BT4- QUANTITY SURVEYING AND COST ESTIMATES

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/12

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 4:53 PM on 7/24/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

13 Terms

1
New cards

Quantity Survey

Preliminary estimation technique to establish

the quantity of a particular small part of work

2
New cards

Cost estimation

approximation of a cost of a portion or a

whole project

3
New cards

Labor and materials

Construction equipment

Construction supervision

General office overhead

Basic costs may be classified according to

4
New cards

Bill of Materials

A permit requirement which lists raw materials

and components to construct a project

5
New cards

Design Estimates

These estimates runs

parallel with the design and planning

6
New cards

Bid Estimates

These estimates are submitted for negotiation or competitive bidding which consists of construction costs plus a markup to cover general overhead and profits.

7
New cards

Subcontractor quotations

Quantity takeoffs

Construction procedures

Bid estimate is derived from a combination of the following:

8
New cards

Control Estimates

These estimates are in

used monitoring the project during

construction:

9
New cards

Excavated earth volume

in excavation earth volume is equal to

10
New cards

125 % loose volume (earthfill)

backfilling is equal to

11
New cards

Screening estimates

uses structures

of similar size to compare cost

12
New cards

Preliminary or conceptual estimates

coarse and rough estimates (an

assumption based on area, volume or

bulk)

13
New cards

Detailed estimates

fine detail of

quantities as plans and specifications

is broken down into components