SCMT 364 ch.7 manufacturing processes

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/33

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 6:15 PM on 8/24/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

34 Terms

1
New cards

are used to make any manufactured item at some level

production processes

-source: the parts

-make: the product

-deliver: the product

2
New cards

the time needed to respond to a customer order

lead time

3
New cards

where inventory is positioned to allow entities in the supply chain to operate independently

customer order decoupling points (upside down triangle) inventory

4
New cards

a means of achieving high levels of customer service with minimal inventory investment

lean manufacturing

5
New cards

serve customers from finished goods inventory; high demand

Make to stock MTS

6
New cards

combine a number of preassembled modules to meet a customer's specifications; low demand

Assemble to order ATO

7
New cards

make the customer's product from raw materials, parts, and components; low demand

make to order MTO

8
New cards

work with the customer to design and then make the product; low demand

Engineer to order ETO

9
New cards

MTS: examples of products include the following:

-televisions

-most furniture products

-packaged food products

(finished goods)

10
New cards

MTS: essential issue in satisfying customers-meeting demand- is to...

balance the level of inventory agains the level of customer service

-easy with unlimited inventory, but inventory costs money

-trade-off between the costs of inventory and level of customer service must be made

11
New cards

MTS: use__ to achieve higher service levels for a given inventory investment

lean manufacturing

12
New cards

ATO: a primary task is to define a customer's order in terms of...

alternative components because these are carried in inventory

-an example is the way HP and Dell make their desktop computers

13
New cards

ATO: one capability required is a...

design that enables as much flexibility as possible in combining components

-toyota uses a base frame that accepts various components

14
New cards

ATO: there are significant advantages from moving the customer order decoupling point from finished goods to...

components

-this is often called postponement or delayed differentiation (bananas at HEB)

15
New cards

MTO and ETO (customer has a voice in the design phase): boeing's process for making ...

commercial aircraft is an example of MTO (perhaps even elements of ETO)

16
New cards

MTO and ETO: customer order decoupling point could be...

in ether raw materials at the manufactuing site or the supplier inventory

-depending on how similar the products are, it might not even be possible to preorder parts. ETO?materials customers has to tell them

17
New cards

the product remains in a fixed location and manufacturing equipment is moved to the product; very large; MTO and ETO

project

18
New cards

most common production processes

work center (job shop) and manufacturing cell

19
New cards

similar equipment or functions are grouped together

Workcenter(job shop)

20
New cards

a dedicated area where products that are similar in processing requirements are produced

manufacturing cell

21
New cards

work processes are arranged according to the progressive steps by which the product is made; serial process

assembly line

22
New cards

assembly line only the flow is continuous such as with liquids; chemical rxns; oil and gas; physics

continuous process

23
New cards

Project layout

-the product remains in a fixed location

-a high degree of task ordering is common

-a project layout may be developed in arranging materials according to their assembly priority (shadow box)

24
New cards

Work Center

-most common approach to developing this type of layout is to arrange workcenters in a way that optimizes the movement of material

-optimal placement often means placing workcenters with large interdepartmental traffic adjacent to each other

-sometimes is referred to as a department and is focused on a particular type of operation

25
New cards

formed by allocating dissimilar machines to cells that are designed to work on similar products (shape, processing)

manufacturing cell

26
New cards

designed for the special purpose of building a product by going through a series of progressive steps; highly repetitive

assembly line and continuous layout

27
New cards

defined as standard approach to choosing among alternative processes or equipment

Break-even analysis

28
New cards

Break-even analysis: model seeks to determine the point in units produced where a company will... on the process

start making profit

29
New cards

Break-even analysis: model seeks to determine the point in units produced where....

total revenue and total cost are equal

30
New cards

break-even demand formula

purchase cost of process or equipment/price per unit-cost per unit

or

total fixed costs of process or equipment/ unit price to customer-variable cost per unit

31
New cards

a method to evaluate the specific processes that materials follow as they move through the plant

manufacturing process flow design

32
New cards

focus should be on the identification of activities that can be minimized or eliminated

-movement and storage

-the fewer the moves, delays, and storage, the better the flow

manufacturing process flow design

33
New cards

T or F: Break-even analysis can only be used in production equipment decision making when dealing solely with variable costs

false

34
New cards

T or F: One difference between an assembly line process flow and a continuous process flow is that on the assembly line, the flow is discrete rather than continuous

true