1
New cards

In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate? Please choose the correct answer.
-The priority of the proposed solution
-The presence of firmed planned orders
-The viability of the proposed solutions
-The presence of production orders

-The viability of the proposed solutions

2
New cards

In Demand-Driven Replenishment, materials are classified according to several criteria. What criteria can you use? There are 3 correct answers to this question.
-Average daily usage
-Minimum order quantity
-Demand variation
-Usage in bill of materials
-Goods issue value

-Demand variation
-Usage in bill of materials
-Goods issue value

3
New cards

Which material master data can you copy when you use the Copy Material program(transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.
-Production version data
-Warehouse number data
-Storage location data
-MRP area data

-Warehouse number data
-Storage location data

4
New cards

What must be used in the system to plan the requirements for different subcontractors separately?
-Planning plant
-Production versions
-MRP areas
-Storage locations

-MRP areas

5
New cards

An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version? Please choose the correct answer.
-MRP Controller
-MRP Profile
-Plant Data
-MRP Group

-MRP Group

6
New cards

What is a typical transportation processing SAP Transportation Management? Please choose the correct answer.
-Transportation Planning, Order Management, Transportation Execution, Freight Costing, and Settlement, Analytics and Report
-Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting
-Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting
-Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting

-Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting

7
New cards

The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer.
-Contract
-Selection Method
-Purchasing Info Record
-Production Version

-Production Version

8
New cards

Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question.
-Transfer from batch to batch
-Purchase orders
-Stock transfers
-Planned orders
-Collective orders

-Transfer from batch to batch
-Purchase orders
-Stock transfers

9
New cards

Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question.
-Setup time
-Goods receipt processing time
-Float before and float after production
-Opening period

-Setup time
-Float before and float after production

10
New cards

Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question.
-Slotting
-Labor Management
-Expected goods receipt
-Yard Management
-Handling Unit Management

-Slotting
-Labor Management
-Expected goods receipt

11
New cards

Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question.
-Scope items
-Solution packages
-Configuration guides
-Process diagrams
-Building blocks

-Scope items
-Solution packages
-Building blocks

12
New cards

Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.
-A user can schedule a background job to release production orders (transaction COOIS)
-A user can trigger material staging via mass processing (transaction COHV).
-A user trigger material availability check via mass processing (transaction COHV)
-A user trigger printing of shop floor paper manually (transaction CO02).

-A user can trigger material staging via mass processing (transaction COHV).

13
New cards

When can the material availability check occur automatically in a production order? There are 2 correct answers to this question.
-At order settlement
-At order release
-At order confirmation
-At order creation

-At order release
-At order creation

14
New cards

Which methods can you use achieve a feasible production planning case of capacity constraints? There are 3 correct answers to this question.
-Select an alternative mode on a resource.
-Adjust the available capacity.
-Execute a new productionplanning run.
-Form optimal sequences to reduce setup times.
-Reduce the planning window.

-Select an alternative mode on a resource.
-Adjust the available capacity.
-Form optimal sequences toreduce setup times.

15
New cards

Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question.
-Capacity planning
-Demand planning
-Supply Network Planning
-Available-to-promise
-Backorder processing

-Capacity planning
-Available-to-promise
-Backorder processing

16
New cards

Which materials have a negative quantity in a bill of materials or in a recipe? There are 3 correct answers to this question.
-Bulk materials
-By-products
-Co-products
-Waste products
-Continuous flow materials

-By-products
-Co-products
-Waste products

17
New cards

You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.
-/SAPAPO/UPD_LOC_SP_PL
-/SAPAPO/PPDS_DELTA_ORD_TRANS
-/SAPAPO/CREATE_LOCATION
-/SAPAPO/CURTO_CREATE

-/SAPAPO/PPDS_DELTA_ORD_TRANS

18
New cards

Which of the following time elements does MRP use during backward scheduling for in-house production? There are 2 correct answers to this question.
-Planning time fence
-Opening period
-Goods receipt processing time
-Planned delivery time

-Opening period
-Goods receipt processing time

19
New cards

In which data objects do you maintain the production in as the work center for repetitive manufacturing? There are 2 correct answers to this question.
-Production version
-Repetitive manufacturing profile
-Routing
-Production cost collector

-Production cost collector
-Routing

20
New cards

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.
-Manually firm all planned orders for materials within the replenishment lead time of the material
-In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
-In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
-In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

-Manually firm all planned orders for materials within the replenishment lead time of the material
-In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

21
New cards

For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question.
-Production plant
-Contract
-Work center
-Material master

-Production plant
-Contract

22
New cards

Which of the following apply to MRP Live? There are 2 correct answers to this question.
-The sequence of planning materials is calculated across plants
-The definition of planning scope is more flexible
-The BAdIs for classical MRP also apply to MRP Live.
-Planned orders need to be converted to purchase requisitions for externally procured materials

-The sequence of planning materials is calculated across plants
-The definition of planning scope is more flexible

23
New cards

How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 2 correct answers to this question.
-By eliminating hybrid tables
-By eliminating inventory tables
-By eliminating material master tables
-By eliminating inventory history tables

-By eliminating inventory tables
-By eliminating inventory history tables

24
New cards

Which transaction code can you use in SAP S/4HANA to enter and display goods movements?
-MBNL
-MIGO
-MMBE
-MB02

-MIGO

25
New cards

What are the key aspects of SAP S/4HANA? There are 2 correct answers to this question
-SAP S/4HANA is built on SAP HANA
-SAP S/4HANA increases the data footprint.
-SAP S/4HANA can be deployed on premise, in the cloud, or combination of both
-SAP S/4HANA has minor changes on data model.

-SAP S/4HANA is built on SAP HANA
-SAP S/4HANA can be deployed on premise, in the cloud, or combination of both

26
New cards

You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Please choose the correct answer.
-50 Planning without final assembly
-40 Planning with final assembly
-30 Production by lot size
-20 Make to order production

-50 Planning without final assembly

27
New cards

You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal? Please choose the correct answer.
-Top of Green
-Top of Red
-Top of Yellow
-Top of Red Base

-Top of Green

28
New cards

What are uses of the low- level code assigned to each material? There are 2 correct answers to this question.
-It is used by product costing to determine how costs are rolled up
-It is used in MRP to determine the sequence in which materials are planned.
-It is used by engineering to identify sub items in engineering bill of materials (BOMs).
-It is used by ATP to determine the priority of alternative components.

-It is used by product costing to determine how costs are rolled up
-It is used in MRP to determine the sequence in which materials are planned.

29
New cards

What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
-APO Demand Planning
-Flexible Planning
-PP Standard Sales and Operations Planning
-Integrated Business Planning

-Integrated Business Planning

30
New cards

Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? There are 2 correct answers to this question.
-Work center
-Plant
-Material
-Production version

-Work center
-Material

31
New cards

How Is the bill of material (BOM) exploded when you use a BOM explosion number?
- With respect to defined separate key dates for product and each assembly
- With respect to a common change status for product and each assembly
- With respect to a defined separate change status for product and each assembly
- With respect to a common key date for product and each assembly

With respect to defined separate key dates for product and each assembly

32
New cards

Your customer complains about incorrect duration for production order operations. What time elements could cause the issue? There are 3 correct answers to this question.
-Floating time
-Tear down time
-Queue time
-Move time
-Processing time

-Tear down time
-Queue time
-Processing time

33
New cards

What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.
-Monitor Production OrdersFiori app
-Material Coverage Fiori app
-Rough-cut capacity planning
-Flow manufacturing
-Lock-free inventorymovements

-Monitor Production OrdersFiori app
-Material Coverage Fiori app
-Lock-free inventorymovements

34
New cards

What is the valid sequence of key activities in production order processing? Please choose the correct answer.
-Creation, scheduling, release,variance calculation,confirmation
-Creation, release, scheduling,material withdrawal,confirmation
-Creation, staging, release,material withdrawal,confirmation
-Creation, scheduling, release,material withdrawal,confirmation

-Creation, scheduling, release,material withdrawal,confirmation

35
New cards

Which capabilities does the Alert monitor have? There are 3 correct answers to this question.
-Automatically send alerts withAlert Notification Engine
-Nominate time-dependentsubstitutes for a planner
-Generate alerts based ondefined threshold values
-Automatically reschedule incase of overload alerts
-Automatically predict alerts infuture planning cycles

-Automatically send alerts withAlert Notification Engine
-Nominate time-dependentsubstitutes for a planner
-Generate alerts based ondefined threshold values

36
New cards

Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question.
-Packaging Logistics
-Parts interchangeability
-Equipment and ToolsManagement
-Enhanced KanbanProcessing
-Enhanced characteristics basedprocesses

-Packaging Logistics
-Parts interchangeability
-Enhanced KanbanProcessing

37
New cards

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
-Work center hierarchy
-Operation network
-Resource network
-Setup matrix

-Resource network

38
New cards

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
-Infinite resource and finitestrategy
-Finite resource and infinitestrategy
-Infinite resource and infinitestrateg
-Finite resource and finitestrategy

-Finite resource and finitestrategy

39
New cards

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? There are 2 correct answers to this question.
-Set the creation indicator fordelivery schedule lines on theinitial screen of the MRP run.
-Set the creation indicator forpurchase requisitions on theinitial screen of the MRP run.
-Add the agreement to thesource list and mark it for MRPrelevance
-Add the agreement to the quotaarrangement and mark it forMRP relevance.

-Set the creation indicator fordelivery schedule lines on theinitial screen of the MRP run.
-Add the agreement to thesource list and mark it for MRPrelevance.

40
New cards

The pegging situation was changed because of an MRP heuristic run. What is acapability of dynamic pegging?
-It propagates changed salesorder priorities to the peggedplanned orders
-It enables the propagation ofnetwork alerts across the bill ofmaterials structure
-It replaces fixed peggingrelationships unless they havebeen created for stock
-It links receipts from analternative location in case of ashortage in the default location

-It links receipts from analternative location in case of ashortage in the default location

41
New cards

In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings? Please choose the correct answer.
-Picking list
-Transfer order
-Kanban
-Backflushing

-Backflushing

42
New cards

You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
-Scheduling working time only
-Insert operation
-Find slot
-Squeezing

-Find slot

43
New cards

The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out? There are 2 correct answers to this question.
-Cost-related
-Product-related
-Milestone-related
-Order-related

-Product-related
-Order-related

44
New cards

For a production version to be valid and consistent what requirements must be fulfilled? There are 3 correct answers to this question.
-The assigned routing must be arate routing.
-The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
-The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
-The assigned routing must NOT have alternative sequences.
-The lot size range must be within the lot-size range of the assigned routing.

-The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
-The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
-The lot size range must be within the lot-size range of the assigned routing.

45
New cards

What are some of the advantages of using Kanban? There are 2 correct answers to this question.
-Replenishments are based oncentralized planning
-Replenishments are created close to the actual need
-It is mostly accomplished bymanual postings
-It is a simplified form of production control

-Replenishments are created close to the actual need
-It is a simplified form of production control

46
New cards

Your client is asking for your advice on material master numbering in S/4HANA. What do you need to consider? There are 2 correct answers to this question.
-The display template formaterial numbers applies to allclients.
-The number of leading zeros forinternal numbers is client-specific.
-In Customizing you can decideby material type whether to usethe long material numbers.
-The maximum mater all number length is 40 for external numbers and 18 for internal numbers.

-The display template formaterial numbers applies to allclients.
-The maximum mater all number length is 40 for external numbers and 18 for internal numbers.

47
New cards

Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? There are 3 correct answers to this question
-Sales order-specific planningrun is required.
-Production orders are createdwith sales order reference.
-Net requirements calculationis sales order-specific.
-Storage location MRP areas arerequired.
-Sales order-specific stock iscreated.

-Production orders are createdwith sales order reference.
-Net requirements calculationis sales order-specific.
-Sales order-specific stock iscreated.

48
New cards

Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question.
-Enter time-ticket confirmation forproduction orders
-Change planned orderquantities
-Undo for drag & Drop planningactivities
-Change sales order quantities

-Change planned orderquantities
-Undo for drag & Drop planningactivities

49
New cards

What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.
-Batch process are required tokeep OLTP and OLAP in sync
-Multiple copies of the dataexist
-Only the OLAP system has apredefined subset of the data
-The OLAP system needs to write back the data to the OLTP system
-Only the OLAP system has thelatest data

-Batch process are required tokeep OLTP and OLAP in sync
-Multiple copies of the dataexist
-Only the OLAP system has apredefined subset of the data
-The OLAP system needs to write back the data to the OLTP system

50
New cards

In which material master views can you select the batch management checkbox? There are 2 correct answers to this question.
-Work Scheduling
-Purchasing
-Basic Data 1
-MRP 4

-Work Scheduling
-Purchasing

51
New cards

Where does the system check master data selection settings during the creation of planned orders and production orders? There are 3 correct answers to this question.
-In the bill of materials (BOM)
-In the routing
-In the MRP controller
-In the production version
-In the production order type

-In the bill of materials (BOM)
-In the routing
-In the production version

52
New cards

Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? 2 correct answers
-Run PP/DS heuristics forrepetitive manufacturing.
-Run MRP with quotaarrangement.
-Run MRP with automaticselection of production version.
-Assign planned ordersmanual lying the planning table.

-Run PP/DS heuristics forrepetitive manufacturing.
-Assign planned ordersmanual lying the planning table.

53
New cards

What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.
-Default values for the itemstatus
-Allowed material type
-Default unit of measure
-Default unit of measure

-Default values for the itemstatus
-Allowed material type

54
New cards

Which characteristics should a material have for re-order point planning? There are 2 correct answers to this question
-Demand remains relativelyconstant.
-Replenishment lead time isknown and relatively constant.
-Material replenishment ismanaged by the vendor (VMI).
-Seasonal demand is relativelyvolatile.

-Demand remains relativelyconstant.
-Replenishment lead time isknown and relatively constant.

55
New cards

What data processing steps are obsolete if you use SAP S/4HANAAnalytics? There are 2 correct answers to this question.
-Pre computed aggregationviews
-Online transaction processing (OLTP)
-Extract on, transformation, andloading (ETL)
-Online analytical processing (OLAP)

-Pre computed aggregationviews
-Extract on, transformation, andloading (ETL)

56
New cards

Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question
-Individual process instructions
-Individual control recipes
-Individual operations
-Individual phases

-Individual operations
-Individual phases

57
New cards

Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer.
-Outbound delivery order
-Warehouse order
-Warehouse task
-Outbound delivery request

-Outbound delivery request

58
New cards

You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question
-Material master
-Work center
-Bill of material
-Routing header

-Material master
-Bill of material

59
New cards

During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question.
-Use a bucket-oriented capacity check
-Use optimization with respect to set-up times
-Use rescheduling with an alternative mode
-Use multilevel MRP run for the products on the resource
-Use DS heuristic "Schedule Sequence"

-Use optimization with respect to set-up times
-Use rescheduling with an alternative mode
-Use DS heuristic "Schedule Sequence"

60
New cards

Which Kanban master data object controls the relationship between the supply and demand source? Please choose the correct answer.
-Rate routing
-Kanban container
-Production supply area
-Control cycle

-Control cycle

61
New cards

Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use? Please choose the correct answer.
-Planning without final assembly (50)
-Make-to-stock production (10)
-Planning with final assembly (40)
-Make-to-order production (20)

-Planning with final assembly (40)

62
New cards

Which of the following business processes are controlled by production order type dependent parameters? There are 2 correct answers to this question.
-Engineering change management
-Planning
-Inspection during production
-Implementation

-Planning
-Implementation

63
New cards

Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question.
-The checking rule from the business application
-The checking control for the order type
-The checking group from the material master
-The ATP category for restricted-use stock

-The checking rule from the business application
-The checking group from the material master

64
New cards

You want to perform capacity availability checks on your production orders. What must be set for this to occur? There are 2 correct answers to this question.
-PRT Availability check must be set.
-Checking control must have an overall profile assigned in customizing.
-Indicator Relevant for finite scheduling must be set
-Checking rule and group must be assigned.

-Checking control must have an overall profile assigned in customizing.
-Indicator Relevant for finite scheduling must be set

65
New cards

A customer is considering switching from order-related settlement to product related settlement. What are the capabilities of cost collectors? There are 2 correct answers to this question.
-They can be used for manufacturing with collective orders.
-They can be applied to make-to-stock production order
-They can be used for repetitive manufacturing
-They can be created automatically during month end process.

-They can be applied to make-to-stock production order
-They can be used for repetitive manufacturing

66
New cards

What are the prerequisites for batch derivation? There are 2 correct answers to this question.
-Batch where-used list
-Process instructions
-Batch determination selection conditions
-Receiver-sender relationships

-Batch where-used list
-Receiver-sender relationships

67
New cards

How can SAP S/4HANA support a GMP compliant production process? There are 2 correct answers to this question.
-Use of the digital signature function to check and run business processes
-Predefined GMP compliant process order types to meet audit requirements
-Use of the GMP compliant flag in relevant master data applications
-Documentation of quality data with Quality Management
-Recipe approval with Engineering Change Management

-Use of the digital signature function to check and run business processes
-Documentation of quality data with Quality Management
-Recipe approval with Engineering Change Management

68
New cards

On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question.
-Production order type
-MRP controller
-Production controller
-Material master

-Production order type
-Material master

69
New cards

In your plant, MRP is activated. Which options do you have to exclude material from the MRP run? There are 2 correct answers to this question.
-Use a specific material group
-Use a specific MRP type.
-use a specific MRP controller
-use a specific material status

-use a specific MRP controller
-use a specific material status

70
New cards

What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question.
-Backorder processing
-Detailed scheduling functions
-Demand consumption
-Heuristics
-Optimization

-Detailed scheduling functions
-Heuristics
-Optimization

71
New cards

Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.
-Elimination of output condition tables
-Elimination of status tables
-Elimination of LIS tables for rebates
-Elimination of customer master tables
-Elimination of document index tables

-Elimination of status tables
-Elimination of customer master tables
-Elimination of document index tables

72
New cards

In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
-Production Version
-Repetitive manufacturing profile
-Bill of material
-Cost collector
-Production version

-Production version

73
New cards

Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.
-MRP Live can priorities demand from sales orders
-MRP live can create production orders automatically
-MRP live can propose alternative solutions
-MRP Live can priorities demand from sales orders

-MRP live can create production orders automatically
-MRP live can propose alternative solutions

74
New cards

What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question.
-System activation
-System upgrade
-New implementation
-System conversion
-Landscape transformation

-New implementation
-System conversion
-Landscape transformation

75
New cards

The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
-Material Master > MRP group > Plant Settings
-Plant Settings -> MRP Group -> Material Master
-MRP Group -> Material Master -> Plant Settings
-Material Master -> Plant Settings -> MRP Group

-Material Master > MRP group > Plant Settings

76
New cards

What is the difference between co-products and by-products?
-Only co-products are identified by a special item category in the bill of material (BOM).
-Only by-products have a zero inventory valuation.
-Only co-products can be manufactured in isolation from the main product.
-Only co-products appear in the process or production order settlement rule

-Only co-products appear in the process or production order settlement rule

77
New cards

Which of the following are capabilities of multidimensional reporting in SAPS/4HANA embedded analytics? There are 3 correct answers to this question.
-Forecast
-Drilldown
-Filters
-Sort
-Scheduling

-Drilldown
-Filters
-Sort

78
New cards

Which transaction code can you use in SAP S/4HANA to enter and display goods movements? There are 3 correct answers to this question.
-Relevant simplification items
-Recommended SAP Fiori apps
-Inconsistent data tables
-Custom code analysis
-Recommended SAP Best Practices

-Relevant simplification items
-Inconsistent data tables
-Custom code analysis

79
New cards

Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question.
-Capability to add to server landscape and scale
-Wide adoption of web services such as Service oriented architecture
-Advances in the three-tier architecture approach
-Multi-core processors enabling parallelism of tasks
-Big and affordable memory

-Capability to add to server landscape and scale
-Wide adoption of web services such as Service oriented architecture
-Multi-core processors enabling parallelism of tasks

80
New cards

What are the main processes of the embedded PP/OS in SAP S/4HANA? There are 2 correct answers to this question.
-Calculation of inventory buffer size
-Source determination of external procurement
-Optimization of production plan
-Long-term production planning

-Source determination of external procurement
-Optimization of production plan

81
New cards

What is the correct sequence of the following Activate methodology phases?
-Prepare, Validate, Test, Go-Live
-Prepare, Explore, Realize, Deploy
-Validate, Realize, Test , Deploy
-Prepare, Realize, Iterate, Continuous Improvement

-Prepare, Explore, Realize, Deploy

82
New cards

In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question
-Material master of the finished product
-BOM
-Work Center
-Routing, in the component allocation

-BOM
-Work Center

83
New cards

What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question
-Bill of Material
-Routing
-Production Version
Engineering Change Record

-Bill of Material
-Routing
-Production Version

84
New cards

Production orders are used for what production type?
-Period and quantity-oriented production
-Replenishment controlled by control cycles
-Discrete Manufacturing Processing
-Process manufacturing processes

-Discrete Manufacturing Processing

85
New cards

To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
-Create parts
-Kanban
-Release order parts
-Pick parts

-Pick parts

86
New cards

At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
-The requirements date occurs that of a firmed planned receipt
-The requirement no longer exists
-A firmed planned receipt cannot be rescheduled
-The requirement no longer exists

-The requirements date occurs before that of a firmed planned receipt

87
New cards

What are pillars of SAP Activate? There are 2 correct answers to this question
-SAP Best Practices
-Guided Configuration
-Premium engagement
-SAP MaxAttention

-Guided Configuration
-SAP Best Practices

88
New cards

Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question
-SAP S/4HANA on premise
-SAP S/4HANA on cloud
-SAP S/4HANA Professional services cloud
-SAP S/4AHANA Enterprise Management cloud

-SAP S/4HANA on premise
-SAP S/4HANA on cloud

89
New cards

What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question
-It was created for better planning and estimation on your way to S/4HANA
-It can have a business and technical impact
-It details transactions and solution capabilities at a functional level

-It was created for better planning and estimation on your way to S/4HANA
-It can have a business and technical impact
-It details transactions and solution capabilities at a functional level

90
New cards

Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question.
-SAP GTS replaces ERP SD Foreign Trade
-SAP order Fulfillment replaces ERP SD Availability Checking
-SAP Sales Support replaces SAP CRM
-SAP Revenue Accounting replaces ERP SD Revenue Recognition
-Settlement Management replaces ERP SD Rebates

-SAP GTS replaces ERP SD Foreign Trade
-SAP Revenue Accounting replaces ERP SD Revenue Recognition
-Settlement Management replaces ERP SD Rebates

91
New cards

For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question.
-Material
-Production version
-Plant
-Work center

-Material
-Work center

92
New cards

When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question.
-You require an up-to-date inventory for components
-When you need to determine the work in progress
-For production lines with short lead times
-When goods issues can wait for final confirmation

-You require an up-to-date inventory for components
-When you need to determine the work in progress

93
New cards

Which material master setting is required to use the repetitive planning table for production with production orders?
- A repetitive manufacturing profile must be assigned on the MRP4 view
- At least one valid production version must exist on the MRP4 view
- An overall profile be assigned on the Work Scheduling view
- The Selection Method must be set to "2 Selection by production version".

A repetitive manufacturing profile must be assigned on the MRP4 view

94
New cards

A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent? Please choose the correct answer.
-Available capacity version
-Capacity category
-Number of individual capacities
-Work center category

-Capacity category

95
New cards

The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question.
-Stock transfer
-In-house production
-Subcontracting
-Vendor consignment

-Stock transfer
-In-house production

96
New cards

You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Please choose the correct answer.
-Quota arrangement
-Vendor rating
-Delivery date
-Component availability
-Costs

-Quota arrangement

97
New cards

In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer.
-2) Process order, 3) Control recipe, 4) PI sheet, 5) Process message
-2) Control recipe, 3) Process order, 4) Process message, 5) PI sheet
-2) Control recipe, 3) Process order, 4) PI sheet, 5) Process Message
-2) Process order, 3) Control recipe, 4) Process message, 5) PI sheet

-2) Process order, 3) Control recipe, 4) PI sheet, 5) Process message

98
New cards

What is the purpose of a reporting point confirmation in repetitive manufacturing? There are 2 correct answers to this question.
- To stage different components for a production line simultaneously
- To determine the work in progress along the production line
- To provide timely updates of inventory management for the staged components
- To reduce the total production lead time for along production line

-To determine the work in progress along the production line
-To provide timely updates of inventory management for the staged components

99
New cards

What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.
- Comparison of current data with historical data to identify trends
- Real time decision support
- Automatic updates of story boards
- Strategic Analysis

-Real time decision support
-Strategic Analysis

100
New cards

Your quality department detects a deviation in a raw material batch. Unfortunately ,this batch has already been used in production. How can you identify all affected finished goods stocks? Please choose the correct answer.
-Use the material staging report.
-Use batch determination.
-Use the material where-used report.
-Use the batch information cockpit.

-Use the batch information cockpit.