Principles of Business Management - Chapter 9: Operations Management

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/40

flashcard set

Earn XP

Description and Tags

Flashcards covering core vocabulary, systems, formulas, and operational definitions from Chapter 9 of Principles of Business Management (5th Edition).

Last updated 7:40 AM on 9/16/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

41 Terms

1
New cards

Operations Management (OM)

The management of conversion (transformation) processes that involve creativity, design, productivity, and adding value within an organisation.

2
New cards

Operation

A process in which inputs are transformed into outputs, or any new task that involves a transformation such as setting up facilities, maintenance, or creating unique items.

3
New cards

Organisational Agility

The ability of an organisation to be nimble and react quickly, allowing operations to respond with minimal disruption when reconfiguring business processes.

4
New cards

Effectiveness

Doing the right things to create the most value for the company.

5
New cards

Efficiency

Doing something at the lowest possible cost.

6
New cards

Productivity

A common measure of how well inputs are being used by a business or country, calculated as Productivity=Outputs×Inputs1\text{Productivity} = \text{Outputs} \times \text{Inputs}^{-1} or Productivity=Output income×Input expenses1\text{Productivity} = \text{Output income} \times \text{Input expenses}^{-1}.

7
New cards

Lead Time

Also referred to as throughput time, it is the general time required for the actual manufacturing process.

8
New cards

Queue Time

The period for which a job stays in a queue at a work centre before being processed.

9
New cards

Set-up Time

The time needed to prepare equipment for processing a new job.

10
New cards

Processing Time

The actual time required to process a job.

11
New cards

Waiting Time

The empty time between completing the processing of a job and transporting it to the next work centre.

12
New cards

Transportation Time

The time needed to move a job from one work centre to another.

13
New cards

Inspection Time

The time required to verify whether a completed job meets quality standards.

14
New cards

Assignable Variation

Process variation resulting from mistakes, incorrect methods, defective inputs, or old equipment.

15
New cards

Random Variation

The natural variability present to some extent in all processes, even those that are stable and under control.

16
New cards

Operations Strategies

The total patterns of decisions and actions that form the roles, objectives, and activities of each part of an operation so that they align with overall business strategies.

17
New cards

Product Designs

Plans created specifically for goods or services.

18
New cards

Operations Designs

Plans formulated for how goods or services will be produced.

19
New cards

Categories of Operations Systems

The conventional classification of operations systems into continuous/repetitive, batch/job, and project operations systems based on product type, layout, product flow, materials handling, inventory, and labor requirements.

<p>The conventional classification of operations systems into continuous/repetitive, batch/job, and project operations systems based on product type, layout, product flow, materials handling, inventory, and labor requirements.</p>
20
New cards

Capacity Planning

The process of planning for necessary resources over a specific timeframe, split into long-term fixed capacity planning and short-to-medium-term variable capacity planning.

21
New cards

Loading

The process of allocating specific amounts of work to particular work centres.

22
New cards

Sequencing

Deciding on the specific order in which work tasks will be executed.

23
New cards

Scheduling

Determining how many jobs are to be done and setting the times at which they should be completed.

24
New cards

Monitoring

Checking and verifying that operational activities are proceeding according to plan.

25
New cards

Demand Time (D)

The total length of time a customer must wait to receive a product or service.

26
New cards

Production Time (P)

The entire throughput time required for an operation.

27
New cards

Re-order Point (ROP)

The specific level of stock at which an order must be placed for renewal, calculated using the formula ROP=D(LT)+SS\text{ROP} = D(\text{LT}) + \text{SS}.

<p>The specific level of stock at which an order must be placed for renewal, calculated using the formula $$\text{ROP} = D(\text{LT}) + \text{SS}$$.</p>
28
New cards

Periodic Inventory System

An inventory ordering variation commonly used by retailers and restaurants where stock is reordered on a set daily or weekly schedule.

29
New cards

Material Requirements Planning (MRP)

A push system that assists operations managers in planning when to place material orders and the quantity required.

30
New cards

Economic Order Quantity (EOQ)

A formula-based order quantity for each cycle that keeps overall inventory costs to a minimum.

31
New cards

Total Quality Management (TQM)

A holistic, organisation-wide approach to quality management covering quality inputs, processes, and outputs.

32
New cards

Quality

The degree to which a product satisfies client needs, conforms to specifications, is fit for purpose, and meets expected dimensions.

33
New cards

Statistical Process Control (SPC)

A quality management tool used to evaluate whether manufacturing or service delivery processes are under control or out of control.

34
New cards

Run-to-breakdown Maintenance

A reactive maintenance strategy of repairing equipment only after it experiences a failure.

35
New cards

Condition-based Maintenance

A maintenance strategy where equipment is serviced when visual or operational signs suggest it is likely to break.

36
New cards

Preventive Maintenance

A proactive maintenance strategy of regularly servicing equipment to avoid operational breakdowns.

37
New cards

Project

A temporary endeavor undertaken to create a unique product or service.

38
New cards

Gantt Chart

A simple, time-based visual chart commonly used for scheduling activities in smaller projects.

<p>A simple, time-based visual chart commonly used for scheduling activities in smaller projects.</p>
39
New cards

Critical Path

The longest sequential route of activities from the start to the completion of a project network diagram.

40
New cards

Enterprise Resource Planning (ERP)

An integrated software approach that maps all business processes to coordinate and control all company resources, preventing organizational silos.

41
New cards
<p>Quadruple Helix Model of Innovation</p>

Quadruple Helix Model of Innovation

An innovation model for Industry 4.0 that incorporates triple management theory, triple helix ecosystems, epochal society, and leaders upscaling agility.