Data processing part 3

studied byStudied by 0 people
0.0(0)
learn
LearnA personalized and smart learning plan
exam
Practice TestTake a test on your terms and definitions
spaced repetition
Spaced RepetitionScientifically backed study method
heart puzzle
Matching GameHow quick can you match all your cards?
flashcards
FlashcardsStudy terms and definitions

1 / 5

encourage image

There's no tags or description

Looks like no one added any tags here yet for you.

6 Terms

1
    • Redundant data processing servers

    • Redundant Network Equipment;

    • Controller Working Positions (CWP);

    • External interface equipment.

  1. Design and implementation principles

New cards
2

Controller Working Positions (CWP)

the display and user interaction with the system, equipped with display monitors and peripherals.

New cards
3

COTS(Commercial-off-the-Shelf) or Hardware Configuration Items(HWCI)

refers to software or hardware products that are readily available in the commercial market and are designed for general use rather than being specifically developed for a particular organization or industry.

New cards
4
  1. * Network Equipment

    • Servers

    • Workstations & Associated Hardware Components

    • Timing Device

    • Electrical Device

  2. * Cisco 2821 Route

    • Cisco 2911 Router

    • Intel PRO 1000 MT Dual Port Server Adapter

    • Cisco 2960 & 3750 Switch

  3. * HP Proliant DL360 G8

    • HP Proliant DL380 G7

  4. Barco ISIS

    • 2048x2048 resolution

    • 28” LCD display

    • DVI input

    • Widest viewing angles (up to 178°)

  5. pLINES E4

  6. LEDI 2/S Console Clock

    • Hour, minute and second

    • 7 segments LED display

    • Legible up to 7 meters

    • Manual adjust luminosity

  7. Automatic Transfer Switch (ATS-1000)

    • Used for enabling the use of redundant power sources

    • Loss of power - switch load over to the backup power in less than 20ms

    • Restoration of primary power - switch back in less than 20ms

    • Fitted to each rack/cabinet for and Console in new ATMC building

Hardware Configuration Items

  1. Hardware Configuration Items(HWCI)(5)

  2. Network Equipment Ex. (4)

  3. Server Ex. (2)

  4. Workstation

  5. External Interface Equipment

  6. Timing Device

  7. Electrical Device

New cards
5
  1. Layer 1

  2. Layer 2

  3. Layer 3

  4. Operational Display Suite(ODS)

  5. HP Z400 workstation

  1. ● Executive Control (EC),

    ● Planner Control(PLC),

    ● FSS(Flight Service Station),

    ● AMS(Aeronautical Mobile Service) controller positions

  2. support position

  3. technical monitoring positions(TKSUP)

  4. Watch supervisor positions

  5. Computer Based Training (CBT) positions

  6. Search and Planning System (SPS) positions

  7. Airspace Design and Evaluation Workstation (ADEW)

  8. Airspace Design and Evaluation (ADEW) Network Address Storage (NAS)

  9. Tower (TWR-EC) operations on the TopSky ATC

HWCI Description

  1. redundant hardware used for the operational network

  2. redundant physical cable connection between each system and a minimum of two operational switches A and B.

  3. redundant path connections to multiple gateways ensuring access to external sources.

  4. HWCI that requires human machine interface peripherals such as keyboard, mouse, monitor and printer.

  5. What workstation used for ODS?

  1. ODS1

  2. ODS2

  3. ODS3

  4. ODS4

  5. ODS5

  6. ODS6

  7. ODS7

  8. ODS8

  9. ODS9

New cards
6
  1. Data Processing Suite(DPS)

  2. HP ProLiant DL380G7

  3. 3

  4. MAIN_IO LAN or Surveillance LAN

  5. Thalix

  1. _____ HWCI that does not involve human interface components (accessed only through ssh, rsh | remote only).

  2. These are the _____ server is used for:

  3. ____ dual port network interfaces for connection to Operational and Service LAN switches

  4. Connection to external interfaces via _________

  5. The Operating System is Thalix

New cards
robot