A complete set of vocabulary flashcards covering construction terms, safety, math, and project management for the North Carolina General Contractor exam.

Last updated 3:39 PM on 8/11/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

105 Terms

1
New cards

OSHA

Occupational Safety and Health Administration.

2
New cards

Ladder Extension (Above Roof)

Minimum of 3 feet3\,feet extension.

3
New cards

Call 811

The first thing to do before digging.

4
New cards

Footing

Spreads building load.

5
New cards

Foundation

Supports the structure.

6
New cards

Frost Line

Depth where ground freezes.

7
New cards

Dead Load

Weight of the building.

8
New cards

Live Load

People, furniture, and snow.

9
New cards

Bearing Wall

A wall that holds weight.

10
New cards

Joist

Supports a floor or ceiling.

11
New cards

Beam

Carries heavy loads.

12
New cards

Header

Supports the opening above doors or windows.

13
New cards

Rafter

Roof support.

14
New cards

Truss

Engineered roof frame.

15
New cards

Stud Spacing

Usually 16"Ā O.C.16\text{" O.C.}

16
New cards

O.C.

On center.

17
New cards

Anchor Bolts

Hold framing to the foundation.

18
New cards

Sill Plate

The first board on the foundation.

19
New cards

Concrete Cure Time

About 28 days28\,days.

20
New cards

Slump Test

Measures concrete consistency.

21
New cards

Rebar

Strengthens concrete.

22
New cards

Mortar

Holds bricks together.

23
New cards

Grout

Fills spaces or tile joints.

24
New cards

Flashing

Keeps water out.

25
New cards

Vapor Barrier

Stops moisture.

26
New cards

R-value

Insulation rating or efficiency.

27
New cards

GFCI

Protects from shock; located in wet areas.

28
New cards

AFCI

Prevents electrical fires; located in living areas.

29
New cards

P-trap

Blocks sewer gas.

30
New cards

Vent Pipe

Helps drains flow.

31
New cards

Blueprint

Building drawings.

32
New cards

Elevation

Side view drawing.

33
New cards

Section

Cut-through view drawing.

34
New cards

Change Order

A written contract change.

35
New cards

Punch List

Final repairs or items left to finish.

36
New cards

Certificate of Occupancy

Official approval for a building to be used.

37
New cards

Lien

Legal claim for unpaid work.

38
New cards

Critical Path

The longest project schedule sequence.

39
New cards

PPE

Personal Protective Equipment.

40
New cards

Fall Protection Threshold

Required when working at heights of 6 feet6\,feet or more.

41
New cards

Class A Fire

Involves wood and paper.

42
New cards

Class B Fire

Involves flammable liquids.

43
New cards

Class C Fire

Involves electrical equipment.

44
New cards

Class D Fire

Involves metals.

45
New cards

Class K Fire

Involves cooking oils.

46
New cards

Easement

The right to use another person's land.

47
New cards

Setback

Minimum distance from the property line.

48
New cards

Sheathing

Covers framing.

49
New cards

Underlayment

Layer under roofing or flooring.

50
New cards

Ridge

Peak of the roof.

51
New cards

Valley

Roof intersection or inside corner.

52
New cards

Fascia

Board at the roof edge.

53
New cards

Soffit

Underside of the eave.

54
New cards

PSI

Pounds per square inch.

55
New cards

Level

Perfectly horizontal.

56
New cards

Plumb

Perfectly vertical.

57
New cards

Square

90-degree90\text{-degree} angle.

58
New cards

Benchmark

Fixed reference point.

59
New cards

Deflection

Bending under load.

60
New cards

Compression

A pushing force.

61
New cards

Tension

A pulling force.

62
New cards

Shear

A sliding force.

63
New cards

Torque

Twisting or turning force.

64
New cards

Joist Hanger

Supports joists.

65
New cards

Bridging

Keeps joists straight.

66
New cards

Rim Joist

Outside floor joist.

67
New cards

Subfloor

Base floor layer.

68
New cards

Tempered Glass

Safety glass.

69
New cards

Low-E Glass

Energy-saving glass.

70
New cards

Condenser

Outdoor AC unit.

71
New cards

Evaporator Coil

Indoor cooling coil.

72
New cards

Water Hammer

Banging sound in pipes.

73
New cards

Ampere

Unit of electrical current.

74
New cards

Volt

Unit of electrical pressure.

75
New cards

Watt

Unit of electrical power.

76
New cards

Ohm

Unit of electrical resistance.

77
New cards

Conduit

Protects electrical wire.

78
New cards

As-built Drawings

Final drawings showing changes.

79
New cards

RFI

Request for Information.

80
New cards

Shop Drawings

Detailed fabrication drawings.

81
New cards

Liquidated Damages

Agreed penalties for being late.

82
New cards

Substantial Completion

The stage where the building can be used.

83
New cards

Lump Sum Contract

One fixed price.

84
New cards

Cost-plus Contract

Total cost plus a contractor fee.

85
New cards

Time and Material Contract

Paying for actual labor and materials used.

86
New cards

Float

Extra time available in a schedule.

87
New cards

Lead Time

Wait time before materials arrive.

88
New cards

Ladder Angle (4:1 Rule)

For every 4 feet4\,feet in height, move the base out 1 foot1\,foot.

89
New cards

Shoring

Supports trench walls.

90
New cards

Benching

Stepped trench walls.

91
New cards

OSB

Oriented Strand Board.

92
New cards

Gable

Triangle end of a roof.

93
New cards

Dormer

Window sticking out of a roof.

94
New cards

Area Formula (Rectangle)

LengthƗWidth\text{Length} \times \text{Width}

95
New cards

Triangle Area Formula

BaseƗHeightĆ·2\text{Base} \times \text{Height} \div 2

96
New cards

Circle Area Formula

π×r2\pi \times r^2

97
New cards

Cubic Yards Formula

CubicĀ feetĆ·27\text{Cubic feet} \div 27

98
New cards

1 Acre

43,560 sq.ft.43,560\,sq. ft.

99
New cards

Gross Profit

Salesāˆ’DirectĀ costs\text{Sales} - \text{Direct costs}

100
New cards

Labor Burden

Taxes+insurance+benefits\text{Taxes} + \text{insurance} + \text{benefits}