1/6
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Entry Path
Ensure PCS Conditions
(Step 1 & 2)
Step 1 is checking 5psig and/or 176.5°F
Status of Secondary Plant?
(Step 3 & 4)
Notice:
Not all MSL Isolation paths, just MSIVs and Bypasses
Step 4:
Check for Faulted, RNO: Isolate Faulted
When/How to fill PCCWST
(Step 6)
Loss of Critical Switchgear power effect on Z.1
(Step 7)
Step 15: Jump to H2 Igniters
Restoring Containment with ES-1/2 available
(Step 8-14)
Step 8: Start one fan per train in SLOW
Notice: Without VCS, jump to Igniters
Step 9: SWS: <71psig, >7500gpm, <95°F
Step 10: CCS: <110°F
Step 11: Reset “T”
Step 12: IA to CNS
Step 13&14: VWS: PRHR off, Chiller, VCS, <203°F
Notice: All support system degradation direct utilizing AOP while continuing EXCEPT VCS fans
Requirements to actuate H2 Igniters
(Step 15)