ACCT 308 quiz 1

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/17

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:07 PM on 9/1/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

18 Terms

1
New cards

cost object

anything for which managers want to know the cos

2
New cards

direct costs are

traced

3
New cards

indirect costs are

allocated

4
New cards

cost tracing

based on actual costs

5
New cards

cost allocation

based on estimated costs

6
New cards

variables cots ___ in total, ____ per unit

change, stay constant

7
New cards

fixed costs ____ in total, _____ per unit

stay constant, change per unit

8
New cards

total cost equation

total cost = fixed costs + (variable cost per unit x number of units)

9
New cards

product costs

manufactoring costs, costs to make the product

10
New cards

period costs

non-manufacturing costs, operating expenses

11
New cards

manufacturing overhead

costs other than direct materials and direct labor necessary to manufature a prodcut

12
New cards

total manufacturing costs =

DM + DL + OH

13
New cards

total costs =

manufacturing costs + non-manufacturing costs

14
New cards

total costs =

indirect costs + direct costs

15
New cards

prime costs =

DM + DL

16
New cards

conversion costs =

DL + OH

17
New cards

total costs =

variable costs + fixed costs

18
New cards

total costs =

product costs + period costs