What is Estimating?
Process of determining the expected quantities and cost of the materials, labor, and equipment for a construction project.
What is the Work or Scope of Work?
“The construction and services required by the contract documents…and includes all other labor, materials, equipment and services provided or to be provided by the contractor to fulfill the contractor’s obligations
What role does estimating play in the success of a construction company/
If bids are too low, company will lose money.
If bids are too high, company will lose work.
What are Wrong Quantities?
Waste Materials
Delay Construction
Increase Construction Costs
What is the roll of an Estimator?
Preparing cost estimates
Estimating the needed quantity of materials, labor, and equipment on the job.
Estimating the time, it will take to complete the job.
Who is an estiamtor?
Person with the job title of estimator
Anyone who orders materials, labor, or equipment.
What skills are required to be a good estimator?
Sound understanding of the construction methods, materials, and the capacities of skilled labor.
Ability to read blueprints.
Knowledge to determine the needed quantities for projects.
Strong mathematic skills.
Good communication skills, both verbally and in written form.
Strong computer skills
Detailed oriented
The confidence to quickly prepare takeoffs and make decisions under pressure.
A desire for constant improvement
What are 3 types of Estimates?
Conceptual
Preliminary
Final or Detailed
What is Conceptual Estimate?
Least accurate
Based on description of the project or very limited drawings
Used to study the feasibility of a project or comparison of design alternatives.
What is Preliminary Estimate?
Used to establish a budget.
Performed when drawings are partially complete (35% - 50%)
More accurate than conceptual estimate
What is Final or Detailed Estimate?
Most accurate, drawings are 100%
Used to prepare:
Bids
Change Orders
Order Materials
Establish a Budget
What role does the bid package play in estimating?
Estimates are prepared from bid packages
Bid package defines the scope of work for the construction project.
What is a Bid Package?
Invitation to bid
Bid Instructions
Bid Documents
Bonds Forms
Contract
General and Special Conditions
Technical Specifications
Other inclusions
Included by Reference
Addenda
What are some types of Bonds?
Bid Bond
Performance Bond
Payment Bond
What is a Bid Bond?
Guarantee if the contractor is awarded the bid.
What is a Performance Bond?
Guarantees the contractor will perform all work in accordance to the contract documents.
What is a Payment Bond?
Guarantees the contractor will pay its subcontractors and material suppliers.
What are some types of Insurance?
General Liability
Vehicles, personal property,
Worker’s Compensation
Covers employees injured or killed on jobsite
Builder’s Risk
Protects projects under construction
What are some types of Contract Awards?
Single Prime
Multiple Prime
Construction Management
Contract Agreements
Most are AIA Contracts
What is Single Prime Contract Awards?
General Contractor has a contract with Owner and Subcontractors
What is Multiple Prime Contract Awards?
General Contractor, Electrical Contractor, and Mechanical Contractor have a contract with Owner.
GC markup EC and MC
Comes in cheaper $
What is Construction Management Contract Awards?
CM has contract with Owner
CM has no-risk
Owner has all the contracts with the subcontractors.
CM is hired only for management
Construction Manager at Risk Contract Awards?
CM at risk has contract with Subcontractors and Owner
What are some types of Contracts?
Lump Sum
Unit Price
Cost-plus-fixed-fee
What is a Lump Sum Contract?
Contractor agrees to perform work for a specified amount.
1 big number and you build the project
What is a Unit Price Contract?
Based on quantities of work
Common in heavy construction (Civil and Road construction)
Still have to include travel, dumping, and leveling.
What is a Cost-Plus-Fixed-fee Contract?
Contractor is reimbursed for actual costs plus a fixed fee.
Could be 5-10%
Similar in CM at Risk Projects.
What are some Estimating Tools?
Architect’s & Engineer’s scale
Plan Measurer
Digitizer (don’t use)
Takeoff packages/software
Calculator & Paper forms
Quantity Survey Sheets
Spreadsheets
Estimating Software
Why do we use Spreadsheets for Estimating?
Inexpensive
Accessible
Easily adapted to the styles and estimating procedures of the company
Easily performs the mundane calculations.
Why do we use Estimating Packages for Estimating?
Automates many takeoff functions which decrease the time it takes to prepare an estimate.
Includes a Database
Can takeoff assembles
Takeoffs are easily manipulated and printed in different formats.
Chapter 2: The Estimating Process
What are the Stages of the Estimating Process?
Planning the bid
Pre-bid-day activities
Bid-day activities
Post-bid activities
5 Types of Sections to Plan
Civil
Archetural
Mechanical
Electrical
Structural
What happens while Planning the Bid?
Scope of Work
Scheduling the Bid
Assigning Tasks
What happens during Pre-Bid Day Activities?
Assigning Tasks
Order Bond
Request Subcontractor Quotes
Quantity Takeoff
Material, Labor, Equipment Pricing
Project Overhead
Prepare Bid Documents
What happens during Bid-Day Activities?
Material, Labor, and Equipment Pricing
Combine Pricing
Review Bid for Errors
Add Markups
Submit Bid
Request Subcontractor Quotes
Subcontractor Selection
Combine Pricing
Reviewed for Errors
Add Markups
Submit Bid
What happens during Post-Bid Activities?
Submitted
Review Bid
Project Buyout
Close-Out Audit