ACI Grade 1 Field Testing Certification Practice Test

0.0(0)
studied byStudied by 6 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/96

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

97 Terms

1
New cards

For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F)

False (2-5 minutes)

2
New cards

The temperature measuring device must be accurate to within 0.1 degree. (T or F) The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of _____ to _____ degree F ( ______ to ______ degree C)

30 to 120 degree F ( 0 to 50 degree C)

3
New cards

A composite sample is not needed if only the temperature test is being run. (T or F)

True

4
New cards

The temperature of fresh concrete in a placement must be measured by inserting a thermometer into the top six inches of concrete. (T or F)

False (3 in.)

5
New cards

The temperature of the concrete is recorded to the nearest ______ degree F (______ degree C)

1 degree F (0.5 degree C)

6
New cards

ASTM C1064 states the container used to measure temperature of concrete must be large enough to provide at least 5 inches of concrete around the sensor. (T or F) Calibrate the temperature measuring device at least __________, or whenever there is a question of accuracy.

Annually

7
New cards

After the thermometer is placed in the concrete:

Gently press concrete around the thermometer

8
New cards

According to ASTM C1064, what is one reason to take the temperature of concrete?

Verify conformance

9
New cards

It is allowable to remove the temperature measuring devices from the freshly mixed concrete to read the temperature if you cannot see the reading. (T or F)

False

10
New cards

The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. (T or F)

False

11
New cards

Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. (T or F)

False (15 mins)

12
New cards

The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. (T or F)

False (Contamination and rapid evaporation)

13
New cards

If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test. (T or F)

False (wet screened)

14
New cards

The composite sample not be remixed before beginning any tests. (T or F)

False

15
New cards

Sampling should normally be performed, as the concrete is discharged from the mixer. (T or F)

True

16
New cards

ASTM Method C172 includes the sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. (T or F)

True

17
New cards

After sampling is completed, start the tests for slump and air content within:

a. 2 ½ minutes b. 10 minutes c. 15 minutes d. None of the above

None of the above (5 mins)

18
New cards

In any case, do not obtain samples until:

a. All the water and admixtures have been added to the concrete b. 200 revolutions of the drum have been obtained c. ½ of the water has been added d. None of the above

All the water and admixtures have been added to the concrete

19
New cards

No samples shall be taken before_________ or after_________ of the batch has been discharged.

a. 10% or after 90% b. 20% or after 90% c. 20% or after 80% d. None of the above

10% or after 90%

20
New cards

When strength tests are to be made, the minimum size of the composite sample shall be:

a. ¼ cubic foot b. 1 cubic foot c. Any convenient size d. 1 Wheelbarrow

1 cubic foot

21
New cards

Sample the concrete from the chute of a truck mixer by:
a. Raising chute to stop the flow and scoop concrete from there into the slump cone and cylinder molds b. Passing a receptacle completely through the discharge steam or by completely diverting the discharge into the sample container c. Holding a shovel in the flow and direct half into a bucket d. None of the above

Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.

22
New cards

Fresh concrete to be tested at the job site should be sampled from:

a. The beginning of mixer discharge b. The last concrete discharged c. Two or more regularly spaced intervals during discharge of the middle portion of the batch d. All of the above

Two or more regularly spaced intervals during discharge of the middle portion of the batch

23
New cards

The elapsed time between obtaining the first and final portions of the composite sample, according to ASTM C172, shall not exceed:

a. 10 minutes b. 20 minutes c. 30 minutes d. None of the above

None of the above

24
New cards

The sides of the slump cone should be tapped with the mallet to consolidate the concrete in the mold. (T or F)

False

25
New cards

For the slump test, when Rodding the second layer and the top layer, the tamping rod should just penetrate into the underlying layer. (T or F)

True

26
New cards

According to ASTM C143, it is permissible to use a mold, which clamps to a non absorbent base. (T or F)

True

27
New cards

When filling the final layer of the slump cone, never heap the concrete above the top of the mold. (T or F)

False

28
New cards

The filling of the slump cone should be done in three layers of equal height. (T or F)

False

29
New cards

The slump test may be done on any flat surface. (T or F)

False

30
New cards

When filling the slump cone, each layer should be rodded 25 times. (T or F)

True

31
New cards

The slump cone is filled in three layers of equal volume. (T or F)

True

32
New cards

Concrete should be removed from around the base before the cone is lifted. (T or F)

True

33
New cards

The slump cone should be raised carefully, vertically upward, in a steady motion in ________ Seconds

a. 2 to 6 b. 4 to 8 c. 3 to 7 d. 5 to 9

3 to 7

34
New cards

The elapsed time between the start of filling the slump cone and the removal of the cone must be no more than:

a. 1 minute b. 2 1/2 minutes c. 5 minutes d. 15 minutes

2 1/2 minutes

35
New cards

The slump should be measured to the nearest

a. Tenth of an inch b. Quarter of an inch c. Half of an inch d. 1 inch

Quarter of an inch

36
New cards

In order to determine slump, you should measure the vertical distance from:

a. Top of the mold to the highest point of the slumped concrete b. Top of the concrete to the base of the concrete c. Top of the mold to the displaced original center of the top surface d. None of the above

Top of the mold to the displaced original center of the top surface

37
New cards

The dimensions of the slump cone are:

a. Top diameter 6 inches, bottom diameter 12 inches, height 12 inches b. Top diameter 4 inches, bottom diameter 8 inches, height 16 inches c. Top diameter 4 inches, bottom diameter 8 inches, height 12 inches d. None of the above

Top diameter 4 inches, bottom diameter 8 inches, height 12 inches

38
New cards

In the slump test, if a decided falling away or shearing off the concrete from one side or portion of the mass occurs upon raising the slump cone, one should:

a. Reject the load for lack of uniformity b. Accept the load but warn the plant c. Disregard the test and make a new test when the next load arrives d. Disregard the test and make a new test on another portion of the sample

Disregard the test and make a new test on another portion of the sample

39
New cards

The slump cone should be struck-off with:

a. A float or trowel b. A straight edge c. The tamping rod d. Any of the above

The tamping rod

40
New cards

The slump cone must be placed:

a. Only on the flat base provided by the mold’s manufacturer b. On a flat, clean, dry, wooden surface c. On a flat moist, non-absorbent, rigid surface d. On flat, dampened, compacted soil

On a flat moist, non-absorbent, rigid surface

41
New cards

When rodding the second and third layers, the rod should penetrate the preceding layer by about 1 inch. (T or F)

True

42
New cards

The normal ½ cubic foot bucket may not be used to determine Density (unit weight) of lightweight concrete. (T or F)

False (0.2 bucket)

43
New cards

Concrete slump of less than 1 inch should be consolidated using a vibrator. (T or F)

True

44
New cards

ASTM C138 states, "the minimum capacity of the bucket depends on the maximum slump requirement." (T or F)

False

45
New cards

According to ASTM C138, after rodding each layer, tap the sides of the container, with the rod exactly 25 times. (T or F)

False

46
New cards

The outside of the density bucket should be cleaned before weighing. (T or F)

True

47
New cards

Concrete with a slump less than 1 inch should be rodded 25 times per layer. (T or F)

False (Use Vibrator)

48
New cards

According to C138, concretes with slumps of 1-3 inches may be compacted with the vibrator or the rod. (T or F)

True

49
New cards

The unit weight bucket must be calibrated at least once a month. (T or F)

False

50
New cards

According to ASTM C138, when rodding the bottom layer, the rod shall not forcibly strike the bottom of the measure. (T or F)

True

51
New cards

The strike-off plate must be:

a. At least ¼ inch thick if metal b. Flat c. At least ½ inch thick if glass or acrylic d. All of the above

At least ¼ inch thick if metal

52
New cards

Given the following: wt of bucket 16.2 lbs, volume of bucket =0.498 cf, wt of bucket and concrete 88.5 lbs.

a. 140.7 lb/ft³ b. 145.2 lb/ft³ c. 177.7 lb/ft³ d. None of the above

177.2 lb/ft^3

53
New cards

What is the optimum amount of the concrete that should be protruding above the top of the mold after the third layer has been tapped by the mallet?

a. None b. About a 1/8th inch c. About 1 inch d. About 2 ½ inches

About a 1/8th inch

54
New cards

After strike-off, the next operation is:

a. Tap the sides of the container smartly 10-15 times with the appropriate mallet b. Rod the top layer 25 times with the tamping rod c. Clean the excess concrete from the exterior of the measure d. Determine the net weight of concrete in the measure

Clean the excess concrete from the exterior of the measure

55
New cards

Strike-off density (unit weight) bucket by:

a. Using a trowel in a sawing motion b. Using a straightedge in a sawing motion c. Using a flat plate in a sawing motion d. None of the above

Using a flat plate in a sawing motion

56
New cards

If the density (unit weight) of concrete is 146 lb/ft³ and the total batch weight is 35,468 lb., what is the yield?

a. 9.7 yd³ b. 7.0 yd³ c. 9.0 yd³ d. 243 yd³

9.0 yd³

57
New cards

The tamping, rod used for the unit weight test:

a. A round, straight steel rod b. Has a 5/8 inch diameter with the tamping end rounded c. Is approximately 24 inches in length d. All of the above

All of the above

58
New cards

For a design batch of 9.0 cubic yards, the total weight of all materials batched was 36,400 lb., and the actual yield was 9.5 cubic yards. What was the relative yield?

a. 1.06 b. 0.95 c. 4044 ft³ d. 3832 lbs.

1.06

59
New cards

Determine the air content. Total material batched 37,500 lbs…design yield 9.0 yd³…theoretical unit wt. 150.0 lbs/ft³…actual unit wt. 140.0 lbs/ft³ actual yield 9.6 yd³

a. 7.1% b. 6.7% c. 8.7% d. Not enough information

6.7%

60
New cards

The pressure method should be used for determining the air content of concrete containing lightweight aggregates. (T or F)

False

61
New cards

The aggregate correction factor should only be used when concrete containing lightweight aggregate is being tested. (T or F)

False

62
New cards

After consolidation, if the measure contains a great excess of material, remove a quantity of representative concrete then strike off the surface. (T or F)

True

63
New cards

ASTM C231 covers procedures for both Type A and Type B meters. (T or F)

True

64
New cards

During filling with water, once water emerges through the opposite petcock, the Type B pressure meter should be jarred to expel all air bubbles through the petcock. (T or F)

True

65
New cards

Using the Type B meter, the gauge should read to the nearest 0.1%. (T or F)

True

66
New cards

Wet sieving is needed when the sample of fresh concrete contains aggregates larger than 2 inches. (T or F)

True

67
New cards

After the Type B pressure meter is filled with water and all the air has been expelled through the petcock:

a. Pump up the pressure chamber until the gauge reads zero b. Pump up the pressure chamber until the gauge reads the coarse aggregate correction factor c. Close the bleeder valve and pump up the pressure chamber and adjust the gauge to the initial pressure line d. Close the bleeder valve and pump the meter to the maximum pressure

Close the bleeder valve and pump up the pressure chamber and adjust the gauge to the initial pressure line

68
New cards

Given that the reading on the pressure gauge is 5.3 percent, unit weight=143.7 lbs/cf, slump=6.5 inches, and aggregate correction factor is 0.2 percent, what is the air content?

a. 5.1 % b. 5.3% c. 5.5% d. None of the above

5.1%

69
New cards

To determine the air content use the Type B meter:

a. Read the gauge directly. This is the air content. b. Read the gauge and add the aggregate correction factor. c. Read the gauge and subtract the aggregate correction factor. d. None of the above.

Read the gauge and subtract the aggregate correction factor

70
New cards

After the Type B meter bowl is struck-off, cleaned and the lid is clamped on:

a. Close the main air and air bleeder valves and apply pressure before the water is added b. Open the main air and air bleeder valves, open both petcocks and fill with water c. Open the main air and air bleeder valves, open one petcock and fill with water d. Close the main air valve, open both petcocks and fill with water

Open the main air and air bleeder valves, open both petcocks and fill with water

71
New cards

Just Prior to adding concrete to the bowl you should:

a. Dry the bowl thoroughly and place it on a flat, level, and firm surface b. Dip the bowl in water and place it on a flat, level, and firm surface c. Dampen the bowl and place it on a flat, level, non-absorbent, and firm surface d. Oil the inside of the bowl and place it near the curing box

Dampen the bowl and place it on a flat, level, non-absorbent, and firm surface

72
New cards

Rod each Layer of concrete:

a. 10-15 times b. Exactly 25 times c. 1 time for each 2 in² of surface area d. None of the above

Exactly 25 times

73
New cards

This test method cannot be used to determine the air content of concrete containing lightweight aggregates. (T or F)

False

74
New cards

The rollameter base should be filled in three equal layers by volume. (T or F)

False (2 layers)

75
New cards

Isopropyl alcohol is used only at the end of the test procedures to dispel foam. (T or F)

False

76
New cards

The rollameter should never be used when ambient temperatures are below 60°F. (T or F)

False

77
New cards

If the concrete contains coarse aggregate particles that would be retained on a 1-1/2 in sieve, the concrete must be wet sieved to remove large sizes before testing in the rollameter. (T or F)

True

78
New cards

The rollameter may be used for concretes containing lightweight or normal weight aggregates. (T or F)

True

79
New cards

The calibrated measuring cup is equivalent to approximately 1% of the volume of the bowl of the air meter. (T or F)

True

80
New cards

Always add isopropyl alcohol prior to the initial filling of the meter with liquid. (T or F)

False (Pint of water first)

81
New cards

Immediately after water is added and the cap is tightened, the next step is:

a. Roll and rock the unit for approximately one minute b. Tap the sides of the bond 10-15 times c. Allow the unit to stand until the water column stabilizes d. Invert and agitate the unit for at least 45 seconds

Invert and agitate the unit for at least 45 seconds

82
New cards

Which of the following equipment is not used in the ASTM C173 tests?

a. Strike off plate b. 5/8-inch diameter rod c. 1 ¼ pound mallet d. Funnel

Strike off plate

83
New cards

After the meter had been rolled twice with no change in the liquid level and no foam on the surface of the liquid, the direct reading of the liquid in the neck was 3.25%. What was the air content of the concrete? The aggregate correction factor is 0.3% & 2 pints of alcohol were added initially.

a. 6.25 b. 0.25 c. 3.55 d. 3.25

3.25%

84
New cards

Read the liquid level in the neck, estimating to the nearest:

a. 1.0 % b. 0.5% c. 0.25% d. 0.1%

0.25%

85
New cards

After the top is clamped on, fill the rollameter with liquid by:

a. Carefully pouring water and alcohol directly on the top of the concrete surface without using the funnel b. Using the syringe to add all the water & alcohol c. Using the funnel until the liquid appears in the neck d. None of the above

Using the funnel until the liquid appears in the neck

86
New cards

The rolling procedure must be performed:

a. With a rollameter in a horizontal position b. With the neck of the rollameter elevated c. While striking the base with the mallet d. All of the above

With the neck of of the rollameter elevated

87
New cards

Standard concrete specimens for comprehensive strength tests should be "initially" cured at 50 to 90° F. (T or F)

False

88
New cards

Standard compressive strength specimens for acceptance may be 6 X 12 or 4 X 8 inch cylinders. (T or F)

True

89
New cards

While rodding the top two layers, ASTM C31 requires the rod to penetrate the preceding Layer by 4 inches. (T or F)

False

90
New cards

Standard concrete test cylinders shall be molded on a level surface as near as practicable to its initial curing location. (T or F)

True

91
New cards

Never tap the sides of a compression test specimen with the mallet. (T or F)

False

92
New cards

4 X 8 inch cylinders that are rodded should be filled in 3 layers of equal volume. (T or F)

False

93
New cards

When rodding ASTM C31 specimens, each layer should be rodded how many times?

a. 10-15 times b. 25 times c. 50 times d. None of the above

25 times

94
New cards

The top of the cylinders should be covered after molding with:

a. A plastic sheet or bag b. A plastic cap or lid c. A non-absorptive, non reactive plate d. Any of the above

Any of the above

95
New cards

Standard cured compressive test specimens cannot be transported from the field to the laboratory until:

a. 4 hours after initial set b. at least 2 days c. 12 hours after final set d. 8 hours after final set

8 hours after final set

96
New cards

Light-gauge single use molds, susceptible to damage if tapped with the mallet should Be tapped with:

a. The tamping rod b. An open hand C. The edge of the wooden float c. None of the above

An open hand

97
New cards

Cylinders shipped from the field to the laboratory for testing must be:

a. Protected from physical damage b. Protected from moisture loss c. Protected from freezing d. All of the above

All of the above