1/17
Fill-in-the-blank practice flashcards covering power system grids, voltage classifications, distribution components, AC/DC comparison, Kelvin's Law, and cable types.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
NLDC stands for National Level Load Dispatch Centre, while SLDC stands for State Level Load __________.
Dispatch Centre
As of May/June 2026, India's target is to achieve 500GW non-fossil capacity by 2030 and Net Zero by __________..
2070
In a primary transmission system, voltage is stepped up from 11kV to values such as 132kV, 220kV, or __________.
400 kV
The secondary distribution system uses a 11kV/415V substation transformer with its secondary winding connected in __________.
Star
The main consideration in the design of a feeder is its __________ carrying capacity.
current
While designing a distributor, __________ along its length is the main consideration.
voltage drop
According to voltage classification, Ultra High Voltage (UHV) refers to voltages of __________ and above.
765 kV
According to IE Rule 55, the limit of frequency variation must not be more than __________.
±3%
Underground cables categorized as Super Tension (S.T.) cables are designed for working voltages between 11kV and __________.
33 kV
An H-type cable is suitable for operating voltages up to __________.
33 kV
A strategic, hours-long voltage sag caused by system overload to prevent a blackout is known as a __________.
brownout
Unlike AC transmission systems, DC transmission lines do not suffer from __________ effect.
skin
Steel-cored aluminum conductors on steel lattice towers are roughly __________ times cheaper than the equivalent underground cable.
16
The volume of conductor material required in a 3-phase AC transmission line is inversely proportional to V2cos2(ϕ), where cos(ϕ) is the __________.
power factor
Roughly, the most economical transmission voltage can be chosen as __________ per kilometer.
650 V
For overhead transmission lines, the breakeven distance where DC becomes more economical than AC is between 500km and __________.
800 km
Kelvin's Law states that the most economical conductor size occurs when the variable part of annual fixed charges equals the annual cost of __________.
energy wasted
Underground transmission systems are generally limited to working voltages up to __________.
66 kV