Item 100
Clearing and Grubbing
Item 101
Removal of Structures and Obstructions
Item 102
Excavation
Item 103
Structure Excavation
Item 104
Embankment
Item 105
Subgrade Preparation
Item 106
Compaction Equipment and Density Control Strips
Item 107
Overhaul
Item 200
Aggregate Subbase Course
Item 201
Aggregate Base Course
Item 202
Crushed Aggregate Base Course
Item 203
Lime Stabilized Road Mix Base Course
Item 204
Portland Cement Stabilized Road Mix Base Course
Item 205
Asphalt Stabilized Road Mix Base
Item 206
Chemically Stabilized Road Mix Sub-base Course
Item 207
Portland Cement Treated Plant Mix Base Course
Item 208
Aggregate Stockpile
Item 300
Aggregate Surface Course
Item 301
Bituminous Prime Coat
Item 302
Bituminous Tack Coat
Item 303
Bituminous Seal Coat
Item 304
Bituminous Surface Treatment
Item 304A
Slurry System for Road Surface Treatment
Item 305
Bituminous Penetration Macadam Pavement
Item 306
Bituminous Road Mix Surface Course
Item 307
Bituminous Plant-Mix Surface Course General
Item 308
Bituminous Plant-Mix Surface Course, Cold Laid
Item 309
Bituminous Plant-Mix (Stockpile Maintenance Mixture)
Item 310
Bituminous Concrete Surface Course, Hot Laid
Item 311
Portland Cement Concrete Pavement
Item 313
Rock Asphalt, Hot Laid