7
New cards

input filter

whose role is to convert the reference signal to an electrical form for later manipulation by the controller. 

8
New cards

sensor

The component labeled thermostat

9
New cards
10
New cards

open-loop system

provides initial instructions to equipment but provides no means of gathering data and comparing assumptions underlying those instructions to the reality of what the equipment actually produces. 

11
New cards

closed system

In this setup, the controller receives the output and compares it to the desired input.

12
New cards

Modeling 

It is the method of transforming the physical system into its equivalent mathematical equation counterpart.

13
New cards
14
New cards

Model Verification 

the mathematical equations are tested whether they conform to the actual response of the system.

15
New cards

Control Architecture 

This stage is the development of the controller/compensator.

16
New cards

Control Verification 

Once the design is done, a control engineer must verify his/her work either through simulation or prototyping.