Chapter 15 - Scheduling - Operations Management Lecture Notes

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
full-widthPodcast
1
Card Sorting

1/37

flashcard set

Earn XP

Description and Tags

These vocabulary flashcards cover standard scheduling concepts, various priority rules, performance measures, and management philosophies like OPT and TOC extracted from Chapter 15 of Operations Management Seventh Edition.

Last updated 4:28 AM on 8/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

38 Terms

1
New cards

Flow operations

Processes designed to handle high-volume, standard products within a system.

2
New cards

Routing

Provides information about the operations to be performed, their sequence, the work centers, and the time standards.

3
New cards

Job shop operations

Low-volume operations designed for flexibility, often involving customized products or services with higher margins.

4
New cards

Gantt Chart

A visual representation of a schedule over time, developed in the early 1900s by Henry Gantt.

5
New cards

Load chart

A type of Gantt chart that illustrates the workload relative to the capacity of a resource.

6
New cards

Progress chart

A type of Gantt chart that illustrates the planned schedule compared to actual performance.

7
New cards

Infinite loading

A loading method that ignores capacity constraints but helps identify bottlenecks in a proposed schedule to enable proactive management.

8
New cards

Finite loading

A loading method that allows only as much work to be assigned as can be done with available capacity.

9
New cards

Forward scheduling

A scheduling method that determines the earliest possible completion date for a job.

10
New cards

Backward scheduling

A scheduling method that starts with the due date for an order and works backward to determine the start date for each activity.

11
New cards

Due date

The specific time when a job is supposed to be finished.

12
New cards

Slack

The amount of time a job can be delayed and still be finished by its due date.

13
New cards

Input/output control

A capacity-control technique used to monitor work flow at individual work centers.

14
New cards

Operation sequencing

A short-term plan of actual jobs to be run in each work center based on available capacity and priorities.

15
New cards

Queue

A waiting line for jobs needing to be processed.

16
New cards

Priority rule

A rule used to determine the priority of jobs at a work center.

17
New cards

Local priority rule

A priority decision based on jobs currently at a specific work center.

18
New cards

Global priority rule

A priority decision based on information that includes the remaining work centers a job must pass through.

19
New cards

First come, first served (FCFS)

A priority rule where jobs are processed in the order in which they arrive at a machine or work center.

20
New cards

Last come, first served (LCFS)

A priority rule where the last job into the work center is processed first.

21
New cards

Earliest due date (EDD)

A priority rule where the job due the earliest has the highest priority.

22
New cards

Shortest processing time (SPT)

A priority rule where the job that requires the least processing time has the highest priority.

23
New cards

Longest processing time (LPT)

A priority rule where the job that requires the longest processing time has the highest priority.

24
New cards

Critical ratio (CR)

A priority rule where the highest priority is given to the job with the smallest ratio of time remaining until due dateprocessing time remaining\frac{\text{time remaining until due date}}{\text{processing time remaining}}.

25
New cards

Slack per remaining operations (S/RO)

A priority rule where highest priority goes to the job with the least slack per remaining operations, calculated as slackremaining operations\frac{\text{slack}}{\text{remaining operations}}.

26
New cards

Makespan

The time it takes to finish a batch of jobs, calculated as Completion time for final jobStart time for first job\text{Completion time for final job} - \text{Start time for first job}.

27
New cards

Job flow time

A measure of responsiveness calculated as Job completion timeTime the job was first available for processing\text{Job completion time} - \text{Time the job was first available for processing}.

28
New cards

Average number of jobs in system

A measure of responsiveness and work-in-process inventory calculated as job flow timesnumber of days to complete batch\frac{\sum \text{job flow times}}{\text{number of days to complete batch}}.

29
New cards

Job lateness

A measurement of whether a job is completed ahead of, on, or behind schedule.

30
New cards

Job tardiness

A measurement of how long after the due date a job was completed.

31
New cards

Mean Flow Time (MFT)

The average time jobs spend in the system, calculated as MFT=job flow timesnumber of jobs\text{MFT} = \frac{\sum \text{job flow times}}{\text{number of jobs}}.

32
New cards

Johnson’s Rule

A technique for minimizing makespan in a two-stage, unidirectional process.

33
New cards

Optimized production technology (OPT)

A scheduling and capacity planning system introduced by Eli Goldratt that focuses on bottlenecks.

34
New cards

Throughput

The quantity of finished goods to be sold.

35
New cards

Transfer batch

The quantity of items moved at the same time from one resource to the next.

36
New cards

Process batch

The quantity produced at a resource before switching to another product.

37
New cards

Theory of Constraints (TOC)

A managerial philosophy and extension of OPT suggesting that a system’s output is determined by its constraints.

38
New cards

Tibrewala, Philippe, and Brown technique

A technique for scheduling a seven-day operation giving each employee two consecutive days off.