cia3250 ch7

0.0(0)
studied byStudied by 0 people
GameKnowt Play
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/69

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

70 Terms

1
New cards

Risk mitigation involves the reduction in either the likelihood or the impact of the occurrence of a risk. T/F

True

2
New cards

In the context of Capability Maturity Model Integration, process is ad hoc and chaotic; organization tends to overcommit and processes are often abandoned during times of crisis in which of the following maturity levels?

3
New cards
4
New cards

quantitatively managed

5
New cards

managed

6
New cards

defined

7
New cards

initial

initial

8
New cards

After an organization decides to adopt which of the following, it must conduct an assessment of its software development practices to determine where they fit in the capability model?

9
New cards
10
New cards

QA

11
New cards

software development methodology

12
New cards

software quality management

13
New cards

CMMI-DEV

CMMI-DEV

14
New cards

A type of business system which is used to develop accurate forecasts of customer demand, recommend stocks and bonds for an investment portfolio is known as which of the following?

15
New cards
16
New cards

upgrade management system

17
New cards

decision support system

18
New cards

executive information system

19
New cards

data information system

decision support system

20
New cards

Capability Maturity Model Integration (CMMI) is a process improvement approach that defines the essential elements of effective processes. T/F

True

21
New cards

A primary cause of poor software quality is that developers do not know how to design quality into software from the very start, or do not take the time to do so. T/F

True

22
New cards

In the context of developing safety-critical systems, the safety engineer's role is limited to producing a hazard log. T/F

False

23
New cards

An airline's online ticket-reservation system and an electronic funds transfer system that moves money among banks, are examples of which of the following?

24
New cards
25
New cards

order-processing systems

26
New cards

decision support systems

27
New cards

software development systems

28
New cards

quality assurance systems

order-processing systems

29
New cards

An important technique used to develop ISO 9001-compliant quality systems by both evaluating reliability and determining the effects of system and equipment failures is which of the following?

30
New cards
31
New cards

DO-178B/EUROCCAE ED-128

32
New cards

N-version programming

33
New cards

Failure mode and effects analysis (FMEA)

34
New cards

Capability Maturity Model Integration (CMMI)

Failure mode and effects analysis (FMEA)

35
New cards

Under the doctrine of supervening event, the original seller is not liable if the software was materially altered after it left the seller's possession and the alteration caused the injury. T/F

True

36
New cards

Black-box testing treats the software unit as a device that has expected input and output behaviors but whose internal workings are known. T/F

False

37
New cards

Software product liability claims are typically based on strict liability, negligence, breach of warranty, or misrepresentation. T/F

True

38
New cards

A failure mode describes how a product or process could fail to perform the desired functions described by the customer. T/F

True

39
New cards

In integration testing, special software programs called static analyzers are run against the new code. T/F

False

40
New cards

Which of the following is an approach to minimizing the impact of software errors by independently implementing the same set of user requirements N times, where N could be 2, 3, 4, or more?

41
New cards
42
New cards

Acceptance programming

43
New cards

Risk management programming

44
New cards

N-version programming

45
New cards

Avoidance programming

N-version programming

46
New cards

When forced to choose between adding more user features and doing more testing, most software companies decide in favor of more testing. T/F

False

47
New cards

The safety engineer uses a logging and monitoring system to track which of the following?

48
New cards
49
New cards

standards

50
New cards

objectives

51
New cards

hazards

52
New cards

deliverables

hazards

53
New cards

A complex system used in IT is a redundant array of independent disks (RAID), which is commonly used in which type of file servers?

54
New cards
55
New cards

high-volume data storage

56
New cards

low-volume data storage

57
New cards

unpredictable-volume data storage

58
New cards

irregular-volume data storage

high-volume data storage

59
New cards

When sued for which of the following, a software supplier is not held responsible for every product defect that causes customer or third-party loss?

60
New cards
61
New cards

breach of warranty

62
New cards

misrepresentation

63
New cards

strict liability

64
New cards

negligence

negligence

65
New cards

Software quality is defined as the degree to which a software product meets:

66
New cards
67
New cards

the needs of its users.

68
New cards

the standards of its competitors.

69
New cards

sustainability and environmental protection needs.

70
New cards

the minimum financial return standards.

the needs of its users.