1/15
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Find a current copy of the NEC in your department.
- On Hobbs desk
Explain what an "AHJ" is.
- Authority having jurisdiction
Identify the required working clearances around electrical panels.
- 480v no grounded surfaces 3ft.
- 480v a wall 3.5ft
- 480v 2 MCC across from each other 4ft.
- Height – from floor to structural ceiling or 6ft above equipment.
Identify three or more clearance violations In the department.
Identify the dedicated equipment space requirements above and around electrical panels.
- Above 6ft or the structureal ceiling.
- 30in. width from the hinge.
- Door must open 90*
- Nothing can pertrude greater than 6in.
Identify two or more dedicated equipment space violations in the department.
Identify or find In the NEC the section that discusses motors, O/L protection, and O/L sizing.
- 430
Find in the NEC the section that discusses transformers, O/L protection,and bonding.
- 450
Identify the section of the NEC which discusses grounding.
- 250
Identify the section of the NEC which discusses overcurrent protection.
- 240
Demonstrate the proper way to terminate a three phase motor.
Demonstrate the safe and proper use of a fiberglass fishtape.
- Make sure that all wires are de-energized.
Identify the various types of rigid metallic conduit fittings.
- Elbows, capped elbows, bushings, expansion fittings, coupling, 3-piece coupling, T-coupling.
Identify the temperature and voltage rating for a THHN conductor.
- 90*c Dry / 75*c Wet and 600v – look for markings on the jacket of the wire.
Explain the purpose behind each different wire insulation colors.
- White / gray / blue&white à neutral
- Green&yellow / green / bare à Ground
- Orange à External source
- Black à current carrying conductor
Identify the instances under which a temporary installation is permitted.
- You would fill one out if you had contractors bringing there own equipment.
- Short term – 3 days
Long term – 3 days à 6 months