Quantity Surveying

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
full-widthPodcast
1
Card Sorting

1/66

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 2:48 PM on 8/10/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

67 Terms

1
New cards

The specialized field in the construction industry that focuses on managing project cost and ensuring financial efficiency.

Quantity Surveying

2
New cards

The specific documents that outlines the required materials, their quantities, and specification for a project.

Bill of materials

3
New cards

The violation that occurs when key materials or components needed cost are valued lower than their actual needed cost.

Underestimation

4
New cards

The illegal practice of listing non-existent or fake items in the project cost.

Inclusion of ghost materials

5
New cards

The practice of charging higher than the actual market value

Overpricing

6
New cards

The specific project issue that happens when a project exceeds its approve financial limit

Budget Overrun

7
New cards

The primary benefit of Qs expertise that ensures honesty and clarity in financial dealings.

Transparency

8
New cards

What document contains an itemized list of materials, parts, and costs that, if overpriced, inflates project costs?

Bill of Materials (BOM)

9
New cards

What term refers to fictitious items added to a Bill of Materials (BOM) to fraudulently inflate costs?

Ghost materials

10
New cards

What specific law or regulatory framework in the Philippines must cost estimations adhere to ensure safety and alignment

National Building Code (NBC)

11
New cards

In what year was a major government-funded construction project in the Philippines halted due to an inflated BOM

2018

12
New cards

What specific ethical standard requires quantity surveyors to prevent the sharing of sensitive project information?

Protecting confidentiality

13
New cards

Identify the construction process that involves predicting the total cost of a project, including labor, materials, equipment, and overhead costs.

Estimating

14
New cards

Foundational principle of accurate estimating that requires a thorough review of construction drawings to determine exact material quantities.

Accuracy and Detail in Measurements

15
New cards

Expenses directly linked to a project, such as materials, labor, equipment, and subcontractors?

Direct costs

16
New cards

Overhead costs, project management fees, and administrative expenses that are not tied directly to a specific construction activity.

Indirect costs

17
New cards

Identify the specific funds set aside to handle unexpected project issues, delays, or unforeseen changes in material prices.

Contingency costs

18
New cards

Which factors mentioned in the text can cause significant errors like underestimating or overpricing if outdated data is used?

Labor availability, inflation rates, and supply chain disruptions

19
New cards

Name the project element defined by architectural and engineering plans that a cost estimate must align with closely.

Project scope

20
New cards

Identify the key requirement for accurate cost estimation that depends heavily on recent market prices, labor availability, inflation rates, and supply chain updates.

Use of Reliable Data

21
New cards

Which principle requires an estimate to align closely with the architectural plans, engineering designs, and technical specifications?

Consistency with Project Scope

22
New cards

Name the consequence that occurs when estimators rely on outdated or inaccurate data instead of current industry market trends.

Significant errors (either underestimating or overpricing project costs)

23
New cards

Which factor determines a project's complexity and must be thoroughly understood by the estimator to ensure the budget aligns with the scope?

Project specifications/complexity

24
New cards

List the six fundamental principles of estimating mentioned as vital to successful project execution.

Accuracy, detailed cost breakdown, reliable data, alignment with project scope, risk assessment, and regular updates.

25
New cards

State the term used for the comprehensive process that effective estimators use to factor in potential material price increases, adverse weather conditions, or labor strikes.

Detailed Risk Assessment

26
New cards

Involves updating cost estimates regularly to reflect changes in project scope, design, or timeline.

Regular Updates and Revisions.

27
New cards

relies heavily on accurate cost estimates for material procurement and labor allocation.

Scheduling and Time Management.

28
New cards

Pinpoint the specific type of management that helps project managers identify potential issues before they become critical problems by including contingency funds.

Risk Management.

29
New cards

Which specific concept is essential for contractors and construction firms to ensure they maintain healthy profit margins?

Profitability

30
New cards

Identify the document that serves as the financial blueprint for an entire construction project.

A well-structured cost estimate

31
New cards

Which task involves considerable mathematical computation works to calculate various materials required for a construction project?

Estimating Bill of Materials

32
New cards

Identify the specialized measuring tool listed under the required items for an estimator

Architect's scale

33
New cards

Identify the broader professional field that is concerned with estimation, planning, and control costs on construction projects.

Quantity Surveying

34
New cards

Which estimate is calculated by multiplying building area by cost per area?

Approximate Estimate (or Rough Estimate)

35
New cards

Estimate type that includes material, labor, and overhead costs.

Detailed Estimate

36
New cards

Identify the drawings and specifications used to calculate bills of materials.

Working drawings and construction specifications

37
New cards

This formal document is often issued to define the exact date a contractor can officially begin work.

Notice to Proceed

38
New cards

This term refers to the stage where the project is sufficiently complete for the owner to occupy or utilize it for its intended purpose.

Substantial Completion

39
New cards

These specific timeline targets are established in a contract to clarify and track project progress.

Progress Milestones

40
New cards

Contractual delays that are eligible for an extension of time or cost adjustments fall under this specific classification.

Compensable Delays

41
New cards

Project delays that could have been avoided by one of the involved parties are classified under this specific term.

Non-compensable Delays

42
New cards

This specific contractual clause outlines how the full project cost is determined and structured for disbursement.

Price and Payments Provisions

43
New cards

This financial term represents a portion of the progress payments withheld until the entire project is completed satisfactorily.

Retainage

44
New cards

This reference document itemizes the cost of various individual components of the project to help track financial progress.

Schedule of Values

45
New cards

Essential questions regarding project timelines, delays, and payments must be fully addressed within this specific document section.

General Conditions Section

46
New cards

These validly executed contract amendments act as mini-agreements to modify the initial price, schedule, or scope of work.

Change Orders

47
New cards

Contractual provisions that authorize an owner to unilaterally make changes to the work, with the price and schedule changes to be agreed upon later.

Change Directives

48
New cards

State the term for simple adjustments to a project that do not affect either the price or the time to complete performance.

Minor Changes

49
New cards

Identify the contract section that outlines the circumstances where a contract might be paused or ended, including issues like an owner having funding problems or project delays.

Suspension & Termination

50
New cards

The term for a specific clause present in almost every construction contract that lists the various ways an agreement can legally end.

Termination clause

51
New cards

Primary ground for terminating a contract that involves a serious violation or failure to perform the agreed duties.

Breach of contract (for cause)

52
New cards

Provide three other contractual reasons or circumstances mentioned in the text under which a contract could be legally ended besides a breach.

a. Frustration

b. convenience

c. or other circumstances

53
New cards

Specify the section of a construction contract designed to provide guidance on how disagreements and conflicts should be handled.

Claims and Disputes

54
New cards

Document that serves as an addition or amendment to the general conditions section to detail specific clauses for a project.

Special Conditions of Contract (SCC)

55
New cards

State the specific document that the Special Conditions of Contract must be read in conjunction with, alongside specifications and drawings.

General Conditions of Contract

56
New cards

Document that overrides the provisions of the General Conditions of Contract in case of a variance or repugnancy.

Special Conditions of Contract

57
New cards

Core concept in contract management that is crucial to ensuring fairness, trust, and accountability in the construction industry.

Ethical integrity

58
New cards

Form of contract deception that involves falsified documents, undisclosed liabilities, or intentional misrepresentation of contract terms.

Contract Fraud and Misrepresentation

59
New cards

Identify the type of contract clauses designed to unfairly favor one party through hidden penalties, excessive liability, or ambiguous payment terms.

Unethical Contract Clauses

60
New cards

Critical process of adhering to national and industry-specific regulations to ensure legal compliance and maintain project viability.

Standards and Compliance Management in Contracts

61
New cards

State three prevalent problems in contract execution, which include unfair contract clauses, delayed payments, and non-compliance with safety and labor standards.

Common Compliance Issues

62
New cards

Give the specific term for provisions in a contract that ensure adherence to national building codes, environmental policies, and labor laws.

Ensuring Regulatory Compliance Strategic and Analytic Resource Management

63
New cards

Management practice that ensures financial stability and long-term sustainability in construction projects through effective resource distribution.

Strategic and Analytic Resource Management in Contracts

64
New cards

Give the term for using well-structured contracts to outline the allocation of labor, materials, and financial resources to prevent mismanagement and cost overruns.

Resource Allocation and Cost Control

65
New cards

Contract provisions that support corporate social responsibility and long-term economic benefits by incorporating environmentally friendly materials and waste management plans.

Long-term Sustainability

66
New cards

Identify the alternative dispute resolution method highlighted in the first example that preserves professional relationships and avoids immediate litigation.

Mediation

67
New cards

State the specific type of contract agreement highlighted in the Philippines example that enables large-scale transportation infrastructure projects through balanced risk-sharing.

Public-Private Partnership (PPP)