CM 230 Estimating 1

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/57

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 6:11 PM on 8/27/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

58 Terms

1
New cards

What is Estimating?

  • Process of determining the expected quantities and cost of the materials, labor, and equipment for a construction project.


2
New cards

What is the Work or Scope of Work?

  • “The construction and services required by the contract documents…and includes all other labor, materials, equipment and services provided or to be provided by the contractor to fulfill the contractor’s obligations


3
New cards

What role does estimating play in the success of a construction company/

  • If bids are too low, company will lose money.

  • If bids are too high, company will lose work.


4
New cards

What are Wrong Quantities?

  • Waste Materials

  • Delay Construction

  • Increase Construction Costs


5
New cards

What is the roll of an Estimator?

  • Preparing cost estimates

  • Estimating the needed quantity of materials, labor, and equipment on the job.

  • Estimating the time, it will take to complete the job.


6
New cards

Who is an estiamtor?

  • Person with the job title of estimator

    • Anyone who orders materials, labor, or equipment.


7
New cards

What skills are required to be a good estimator?

  • Sound understanding of the construction methods, materials, and the capacities of skilled labor.

  • Ability to read blueprints.

  • Knowledge to determine the needed quantities for projects.

  • Strong mathematic skills.

  • Good communication skills, both verbally and in written form.

  • Strong computer skills

  • Detailed oriented

  • The confidence to quickly prepare takeoffs and make decisions under pressure.

  • A desire for constant improvement


8
New cards

What are 3 types of Estimates?

  1. Conceptual

  2. Preliminary

  3. Final or Detailed


9
New cards

What is Conceptual Estimate?

  • Least accurate

  • Based on description of the project or very limited drawings

  • Used to study the feasibility of a project or comparison of design alternatives.


10
New cards

What is Preliminary Estimate?

  • Used to establish a budget.

  • Performed when drawings are partially complete (35% - 50%)

  • More accurate than conceptual estimate


11
New cards

What is Final or Detailed Estimate?

  • Most accurate, drawings are 100%

  • Used to prepare:

    • Bids

    • Change Orders

    • Order Materials

    • Establish a Budget


12
New cards

What role does the bid package play in estimating?

  • Estimates are prepared from bid packages

  • Bid package defines the scope of work for the construction project.


13
New cards

What is a Bid Package?

  • Invitation to bid

  • Bid Instructions

  • Bid Documents

  • Bonds Forms

  • Contract

  • General and Special Conditions

  • Technical Specifications

  • Other inclusions

  • Included by Reference

  • Addenda


14
New cards

What are some types of Bonds?

  1. Bid Bond

  2. Performance Bond

  3. Payment Bond


15
New cards

What is a Bid Bond?

  • Guarantee if the contractor is awarded the bid.


16
New cards

What is a Performance Bond?

  • Guarantees the contractor will perform all work in accordance to the contract documents.


17
New cards

What is a Payment Bond?

  • Guarantees the contractor will pay its subcontractors and material suppliers.


18
New cards

What are some types of Insurance?

  • General Liability

    • Vehicles, personal property,

  • Worker’s Compensation

    • Covers employees injured or killed on jobsite

  • Builder’s Risk

    • Protects projects under construction


19
New cards

What are some types of Contract Awards?

  • Single Prime

  • Multiple Prime

  • Construction Management

  • Contract Agreements

    • Most are AIA Contracts


20
New cards

What is Single Prime Contract Awards?

  • General Contractor has a contract with Owner and Subcontractors


21
New cards

What is Multiple Prime Contract Awards?

  • General Contractor, Electrical Contractor, and Mechanical Contractor have a contract with Owner.

  • GC markup EC and MC

  • Comes in cheaper $


22
New cards

What is Construction Management Contract Awards?

  • CM has contract with Owner

  • CM has no-risk

  • Owner has all the contracts with the subcontractors.

  • CM is hired only for management


23
New cards

Construction Manager at Risk Contract Awards?

  • CM at risk has contract with Subcontractors and Owner


24
New cards

What are some types of Contracts?

  • Lump Sum

  • Unit Price

  • Cost-plus-fixed-fee


25
New cards

What is a Lump Sum Contract?

  • Contractor agrees to perform work for a specified amount.

  • 1 big number and you build the project


26
New cards

What is a Unit Price Contract?

  • Based on quantities of work

  • Common in heavy construction (Civil and Road construction)

  • Still have to include travel, dumping, and leveling.


27
New cards

What is a Cost-Plus-Fixed-fee Contract?

  • Contractor is reimbursed for actual costs plus a fixed fee.

  • Could be 5-10%

  • Similar in CM at Risk Projects.


28
New cards

What are some Estimating Tools?

  • Architect’s & Engineer’s scale

  • Plan Measurer

  • Digitizer (don’t use)

  • Takeoff packages/software

  • Calculator & Paper forms

  • Quantity Survey Sheets

  • Spreadsheets

  • Estimating Software


29
New cards

Why do we use Spreadsheets for Estimating?

  • Inexpensive

  • Accessible

  • Easily adapted to the styles and estimating procedures of the company

  • Easily performs the mundane calculations.


30
New cards

Why do we use Estimating Packages for Estimating?

  • Automates many takeoff functions which decrease the time it takes to prepare an estimate.

  • Includes a Database

  • Can takeoff assembles

  • Takeoffs are easily manipulated and printed in different formats.


31
New cards

Chapter 2: The Estimating Process

32
New cards

What are the Stages of the Estimating Process?

  • Planning the bid

  • Pre-bid-day activities

  • Bid-day activities

  • Post-bid activities


33
New cards

5 Types of Sections to Plan

  1. Civil

  2. Archetural

  3. Mechanical

  4. Electrical

  5. Structural


34
New cards

What happens while Planning the Bid?

  • Scope of Work

  • Scheduling the Bid

  • Assigning Tasks


35
New cards

What happens during Pre-Bid Day Activities?

  • Assigning Tasks

    • Order Bond

    • Request Subcontractor Quotes

    • Quantity Takeoff

      • Material, Labor, Equipment Pricing

    • Project Overhead

    • Prepare Bid Documents


36
New cards

What happens during Bid-Day Activities?

  • Material, Labor, and Equipment Pricing

    • Combine Pricing

      • Review Bid for Errors

        • Add Markups

          • Submit Bid

  • Request Subcontractor Quotes

    • Subcontractor Selection

      • Combine Pricing

        • Reviewed for Errors

          • Add Markups

            • Submit Bid


37
New cards

What happens during Post-Bid Activities?

  • Submitted

    • Review Bid

      • Project Buyout

        • Close-Out Audit


38
New cards
39
New cards
40
New cards
41
New cards
42
New cards
43
New cards
44
New cards
45
New cards
46
New cards
47
New cards
48
New cards
49
New cards
50
New cards
51
New cards
52
New cards
53
New cards
54
New cards
55
New cards
56
New cards
57
New cards
58
New cards