Industrial Engineering & Process Improvement Assessment Flashcards

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/34

flashcard set

Earn XP

Description and Tags

A set of vocabulary flashcards covering Lean manufacturing, Six Sigma, Quality tools, OEE, Supply Chain, and EHS based on industrial engineering assessment notes.

Last updated 3:09 PM on 8/3/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

35 Terms

1
New cards

TIMWOODS / DOWNTIME

Acronyms used to remember the 8 wastes in Lean Manufacturing, such as Transportation, Overproduction, and Waiting.

2
New cards

Value Stream Map (VSM)

A tool primarily used to visualize material and information flow to identify non-value-added steps in a process.

3
New cards

Seiton

The step in 5S that refers to setting items in order for easy access.

4
New cards

Overprocessing

A type of waste that occurs when more work or higher precision is applied to a product than the customer requires.

5
New cards

Kaizen event

A focused, short-duration improvement activity targeting a specific process.

6
New cards

Single-Minute Exchange of Die (SMED)

A methodology used to reduce setup or changeover time.

7
New cards

Kanban system

A tool used to visually manage work-in-progress and pull production based on downstream demand.

8
New cards

Cellular manufacturing layout

A layout where equipment and stations are arranged in the sequence of the process flow for a product family.

9
New cards

DMAIC Analyze Phase

The phase primarily focused on identifying root causes of defects or variation.

10
New cards

Pareto chart

A tool based on the 80/2080/20 rule, stating that a small number of causes account for most effects.

11
New cards

Process capability index (Cpk)

A metric that measures how well a process output fits within specification limits while accounting for centering.

12
New cards

Special cause variation

Assignable variation indicated by a control chart point falling outside the control limits.

13
New cards

5 Whys

A technique used to drill down iteratively from a symptom to a root cause.

14
New cards

Fishbone (Ishikawa) diagram

A diagram that organizes potential causes under categories such as Man, Machine, Material, Method, Measurement, and Environment.

15
New cards

Corrective action

In a CAPA process, this addresses the immediate root cause of the identified nonconformance.

16
New cards

ISO 9001 Clause 10.2

The clause regarding Nonconformity and Corrective Action that requires organizations to react to nonconformities and evaluate the need for action to eliminate root causes.

17
New cards

OEE (Overall Equipment Effectiveness)

A metric calculated as Availability×Performance×Quality\text{Availability} \times \text{Performance} \times\text{Quality}.

18
New cards

Availability calculation

Availability=Planned Production TimeDowntimePlanned Production Time\text{Availability} = \frac{\text{Planned Production Time} - \text{Downtime}}{\text{Planned Production Time}}

19
New cards

Performance (OEE component)

A reflection of speed loss, comparing the actual output rate to the ideal or design rate.

20
New cards

MTBF (Mean Time Between Failures)

A key metric used for assessing equipment reliability.

21
New cards

MTTR (Mean Time To Repair)

A metric used to identify opportunities to improve maintenance response and repair efficiency.

22
New cards

Autonomous Maintenance

One of the 8 pillars of TPM where operators take ownership of basic equipment care such as cleaning, inspection, and lubrication.

23
New cards

Six Big Losses

TPM categories including Breakdowns, Setup/Adjustment, Small Stops, Reduced Speed, Startup Rejects, and Production Rejects.

24
New cards

Economic Order Quantity (EOQ)

A model that minimizes the combined total of ordering costs and holding costs.

25
New cards

Safety stock

Inventory held primarily to buffer against variability in demand and/or supply lead time.

26
New cards

Just-In-Time (JIT)

A production aim to produce and deliver exactly what is needed, when it is needed, in the amount needed.

27
New cards

Bullwhip Effect

The amplification of demand variability as orders move upstream from retailer to manufacturer to supplier.

28
New cards

Material Requirements Planning (MRP) inputs

The Bill of Materials (BOM), Master Production Schedule, and Inventory records.

29
New cards

OTIF (On-Time-In-Full)

A metric reflecting a supplier's performance regarding delivery timing and completeness.

30
New cards

HIRARC

An acronym for Hazard Identification, Risk Assessment, and Risk Control.

31
New cards

Hierarchy of Controls

A sequence of safety measures from most to least effective: Elimination, Substitution, Engineering Controls, Administrative Controls, and PPE.

32
New cards

ISO 45001

A standard for occupational health and safety management systems that integrates hazard identification and risk assessment into planning.

33
New cards

ISO 3864 and ISO 7010

Standards that primarily standardize safety signs, symbols, and colors.

34
New cards

Risk Level

Typically calculated as a function of Likelihood of occurrence×Severity of consequence\text{Likelihood of occurrence} \times \text{Severity of consequence}.

35
New cards

Takt time vs. Cycle time

If actual average cycle time (e.g., 55 seconds55 \text{ seconds}) exceeds takt time (e.g., 45 seconds45 \text{ seconds}), the line is a bottleneck and cannot meet demand.