ARCC- AD FROM PPTs

0.0(0)
studied byStudied by 29 people
0.0(0)
full-widthCall with Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/143

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No study sessions yet.

144 Terms

1
New cards

false

true or false

The Architectural Design Process is a one size fits all process, every project follows the process exactly

2
New cards

Pre design

what architectural design process where the client selects an architect and the architect produces a design program

3
New cards

design program

a brief detailing the clients expectations and or needs for the work commissioned. it also includes the design requirements

4
New cards

Schematic design

what architectural design process where we search for an essential organizing principle, an idea that will suggest the overall arrangement and form of spaces

5
New cards

true

true/ false

Drawings at the schematic design phase

must be detailed enough to calculate a

rough estimate of its construction cost.

6
New cards

design development

what architectural design process where cost estimate is prepared, project schedule is reviewed, and what is produced in this phase is presented to the client for review and approval

7
New cards

contract documents

what architectural design process produces working drawings and specifications

8
New cards

bidding and negotiation

what architectural design process helps the client get the best or lowest deal

9
New cards

construction administration

what architectural design process where portions of the documents l be used by each of the many subtrades that carry out specific parts of the work

10
New cards

supplemental services

what architectural design process where other services stipulated in the contract within the services of the architect are presented

11
New cards

minimum=largest, maximum=smallest

what do you do in case of conflicting provisions with other code references

12
New cards

2.7m

what is the minimum ceiling height for a naturally ventilated floor

13
New cards

2.7m

minimum ceiling height for an artificially ventilated floor, 1st flr

14
New cards

2.4m

minimum ceiling height for an artificially ventilated floor, 2nd flr

15
New cards

2.1m

minimum ceiling height for an artificially ventilated floor, 3rd flr

16
New cards

1.8m

MINIMUM CEILING HEIGHT FOR MEZZANINE

17
New cards

6ss1m, 2m one side

minimum room size and area for human habitation

18
New cards

3sqm, 1.5m one side

minimum kitchen area

19
New cards

1.2sqm, 0.9m one side

minimum area of toilet and bath

20
New cards

10% of floor area, not less than 1sqm

for a room without artificial ventilation what is the minimum window opening

21
New cards

5% of floor area, not less than 240sqmm

window opening for toilets, bathroom, laundry room

22
New cards

750mm from side or rear property line

depth of eaves, canopies, awnings

23
New cards

.82x1m

what is the minimum dimension of windows for emergency egress

24
New cards

<0.82m

how far should the window for emergency egress be from the floor

25
New cards

0.90M

door opening as per the NBCP

26
New cards

0.71M

door opening as per fire code

27
New cards

1.2m

door leaf width as per nbcp

28
New cards

1.22m

door leaf width as per fire code

29
New cards

2

number of exits required as per fire code

30
New cards

60m nbcp, 61m fire code

max distance to exits as per nbcp and fire code with sprinkler

31
New cards

45m nbcp, 46m fire code

max distance to exits as per nbcp and fire code without sprinkler

32
New cards

1.12/1.1m

minimum corridor width

33
New cards

6m

max length of corridor with dead end

34
New cards

false, width of stairs should be equal with landing

true or false

if my stair width is 1.2m, my landing can be measured 1m

35
New cards

>100mm

for stairs and landing it should not be reduced in width by ______________ by a door when fully open

36
New cards

3.6m

maximum vertical distance between landings

37
New cards

2m

minimum headroom clearance for stairs

38
New cards

false

true or false:

i can consider that my site has a parking if there is a vacant lot beside me that is not part of my site or on the street

39
New cards

2.5x5m

parking slot dimension for diagonal and perpendicular

40
New cards

2.15x6m

parking slot dimension for parallel parking

41
New cards

3x9m

parking slot dimension for jeepney/ shuttle

42
New cards

3.6x12m

parking slot dimension for trucks or bus

43
New cards

3.6x18m

parking slot dimension for articulated trucks

44
New cards

2m

windows or balconies facing a neighbors property should be setbacked how many meters

45
New cards

1/3 of setback

maximum building projection

46
New cards

development controls

a set of interacting regulations concerning the physical utilization of a lot and governing the planning and design of spaces and or the use or occupancy of a building to be introduced

47
New cards

total lot area

the surface area of a property on which a building is proposed to be built

48
New cards

setback

horizontal distance measured 90 deg from the property line to the outermost face of the building

49
New cards

yard

area of required open space within a lot that is essential to allow light and ventilation in the building

50
New cards

Percentage of Site Occupancy

the percentage of the maximum allowable enclosed floor area of any building in relation to the TLA

51
New cards

AMBF/TLA

pso=________ /__________

52
New cards

ALLOWABLE MAXIMUM BUILDING FOOTPRINT

The maximum portion of the lot which may be occupied by the building at grade level after satisfying setback, yard, and court requirements

53
New cards

PSO x TLA or TLA-Area of yard

AMBF formula

54
New cards

Gross Floor Area

the total floor space within the perimeter of the permanent external walls of the building

55
New cards

TLA x FLAR

formula for GFA

56
New cards

Floor to Lot Area Ratio

the ratio between the GFA of a building and the TLA of the lot on which it stands

57
New cards

total gross floor area

the total floor space within the main and auxiliary buildings and all other enclosed support areas, together with all other usable horizontal areas/ surfaces above

58
New cards

TOTAL OPEN SPACE WITHIN LOT

the total open space required for each type of use or occupancy for a given lot expressed as percentage of the TLA

59
New cards

IMPERVIOUS AND UNPAVED SURFACE AREA

2 types of TOSL

60
New cards

IMPERVIOUS SURFACE AREA

the percentage of the maximum allowable floor area of any paved, tiled, or hardscape surface at the grade level outside the building inn relation to the TLA

61
New cards

UNPAVED SURFACE AREA

the portion of the lot reserved for plants and softscapes

62
New cards

maximum allowable construction area

area within the lot that can be paved, regardless of whether it is enclosed by a wall or not

63
New cards

condominium

what do you call an apartment with facilities

64
New cards

10%

how many percent of total accessible units should a single detached and duplex have

65
New cards

1 accessible unit per 26-50 units, plus 1 per 100 thereafter

accessible unit for school/ company, multiple dwelling units, high rise condo building according to bp344

66
New cards

ingress level

accessible units should be located where according to bp344

67
New cards

not allowed, abutment only

firewall size for an R1 zoning

68
New cards

80% of 1 side only

max length of firewall for R2

69
New cards

85% of each 2 sides, total must not exceed 65% of total lot perimeter

max length of firewall for R3

70
New cards

10m, 1.5

bhl and flar of r1

71
New cards

10m, 1.3-1.5

bhl and flar of basic r2

72
New cards

15m, 2.1-3

bhl and flar of max r2

73
New cards

10m, 1.8-2.1

bhl and flar of basic r3

74
New cards

36m, 7.1-8.1

bhl and flar of max r3

75
New cards

10m, 1.6-1.8

bhl and flar of r4

76
New cards

36-54m, 6-9

bhl and flar of r5

77
New cards

total area of sides and rear yards

where do you base the impervious surface area for an R1 zoning

78
New cards

15

hotels are buildings or group of buildings under the same management in which there are more than _____ sleeping accommodations for hire

79
New cards

lodging/ rooming house

what do you call a building or group of buildings in which separate sleeping rooms are rented providing sleeping accommodation for 15 people or fewer

80
New cards

1 accessible unit per 50units up to 150 units, plus 1 per 100 thereafter

for hotels how many accessible units should you have according to bp344

81
New cards

1 star

PH DOT- Star grading system

budget, limited facilities

82
New cards

2 star

PH DOT- Star grading system

more than basic accommodation

83
New cards

3 star

PH DOT- Star grading system

good level of accommodation

84
New cards

4 star

PH DOT- Star grading system

upscale in all areas

85
New cards

5 star

PH DOT- Star grading system

luxury and sophistication

86
New cards

front of the house, back of the house

general categories of space in a hoitel

87
New cards

apartelle

has several independent, furnished or semi furnished apartments, regularly leased to tourists and travellers for dwelling on a longer term basis

88
New cards

25

how many uinits should an apartelle have

89
New cards

pension house

It is a private or family-operated tourist boarding house, tourist guest house, or tourist lodging house employing non-professional domestic helpers regularly catering to tourists and travelers, containing several independent lettable rooms, providing common facilities such as toilets, bathrooms/showers, living and dining rooms and/or kitchen and where a combination of board and lodging may be provided.

90
New cards

5m

recommended setback for educational facilities from the street to reduce noise

91
New cards

10000

minimum lot area for rural elementary school

92
New cards

15000

minimum lot area for rural secondary school

93
New cards

5000

minimum lot area for urban elementary school

94
New cards

6000

minimum lot area for urban secondary school

95
New cards

7x9m

minimum classroom size according to DepEd

96
New cards

400sqm

minimum area of library in a school

97
New cards

up to 70% of the total perimeter of the property (except residential)

Under Section 704 of the NBCP, what is

the maximum length of firewall that can be

built, provided that the subject building

complies with the requirements stipulated?

98
New cards

1 every 10 classroom

public school minimum parking slot required

99
New cards

1 every 5 classrooms, 1 bus for every 100 students

private school minimum parking slot required

100
New cards

1 loading bay for 2 queued jeep slot

jeep loading bay requirement for both public and private school