1/39
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Ripping or Framing Hammer
“C” Wrench or Crescent Wrench
Types of Screw Drivers - Ratchet/Yankee, Flat, Philips, and Robertson or Square Drive
Sheep Nose Pliers or Slip Joint
Pipe Wrench
Diagonal Cutting Plier or “Dikes”
“C” Clamp
Spring Clamp or Spring Clip
Dolly
Johnson “J” Bar and Hand Truck
Scenery Cart
SawzAll or Reciprocating Saw
Circular or “Skil” Saw
Wire Color Codes
Bare Copper - Ground
Green - Ground
White - Neutral
Black - Hot
Blue - Hot
Red - Hot
Amperage Ratings
No. 14 Wire - 15 AMP
No. 12 Wire - 20 AMP
Fresnel
Leko
Strip Light, Border Light, or X-Ray
Follow Spot
Par Head
Beam Projector
Scoop
For a Fresnel
Barn Doors
For a Fresnel
Snoot or Top Hat
Three main colors to a light
Red, Green, and Blue
Theater Layout
Cross Over
Orchestra Pit
Auditorium (House)
Stage Left and Right Wings
Six tools to bring to a call
Hammer
Tape Measure
Utility Knife
Adjustable Wrench
Pliers
Diagonal Cutters
If you see a dangerous condition, who do you tell?
Steward or Safety Coordinator
If you get hurt at work, who do you notify?
Safety Coordinator and nearest roadie
How many people does it take to carry a ramp?
4, one on each corner
What is the order of hanging legs and borders from downstage to upstage?
Border first, then a set of two legs, then repeat going upstage.
Parts of a Crosby (cable/rope clamp) and which part touches the live end rope?
Saddle Thumb
Nut
U-Bolt
Thimble
The nuts touch the live end and the u-bolt touches the dead end
What does IATSE stand for?
International Alliance of Theatrical Stage Employees
Parts of a follow spot?
Pan and Tilt Locks
Lift Handles at the back sides
How to install an iris on a leko?
Loosen the screws above the top shutter and slide up the flap. Take the iris and slide the “flat” side of the iris towards the lamp into the leko. Move the shutter back and re-tighten the screws.
Where do barn doors attach to the leko?
Lekos do not need barn doors because they have shutters built into them already
Which is higher? The loft or the loading bridge
The loft
How many 750W can you put on a 2.2k circuit?
2200 / 750 = 2.93 | 2 750Ws
Stage or Pin Type Receptacles
20 AMP 125 Volt
Grounding
2 Pole 3 Wire
What are the colors of a #12 gage cable?
Black, White, and Green