Quantity Survey
Preliminary estimation technique to establish
the quantity of a particular small part of work
Cost estimation
approximation of a cost of a portion or a
whole project
Labor and materials
Construction equipment
Construction supervision
General office overhead
Basic costs may be classified according to
Bill of Materials
A permit requirement which lists raw materials
and components to construct a project
Design Estimates
These estimates runs
parallel with the design and planning
Bid Estimates
These estimates are submitted for negotiation or competitive bidding which consists of construction costs plus a markup to cover general overhead and profits.
Subcontractor quotations
Quantity takeoffs
Construction procedures
Bid estimate is derived from a combination of the following:
Control Estimates
These estimates are in
used monitoring the project during
construction:
Excavated earth volume
in excavation earth volume is equal to
125 % loose volume (earthfill)
backfilling is equal to
Screening estimates
uses structures
of similar size to compare cost
Preliminary or conceptual estimates
coarse and rough estimates (an
assumption based on area, volume or
bulk)
Detailed estimates
fine detail of
quantities as plans and specifications
is broken down into components