BSD

0.0(0)
studied byStudied by 1 person
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/57

flashcard set

Earn XP

Description and Tags

Types of Plans | ALL ABT PRE-CONSTRUCTION: Permits and Requirements | Parts of Plans

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

58 Terms

1
New cards

NATIONAL BUILDING CODE OF THE PHILIPPINES (PD 1096)

The purpose of this Code is to provide for all buildings and structures, a framework of minimum standards and requirements to regulate and control their location, site, design, quality of materials, construction, use, occupancy, and maintenance.

2
New cards

Building Permit Form containing.…

  • Description of the proposed work

  • Use and occupancy of the proposed work — affects taxes

  • FOR LOT OWNER APPLICANTS

    • A certified true copy of Transfer Certificate of Title (TCT)

  • FOR LESSEE APPLICANTS

    • Copy of Contract Lease Estimated Cost of the proposed work.

What documents are needed to be submitted in order to obtain a Building Permit?

3
New cards

5 sets

In submitting documents to obtain a building permit, how many sets of plans and specifications are prepared, signed, and sealed by registered and licensed professionals?

4
New cards

Office of the Building Official (OBO)

THE PROCESSING OF BUILDING PERMITS IS UNDER THE ADMINISTRATIVE CONTROL AND SUPERVISION OF?

5
New cards

15 days

THE BUILDING OFFICIAL'S OFFICE SHALL ISSUE THE BUILDING PERMIT WITHIN DAYS AFTER THE PAYMENT OF THE PRESCRIBED FEES.

6
New cards

1 YEAR AFTER THE DATE OF ISSUE OF THE CONSTRUCTION IS NOT COMMENCED

120 DAYS AFTER OR ABANDONMENT OF WORK

When will Building Permit expire?

7
New cards

Certificate of Occupancy

  • Issued by OBO to indicate that the building is suitable for use and occupancy.

  • Needed to use or occupy a building.

8
New cards

30 days

THE CERTIFICATE OF OCCUPANCY SHALL BE ISSUED WITHIN _____ AFTER THE FINAL INSPECTION AND SUBMISSION OF THE CERTIFICATE OF COMPLETION.

9
New cards

Structural Computation

Document needed for projects above 1 storey floors

10
New cards

Occupancy

The use of a building or structure.

11
New cards

10

Number of classifications of occupancie. (Group A to J)

12
New cards

Rent

  • Contracts usually lasts 1 year.

  • Fee may increase over time or when the renter

13
New cards

Lease

  • Contracts lasts a minimum of 5 years

  • Consistent fee for the duration of the contract

14
New cards

Bill of materials (BOM)

  • Price estimation of how much a structure is.

  • Signed & sealed of a professional, and Notarized.

  • Usually not truthful, less than the expected cost — affects tax accounted for in the BOM

15
New cards
  • Bill of materials (3 copies)

  • Technical Specifications (3 copies)

  • Structural Computation (1 copy)

  • Electrical Design Analysis (1 copy)

  • Boring Test (1 copy)

  • Structural Stability Certification (if applicable) (1 copy)

  • Hydraulic Calculation (if applicable) (1 copy)

Supporting documents

16
New cards

3 storeys and above

When is a boring test needed?

17
New cards
  • Building Permit

  • Sanitary Permit

  • Electrical Permit

  • Mechanical Permit

  • Demolition Permit

  • Electronics Permit

Different Types of Permits

18
New cards

Approval of the building official

What are needed to change a building’s occupancy?

19
New cards

Professional Tax Receipt (PTR)

proof that you paid your taxes to the government

20
New cards

Zone

Term used for the use of lands and lots.

21
New cards

Firewalls

  • Exterior fire-resistant walls that prevent fire from spreading between buildings and structures. It allows a building to extend into the setbacks.

22
New cards

Firewalls

  • Restrictions and limitations of ___ are based on the land’s zoning classification.

  • All existing ___ openings must be sealed.

  • Should extend for 600m.

23
New cards

Continuing Professional Development Points

  • CPD Points

  • Nakukuha by attending seminars and is needed requirement for your renewal of license to be approved; 15 points needed.

24
New cards

Total Gross Floor Area (TGFA)

  • The total floor area inside the building, enclosed by the building’s walls.

  • Used to determine the maximum allowable TGFA of the site.

  • Computation located at Table 7.1, page 84

25
New cards

2.5m x 5m

Parking Sizes and Requirements of a Car (perpendicular parking)

26
New cards

2.15m x 6m

Parking Sizes and Requirements of a Car (parallel parking)

27
New cards

3m x 9m

Parking Sizes and Requirements of a Jeepney

28
New cards

3.6m x 12m

Parking Sizes and Requirements of a Standard truck/bus

29
New cards

3.6m x 18m

Parking Sizes and Requirements of a articulated truck

30
New cards

Parking Requirements

  • THE SLOTS AND LOADING SPACES OF A STRUCTURE OR BUILDING.

  • BASED ON THE BUILDING’S TYPE OF OCCUPANCY AND LOT SIZE.

31
New cards

GA

Group A: Parking Requirements

Temp Ans: GA

<p>Group A: Parking Requirements<br><br><em>Temp Ans: GA</em></p>
32
New cards

Dwellings

Shall be at least 2.00 meters from the property line.

33
New cards

90%

Dwelings shall not occupy ___ of the total lot area of a Corner Lot Dwellings

34
New cards

80%

Dwellings shall not occupy ___ of the total lot area of an Inside Lot

35
New cards

2.70m, 2.40m , 2.10m

Minimum ceiling height of an artificially ventilated structure. (From ground floor to proceeding floors)

36
New cards

2.70m

Minimum ceiling height of a naturally ventilated structure. (From ground floor to proceeding floors)

37
New cards

2m or 6sqm

Min. Room Sizes for a Habitable Room

38
New cards

1.5m or 3sqm

Min. Room Sizes for a kitchen

39
New cards

0.9m or 1.2sqm

Min. Room Sizes for a toilet

40
New cards

14 cu.m

Min. Air Space per person in a Habitable Room

41
New cards
  • 10% of floor area or > 1sqm

  • 5% of floor area or > 240mm x 240mm (size ng exhaust fan)

Min. Area of windows

42
New cards

Philippine Electrical Code

PEC; used for electrical requirements

43
New cards

Philippine Mechanical Engineering Code

PMEC; used for mechanical requirements

44
New cards
  • Residential

  • Commercial

  • Mixed-use

Types of Plans

45
New cards
  1. Lot Plans

  2. Architectural Plans

  3. Structural Plans

  4. Plumbing/Sanitary Plans

  5. Electrical Plans

  6. Mechanical Plans

  7. Fire Protection Plans

  8. Electronic Plans

  9. Interior Design

STEPS WHEN NAGPAPAGAWA NG HOUSE

46
New cards

Mechanical, Electrical, Plumbing, and Firefighting System

MEPFS

47
New cards

Building Utilities

BU

48
New cards

Natural Ground Level/ Natural Grid Line

  • NGL

  • Ground Zero (0), 00.00mm

49
New cards
  • Float Glass

  • Tempered Glass

  • Heat-soaked Glass

  • Laminated Glass

  • Double Glazing

Types of Glass

50
New cards

Finished Floor Line

FFL

51
New cards

Transfer Certificate of Title

TCT

52
New cards

Road Right of Way

RROW

53
New cards

Park Structures, Recreation, & Entertainment

PRE

54
New cards

Utilities, Transportation, & Services

UTS

55
New cards

Planned Unit Development

PUD

56
New cards

General Institutional

GI

57
New cards

Certificate of Completion

CoC

58
New cards

Copy of Contract Lease

CoCL