NATIONAL BUILDING CODE OF THE PHILIPPINES (PD 1096)

1 / 57

flashcard set

Earn XP

Description and Tags

Types of Plans | ALL ABT PRE-CONSTRUCTION: Permits and Requirements | Parts of Plans

58 Terms

1

NATIONAL BUILDING CODE OF THE PHILIPPINES (PD 1096)

The purpose of this Code is to provide for all buildings and structures, a framework of minimum standards and requirements to regulate and control their location, site, design, quality of materials, construction, use, occupancy, and maintenance.

New cards
2

Building Permit Form containing.…

  • Description of the proposed work

  • Use and occupancy of the proposed work — affects taxes

  • FOR LOT OWNER APPLICANTS

    • A certified true copy of Transfer Certificate of Title (TCT)

  • FOR LESSEE APPLICANTS

    • Copy of Contract Lease Estimated Cost of the proposed work.

What documents are needed to be submitted in order to obtain a Building Permit?

New cards
3

5 sets

In submitting documents to obtain a building permit, how many sets of plans and specifications are prepared, signed, and sealed by registered and licensed professionals?

New cards
4

Office of the Building Official (OBO)

THE PROCESSING OF BUILDING PERMITS IS UNDER THE ADMINISTRATIVE CONTROL AND SUPERVISION OF?

New cards
5

15 days

THE BUILDING OFFICIAL'S OFFICE SHALL ISSUE THE BUILDING PERMIT WITHIN DAYS AFTER THE PAYMENT OF THE PRESCRIBED FEES.

New cards
6

1 YEAR AFTER THE DATE OF ISSUE OF THE CONSTRUCTION IS NOT COMMENCED

120 DAYS AFTER OR ABANDONMENT OF WORK

When will Building Permit expire?

New cards
7

Certificate of Occupancy

  • Issued by OBO to indicate that the building is suitable for use and occupancy.

  • Needed to use or occupy a building.

New cards
8

30 days

THE CERTIFICATE OF OCCUPANCY SHALL BE ISSUED WITHIN _____ AFTER THE FINAL INSPECTION AND SUBMISSION OF THE CERTIFICATE OF COMPLETION.

New cards
9

Structural Computation

Document needed for projects above 1 storey floors

New cards
10

Occupancy

The use of a building or structure.

New cards
11

10

Number of classifications of occupancie. (Group A to J)

New cards
12

Rent

  • Contracts usually lasts 1 year.

  • Fee may increase over time or when the renter

New cards
13

Lease

  • Contracts lasts a minimum of 5 years

  • Consistent fee for the duration of the contract

New cards
14

Bill of materials (BOM)

  • Price estimation of how much a structure is.

  • Signed & sealed of a professional, and Notarized.

  • Usually not truthful, less than the expected cost — affects tax accounted for in the BOM

New cards
15
  • Bill of materials (3 copies)

  • Technical Specifications (3 copies)

  • Structural Computation (1 copy)

  • Electrical Design Analysis (1 copy)

  • Boring Test (1 copy)

  • Structural Stability Certification (if applicable) (1 copy)

  • Hydraulic Calculation (if applicable) (1 copy)

Supporting documents

New cards
16

3 storeys and above

When is a boring test needed?

New cards
17
  • Building Permit

  • Sanitary Permit

  • Electrical Permit

  • Mechanical Permit

  • Demolition Permit

  • Electronics Permit

Different Types of Permits

New cards
18

Approval of the building official

What are needed to change a building’s occupancy?

New cards
19

Professional Tax Receipt (PTR)

proof that you paid your taxes to the government

New cards
20

Zone

Term used for the use of lands and lots.

New cards
21

Firewalls

  • Exterior fire-resistant walls that prevent fire from spreading between buildings and structures. It allows a building to extend into the setbacks.

New cards
22

Firewalls

  • Restrictions and limitations of ___ are based on the land’s zoning classification.

  • All existing ___ openings must be sealed.

  • Should extend for 600m.

New cards
23

Continuing Professional Development Points

  • CPD Points

  • Nakukuha by attending seminars and is needed requirement for your renewal of license to be approved; 15 points needed.

New cards
24

Total Gross Floor Area (TGFA)

  • The total floor area inside the building, enclosed by the building’s walls.

  • Used to determine the maximum allowable TGFA of the site.

  • Computation located at Table 7.1, page 84

New cards
25

2.5m x 5m

Parking Sizes and Requirements of a Car (perpendicular parking)

New cards
26

2.15m x 6m

Parking Sizes and Requirements of a Car (parallel parking)

New cards
27

3m x 9m

Parking Sizes and Requirements of a Jeepney

New cards
28

3.6m x 12m

Parking Sizes and Requirements of a Standard truck/bus

New cards
29

3.6m x 18m

Parking Sizes and Requirements of a articulated truck

New cards
30

Parking Requirements

  • THE SLOTS AND LOADING SPACES OF A STRUCTURE OR BUILDING.

  • BASED ON THE BUILDING’S TYPE OF OCCUPANCY AND LOT SIZE.

New cards
31

GA

Group A: Parking Requirements

Temp Ans: GA

<p>Group A: Parking Requirements<br><br><em>Temp Ans: GA</em></p>
New cards
32

Dwellings

Shall be at least 2.00 meters from the property line.

New cards
33

90%

Dwelings shall not occupy ___ of the total lot area of a Corner Lot Dwellings

New cards
34

80%

Dwellings shall not occupy ___ of the total lot area of an Inside Lot

New cards
35

2.70m, 2.40m , 2.10m

Minimum ceiling height of an artificially ventilated structure. (From ground floor to proceeding floors)

New cards
36

2.70m

Minimum ceiling height of a naturally ventilated structure. (From ground floor to proceeding floors)

New cards
37

2m or 6sqm

Min. Room Sizes for a Habitable Room

New cards
38

1.5m or 3sqm

Min. Room Sizes for a kitchen

New cards
39

0.9m or 1.2sqm

Min. Room Sizes for a toilet

New cards
40

14 cu.m

Min. Air Space per person in a Habitable Room

New cards
41
  • 10% of floor area or > 1sqm

  • 5% of floor area or > 240mm x 240mm (size ng exhaust fan)

Min. Area of windows

New cards
42

Philippine Electrical Code

PEC; used for electrical requirements

New cards
43

Philippine Mechanical Engineering Code

PMEC; used for mechanical requirements

New cards
44
  • Residential

  • Commercial

  • Mixed-use

Types of Plans

New cards
45
  1. Lot Plans

  2. Architectural Plans

  3. Structural Plans

  4. Plumbing/Sanitary Plans

  5. Electrical Plans

  6. Mechanical Plans

  7. Fire Protection Plans

  8. Electronic Plans

  9. Interior Design

STEPS WHEN NAGPAPAGAWA NG HOUSE

New cards
46

Mechanical, Electrical, Plumbing, and Firefighting System

MEPFS

New cards
47

Building Utilities

BU

New cards
48

Natural Ground Level/ Natural Grid Line

  • NGL

  • Ground Zero (0), 00.00mm

New cards
49
  • Float Glass

  • Tempered Glass

  • Heat-soaked Glass

  • Laminated Glass

  • Double Glazing

Types of Glass

New cards
50

Finished Floor Line

FFL

New cards
51

Transfer Certificate of Title

TCT

New cards
52

Road Right of Way

RROW

New cards
53

Park Structures, Recreation, & Entertainment

PRE

New cards
54

Utilities, Transportation, & Services

UTS

New cards
55

Planned Unit Development

PUD

New cards
56

General Institutional

GI

New cards
57

Certificate of Completion

CoC

New cards
58

Copy of Contract Lease

CoCL

New cards

Explore top notes

note Note
studied byStudied by 22 people
... ago
5.0(1)
note Note
studied byStudied by 11 people
... ago
5.0(1)
note Note
studied byStudied by 23 people
... ago
5.0(1)
note Note
studied byStudied by 4 people
... ago
5.0(1)
note Note
studied byStudied by 2 people
... ago
5.0(1)
note Note
studied byStudied by 5 people
... ago
5.0(1)
note Note
studied byStudied by 5 people
... ago
5.0(1)
note Note
studied byStudied by 45 people
... ago
5.0(1)

Explore top flashcards

flashcards Flashcard (25)
studied byStudied by 5 people
... ago
5.0(2)
flashcards Flashcard (41)
studied byStudied by 2 people
... ago
5.0(1)
flashcards Flashcard (239)
studied byStudied by 1 person
... ago
5.0(1)
flashcards Flashcard (21)
studied byStudied by 4 people
... ago
4.0(1)
flashcards Flashcard (54)
studied byStudied by 13 people
... ago
5.0(1)
flashcards Flashcard (28)
studied byStudied by 1 person
... ago
5.0(1)
flashcards Flashcard (24)
studied byStudied by 1 person
... ago
5.0(1)
flashcards Flashcard (130)
studied byStudied by 15 people
... ago
5.0(1)
robot