Airport Operations

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/72

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:54 PM on 9/21/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

73 Terms

1
New cards
Three major components of the air transport system
The airport (including concessionaires, tenants, partners, and airways control system), the airline, and the user
2
New cards
Airport Operator (associated organizations)
Local authorities/municipalities, central government, concessionaries, suppliers, utilities, police, fire service, ambulance/medical services, air traffic control, and meteorology
3
New cards
Nonusers (of the airport)
Airport neighbor organizations, local community groups, chambers of commerce, environmental activist groups, anti-noise groups, and neighborhood residents
4
New cards
National Plan of Integrated Airport Systems (NPIAS)
US plan making publicly owned airports eligible for federal aid in constructing most facilities, other than those related to commercial activities
5
New cards
US Airport Ownership
Ownership of large and medium-sized airports is almost entirely in the hands of local communities
6
New cards
Washington D.C. area airports
Two large airports operated directly by the federal government, but since June 1987 operated by the Metropolitan Washington Airports Authority
7
New cards
Gateway International Airport (UK category)
Supports a wide range of international and intercontinental services
8
New cards
Regional Airports (UK category)
Provide short-haul international and domestic services
9
New cards
Local Airports (UK category)
Provide third-level services (scheduled passenger service with aircraft under 25 seats)
10
New cards
BAA plc
Company formed in 1987 when Britain privatized publicly owned airports under the British Airports Authority (including Heathrow and Gatwick), floated on the London stock market
11
New cards
BAA plc ownership change
Bought by Spanish company Grupo Ferrovial in July 2006, renamed BAA Airports Ltd, and ceased trading on the London Stock Exchange
12
New cards
Airside vs. Landside
The customary division of an airport's operations
13
New cards
Change of Mode (terminal function)
Provides linkage between air and ground vehicles
14
New cards
Processing (terminal function)
Provides the necessary facilities for ticketing, documentation, and control of passengers and freight
15
New cards
Change of Movement Type (terminal function)
Converts continual shipments of freight by trucks and departing passengers by car, bus, taxi, and train into aircraft-sized batches
16
New cards
Centralized Terminal System
Processing carried out in the main terminal building, with access to gates via piers, satellites, or apron transport; allows management to work closely with staff and requires less security staff
17
New cards
Decentralized Terminal System
Processing carried out in separate terminal buildings; keeps terminals on a human scale with short walking distances, but can require higher staffing since some administration/security functions must be duplicated per terminal
18
New cards
IATA recommended maximum walking distance
984 ft between curbside and the farthest gate area, developed to overcome unsatisfactory walking distances in decentralized designs
19
New cards
IATA recommended max curbside-to-check-in distance
328 ft between curbside and the farthest check-in counter
20
New cards
Examples of nonaeronautical airport activities
Food and beverage sales, duty-free shopping, car rentals, car parking, advertising, hotels/motels, and casinos/gaming machines
21
New cards
Disincentives to airport nonaeronautical revenue development
Income going directly to the national treasury, government giving duty-free franchise to a government-owned airline, or airport operating on a residual cost basis where nonaeronautical income reduces landing fees rather than benefiting the airport
22
New cards
Airport demand variation types
Annual variation, monthly peaks within a year, daily peaks within a month/week, and hourly peaks within a day
23
New cards
Standard Busy Rate (SBR)
A design standard used in the UK and Europe (notably by the former British Airports Authority), defined as the 13th highest hour of passenger flow, surpassed by only 29 hours of operation at higher flows
24
New cards
Busy-Hour Rate (BHR)
Also called the 5% busy hour; the hourly rate above which 5% of an airport's traffic is handled, meant to overcome SBR's inconsistent congestion levels across airports
25
New cards
Typical Peak-Hour Passengers
FAA measurement defined as the peak hour of the average peak day of the peak month; approximates closely to SBR
26
New cards
Busiest Timetable Hour (BTH)
A simple method for small airports with limited databases, calculated using average load factors and existing or projected timetables
27
New cards
Peak Profile Hour (PPH)
Method where the peak month is selected, then average hourly volume is computed for each hour across the month using its actual length
28
New cards
Factors affecting the nature of peaks
Domestic/international ratio, charter/LCC vs. scheduled ratio, long-haul/short-haul mix, geographic location, and nature of the catchment area
29
New cards
Why peak-hour demand affects airport infrastructure
Because during off-peak periods, aircraft operate at lower load factors than during attractive peak-hour slots, so infrastructure must be sized for the peak
30
New cards
Utilization and Load Factors (scheduling constraint)
Aircraft are expensive equipment that can only earn revenue when flying, creating pressure to maximize utilization
31
New cards
Reliability (scheduling constraint)
Utilization can be maximized, but is subject to the double constraints of load factors and punctuality
32
New cards
Long-Haul Scheduling Windows
Schedules must account for departure and arrival times at origin, enroute, and destination airports
33
New cards
Airport (Runway) Slots
Runway takeoff and landing capacity, which is limited due to necessary safety margins in separating arriving and departing aircraft
34
New cards
Declared Capacity
The limit authorities often place on the number of passengers that can pass through a terminal during a half-hour period
35
New cards
Long-Haul Crewing Constraints
Crews on long-haul flights are changed at slip airports, requiring timing to ensure fresh crews are available to relieve incoming flights
36
New cards
Short-Haul Convenience
Because short-haul flights often carry business travelers, departure/arrival times are critical, and flights lacking a suitable one-day return are hard to market
37
New cards
Aircraft Availability (scheduling factor)
Determined by A-, B-, C-checks, geographic location, number of operational cycles/hours, and style of operation
38
New cards
Obstacle-Limitation-Surface (OLS)
Criteria used to specify and derive declared distances, part of the airport approach
39
New cards
Operational Empty Weight (OEW)
The basic aircraft, with a nominal cabin configuration, without fuel or payload; usually includes the nominal mass of flight and cabin crew
40
New cards
Aircraft-Prepared-for-Service (APS) mass
A mass reported by manufacturers in addition to OEW; greater than OEW because it adds cabin variations and consumable allowance
41
New cards
Tankering
The practice of loading extra fuel to conduct an outward and return flight, or to minimize fuel pickup at an airport where fuel is expensive
42
New cards
Fuel load criteria
The requested fuel load must not cause the aircraft to exceed its maximum takeoff weight (MTOW) with estimated payload, nor exceed the aircraft's declared fuel capacity
43
New cards
Maximum Takeoff Weight (MTOW)
The weight limit that must not be exceeded, though an aircraft may depart the stand with a designated taxiing fuel load allowing a small additional weight increase
44
New cards
Regulated/Restricted Takeoff Weight (RTOW)
A reduction in allowable takeoff weight caused by runway limitations, which reduces the payload-range attainable from the airport
45
New cards
Aircraft Characteristics for Airport Planning (ACAP)
Publications produced in a format agreed upon among manufacturers, available from manufacturer websites or on request
46
New cards
Gross Performance
Aircraft performance as demonstrated for aircraft certification
47
New cards
Takeoff Run Required (TORR)
The net performance-assessed distance the aircraft might need to travel while still in contact with the ground
48
New cards
Takeoff Distance Required (TODR)
The net performance measurement to reach a screen height, measured from the point takeoff run commences
49
New cards
Accelerate-Stop Distance Required (ASDR)
The distance required to accelerate to V1 with all engines at takeoff power, experience an engine failure at V1, abort takeoff, and stop using only braking (no reverse thrust)
50
New cards
Landing Distance Required (LDR)
Measured from the runway threshold, including distance to the touchdown point and the landing run itself
51
New cards
NOTAMs
Notice to Airmen; the means by which an airport notifies changes to declared distances caused by work in progress, accidents, etc.
52
New cards
TODR determination
The greater of either the factored distance to the screen with all engines, or the unfactored distance with an engine out
53
New cards
First Segment (departure performance)
Critical engine inoperative, remaining engines at takeoff thrust, landing gear extended, flaps in takeoff position, aircraft at minimum safety speed
54
New cards
Second Segment (departure performance)
Same as first segment, but with gear retracted, speed increased by 20%, proceeding to an altitude of 400 feet
55
New cards
Third Segment (departure performance)
Maintaining level altitude, retracting flaps/slats, increasing speed a further 5%, engine power reduced to maximum continuous thrust
56
New cards
Final Segment (departure performance)
Maintaining the configuration at the end of the third segment, climbing to an altitude of 1,500 feet
57
New cards
Airport "Readiness" State
The availability of operational facilities (runways, instrument-approach aids, lighting, fire/rescue services, mechanical/electrical systems, people movers, baggage-handling systems, air bridges) appropriate to the airlines and aircraft using the airport
58
New cards
Aerodrome Certificate
ICAO term requiring all Member States to put in place a system for certifying airports with international commercial service
59
New cards
ICAO Manual on Certification of Aerodromes
Lists the obligations of airport operators and provides a guide on documenting compliance via an approved certification manual
60
New cards
US Airport Certification Requirement
Certification is compulsory for airports used by scheduled and charter air carriers, set out in Part 139 of the Code of Federal Regulations (CFR)
61
New cards
Operating Constraints (mainly weather)
Include VFR/IFR conditions and which runways have instrument vs. non-instrument approaches
62
New cards
Runway Visual Range (RVR)
The distance over which a pilot on the runway centerline can see the runway surface markings or the lights delineating the runway or its centerline
63
New cards
Passenger Terminal Functions
The processing of passengers and baggage, provision for the requirement of a change of movement type, and facilitating a change of mode.
64
New cards
High-Activity Centers
Facilities such as airport terminals that have a high throughput of users.
65
New cards
Terminal Functions Categories
Direct passenger services, airline-related passenger services, governmental activities, non-passenger-related airport authority functions, and airline functions.
66
New cards
Airport-Dominant Management
Where terminal operations are airport-dominant, the airport authority itself provides the staff to run terminal services.
67
New cards
Direct Passenger Services
Terminal operations provided for the convenience of air travelers that are not directly related to the operations of the airlines.
68
New cards
Airline-Related Passenger Services
Operations handled entirely by airlines or their agents, such as reservations, check-in, baggage handling, and CIP facilities.
69
New cards
Flight Dispatch Activities
Flight planning, aircraft weight and balance, flight-crew briefing, and flight watch.
70
New cards
Flight Planning
Determining how long an individual flight will take and how much fuel will be required.
71
New cards
Flight-Crew Briefing
Providing appropriate advice and information to assist the crew in the safe conduct of a flight.
72
New cards
Flight Watch (Flight Control)
Monitoring the progress of individual flights by flight dispatch/flight operations personnel.
73
New cards
Governmental Controls
Customs, immigration, health, and agricultural produce.