Four aspects of facility predesign phase
Needs analysis, feasibility study, master plan, hire and architect
Two aspects of facility design phase
Finalize committee and create blueprint
Three phases of construction phase
Follow master plan, check construction progress, arrange equipment
Four phases of facility pre-operation phase
Hire staff, assign duties, create cleaning schedule, create plan for opening
Four phases of new facility design
Predesign, design, construction, and preoperation
During which phase of the facility design process is the blueprint produced?
Design
Considerations and requirements when opening a facility
Number of athletes, coaches’ philosophies, athletes’ ages and training experience, athletes’ schedules, and equipment available
What is the minimum recommended amount of space per athlete for a S&C facility?
100 sq feet per participant
Recommended ceiling gym ceiling height
12-14 feet
Minimum distance of mirrors away from equipment
6 inches
Minimum distance of mirrors above the floor
20 inches
Minimum space between barbells and dumbbells
36 inches
Minimum distance between circuit training machines
24-36 inches
What is the order of the four phases involved in designing a new S&C facility?
Predesign, design, construction, preoperation
The operational plan should be created in which of the following phases?
Predesign
What is the recommended minimum distance between the floor and the bottom of mirrors on the wall?
20 inches
Which of the following is NOT a key consideration when determining the space requirements of a college S&C facility?
Number of teams desiring to use the facility
What is the minimum recommended space between the end of racks to provide room for spotters?
3 feet