1/87
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
environmental management
the methodical approach of administering & overseeing human activities to minimize their envral impact while promoting sustainability
includes organizing, monitoring, & executing ideas/policies/practices in aim to reduce pollution, protect natural resources, & ensure socioeconomic dev. = balanced w/ envral conservation
1980s-90s: public shift in how people think about & organise the environment
scope
the range of locations, activities, & processes considered in an EM project/system
defines extent/boundaries the EM efforts will cover (physical & non-physical)
key components of scope (in EM)
Geographic boundaries
Environmental pieces
what is affected by the project? ie. trees, pollution, groundwater
Organisational functions
the operations w/in an org. that are involved w/ the EM system
ie. human resources, supply chain - the pieces that link to the project itself
Regulatory & legal requirements
what relevant environmental standards need to be followed? Laws? Regional, national, international scales?
Stakeholders
those who have interest in the project
ie. ppl who live in the region, ppl who may be affected by air pollution, customers, workers
Timeframe
period in which project takes place, could be months-years-decades
Objectives/goals
specific envral outcomes the project aims for
ie. reduce carbon emissions, generate more energy from a dam
1969 Santa Barbara oil spill
Californian coast, several oil rigs in the region
oil spill all over coastline over 11 days
thousands of marine animals died, tourism suffered
severe economic losses (farms along coast aslo impacted)
largest oil spill in US waters at the time
wealthy area - LOTS of media coverage
1969 Cuyahoga river fire
6 months after Santa Barbara, lots of media coverage partly due to timing
completely industrialised region (Akron & Cleveland to Lake Erie), river heavily polluted w/ industrial waste
caught fire for ~30 min, caused ~50k USD damage
semi-regular occurrence (happened 13+ times previously)
became symbol of envral neglect
1962-70 mercury contamination in Grassy Narrows
“Path of the Poison” in English River Wabigoon system
many continue experiencing impacts today
pulp & paper mill leaked mercury continuously into water over 8 years
estimated 10 tons in the river
spread through the area
highly toxic, esp. for young, elderly, & vulnerable
bioaccumulates
many experienced symptoms, primarily indigenous
minimal media coverage
way of life involved fishing, huge disruption of local livelihoods
case of envral inuustice
significance of 1969 Santa Barbara oil spill & Cuyahoga river fire
events acted as catalysts that spurred environmental change
w/o the shift they caused in public perception, likely would not have been as significant as they are
history of EM
early conservation efforts (late 1800s-early 1900s)
rise of envral awareness (1960s-70s)
global envral governance (1980s-90s)
integration & interdisciplinary (2000s-present)
history of EM: early conservation efforts (late 1800s-early 1900s)
national parks & wildlife reserves established
Europe & NA
main focus: preserving natural/wild landscapes, done by governments
history of EM: rise of envral awareness (1960s-70s)
characterised by growing public concern
Silent Spring published
National Environmanl Policy Act
many envral groups born during this time
natural disasters occur (Santa Barbara, Cuyahoga, Grassy Narrows)
history of EM: global envral governance (1980s-90s)
establishment of big treaties begins (Montreal, Kyoto Protocols)
Ozone hole prevention / reduction
Chernobyl happens
growing understanding of interconnected envral problems
begin to see intl collaboration
history of EM: integration & interdisciplinary (2000s-present)
begin to see transformation of EM towards integrative interdisciplinary collaboration to solve large-scale problems
Paris Agreement, UNFCCC COP26, SDGs
Global Youth Cllimate Strikes
EM core goals/principles
sustainability
precautionary principle (PP)
polluters pay principle (PPP)
environmental justice
EM core principles: sustainability
practice of meeting present needs w/o compromising future generation’s ability to meet their own needs
holisitic approach to balance envral protection, economic growth, & social equity to ensure LR well-being for people & planet
3 main components of sustainability
environmental, social, & economic
EM core principles: precautionary principle
taking proactive steps to prevent envral (& human) harm, even if there is uncertainty about potential risks
ex: DDT ban
EM core principles: polluters pay principle (PPP)
envral policy concept - those who cause envral degradation/produce pollution should bear cost of managing its effects to prevent harm to envr/human health
polluter (rather than society) should be responsible for their negative externalities
widely used in envral regulations & policies, underpins:
envral taxes, fines, fees, & liability insurance
basis of cap-&-trade
embedded in intl agreements & declarations (ie. Rio Declaration 1992)
EM core principles: envral justice
fair treatment & meaningful involvement of all people in the development, implementation, & enforcement of envral laws, regulations, & policies, regardless of race, national origin, or income
primary goal: ensure no grp has disproportioante share of negative envral impacts, esp. those who are traditionally marginalised
examples of injustice: Flint water crisis in Michigan, African-American community w/ lower economic status & unsafe potable water
systems thinking in EM
due to complexity of the envr, changes in one part may have implications elsewhere
may also not be immediate
pieces of environment = interdependent
socio-ecological system
ecological parts of our envrs connected to social parts
if change in physical/natural envral, will have social (as well as physical) impacts
ie. changing farming patterns/local practices changes consumption habits
feedback loops
if we change 1 part of system, may see a change elsewhere
often in systems
ie. melting ice caps
small changes lead to continual change
positve or negative loop mechanisms
systems resilience
systems/ecosystems have ability to deal w/ (minor) disturbances while maintaining their original functions (ie. a couple seasons of drought in a grassland)
systems thresholds
reached when system = under continual stress (ie. a decade of drought pushes grassland into a diff ecosystem type, ie. shrubland)
changes system when reached, unable to bounce back
key actors & institutions in EM
envral problems = inherently complex, require input from diff disciplines to address them effectively
interconnected systems, varying scales
issues encountered in interdisciplinary projects
differing methodologies & interests
integration
communication barriers
today’s key environmental challenges / global issues are …
each complex problems with their own solutions (both of which vary based on location)
often interlinked
4 drivers of envral degradation
population growth
consumption patterns
economic systems
technological change
> unevenly distributed across the world
governance structures & regulation in EM
design & enforce envral policies
role of regulations/incentives/market-based instruments in managing envral risks
importance of transparency, accountability, & participation
the anthropocene
geological epoch shaped by profound & lasting impacts of human activity
humans now dominant diver of natural processes
both direct & indirect
active adaptive management
treats management as an experiment as it goes
tests hypotheses & monitors outcomes to directly inform future decisions
may happen for first-of-a-kind projects, treated as experiments for future reference
adaptive co-management
dynamic approach, combines collaborative elements of co-management with learning-focused strategies & flexibility of adaptive management
multiple stakeholders work together while continuously learning/adapting to changing conditions
adaptive envral management (AEM)
structured, iterative approach to managing encral systems under uncertain conditions
emphasizes learning by doing, treating management as experiential, & adjusting strategies based on what is learned
goal: to improve outcomes over time by integrating monitoring, feedback, & continous learning into decision-making
adaptive systems thinking
recognizes ecosystems as complex, dynamic, & interconnected
management flexible & iterative - accepts impossibility of full control
focus on leraning, resilience, & feedback
anthropogenic (social & economic) impacts
impact of a proposed project on people / communities / social structures / livelihoods / economies
positive or negative
often large range of stakeholders
ie. livelihoods, employment, displacement, health, infrastructure, community dynamics, public services
arnstein’s ladder
higher you go, the more you are participating
1 - 2: non-participation
3 - 5: tokenism
6 - 8: citizen power
arnstein’s ladder: non-participation
manipulation: influencing, convincing, or trying to “educate” people (coercion)
therapy: “curing” people who express distaste for the project by convincing them otherwise
arnstein’s ladder: tokenism
informing: telling ppl about the project (more passive, not v. interested in their opinions)
consultation: info gathered from participants, but limited actual change/contribution from this in proceedings
placation: ideas infleunce decisions, but someone else ultimately does decision-making
arnstein’s ladder: citizen power
partnership: power shared by participants & another group (ie. gov), both make some decisions
delegated power: participants make most decisions (often urban projects)
citizen control: participants make all decisions (participants impacted by project in a significant way)
biophysical impacts
effects of a proposed project on envr’s physical & biological component
often characterised as direct/indiret
ie. soil, land, water resources, air quality, vegetation, biodiversity, climate, ecosystem & services
capacity building
COME BACK TO THIS - L5
co-management / shared management
collaborative approach where envral decisions & management is jointely shared between agencies & local stakeholders
can be collaborative governance, but not all collaborative governance = co-management
resource-specific
types:
community-based management (CBM)
adaptive co-management
example: Nunavut Wildlife Management Board
adaptive co-management
collaborative governance
government agencies work together w/ non-governmental stakeholders (community grps, businesses, scientists, etc) in shared decision-making framework
usually working with groups of people, not individuals
command-&-control
traditional EM strategies, aim to predict & control natural systems w/ top-down regulation & fixed rules
community-based management (CBM)
empowers local communities to take central role in EM decisions
emphasizes participation, decision-making, & local knowledge w/ community having prinary responsibility for various management realms
co-operative (joint) assessments
project designed federally, but also triggers provincial envral assessment
ie. w/in provincial borders but has federal funding, federal mining project that also triggers provincial interest
both gov levels work together in cooperative agreement or memorendum of understanding
in a joint process:
1 assessment conduct to satisfy both gov reqs
coordinated timelines, public participation, & reporting
each gov retains own decision-making authority at end of process
cumulative effects
combined, incremental impacts when considered w/ past, present, & future actions
have:
broader spatial & temporal scope (LR impacts)
multiple impact sources
incremental impact
synergistic effects (interactions lead to totally diff impact)
ie. climate change, biodiversity loss, water resources
cumulative effects assessment (CEA)
process in an EIA, evaluates combined impacts of a proposed project along w/ past/present/future projects/activities in same region
goal: understand combined impact over time & broader area (rather than in isolation)
identify & focus on envral/social components (particularly valuable or vulnerable)
scope: broader/longer spatial/temporal
cumulative effects: look at interactions & thresholds
evaluates mitigation measures :
develop strategies to mitigate cumulative impacts
coudl include project modifications, more sustainable practicess, or broader regional planning efforts to manage cumulative effects
need continous monitoring to track cumulative impacts, esp. since they may be gradual
adaptive management strategies put in place in case new/unexpected impacts arise
EIA process: decision making
EIA report submission: to relevant authority/decision-making body
regulatory review & public consultation
alternatives evaluation
mitigation measures assessment
weighing envral, social, economic factors
issuance of a decision
envral management & monitoring plans
appeals & legal challenges
announcement of final decisions & disclosure
compliance w/ envral laws/regulations
technical & scientific soundness
project benefits & stakeholder/community concerns
institutional & political context
designated projects
pre-identified project types that auto-trigger federal impact assessment under the IAA
listed in Physical Activities Regulations; potential for significant adverse effects
includes anything trans-provincial or intl boundaries, or anything w/ public funding
discretionary triggers
competent authority determines if EIA is required based on specific project circumstances
allows flexibility to address projects that don’t meet forma criteria, but could still cause major envral impacts (location, context, or cumulative, etc)
may be required for small projects in sensitive areas
case-by-case, at discretion of authority
double-loop learning
reflects on & possibly changes goals/values behind actions
does everything single-loop does, but also questions underlying assumptions/goals/everything
section 35 of Constitution Act (1982)
recognizes & affirms aboriginal rights
distinct role in participation
indigenous peoples have distinct status as rights-holders, not just stakeholders
participation must consider traditional knowledge, governance systems, & cultural values
duty to consult & accomodate
duty to consult & accomodate
Crown’s legal duty to consult Indigenous Peoples when actions/decisions may impact their rights
range of actions from notification to accomodation
issues w/ treatment of indigenous peoples in envral projects
many standards, but varied implementations
treatment as stakeholders (rather than rightsholders)
consulting too late in projects
reducing indigenous knowledge to envral data points - devalues it
ignores intenral diversity w/in indigenous communities (treats them homogenously)
envral baseline assessment (EBA)
part of scoping in the EIA process
could be modelling, consulting in spurts, or looking at similar projects & how they are changing
used to establish baseline
EIAs public participation requirements
public invited to comment during planning phase
projet proposals & assessment processes readily available
public comment periods required on key documents
special provisions for meaningful indigenous participation
participant funding available to support public/indigenous participation
envral impact assessment (EIA)
a systematic process to identify, predict, & assess potential envral, social, & economic impacts of a proposed project/policy
proposed: before project starts
important tool, integrates envral considerations into decision-making, aims to minimize negative effects & enhance positive ones
direct & indirect impacts
inform actors, stake-holders, & public by evaluating wide range of potential impacts, proposing mitigation measures, identifying alternatives, & esnuring sustainable dev in line w/ regulatory frameworks & EM goals
Canadian - governed by the Impact Assessment Act (2019) at federal level
purpose of EIAs
Identify & predict environmental impacts
Inform decision-makers
Mitigate negative impacts
Ensure regulatory & legal compliance
Facilitate public participation
Support environmental stewardship long-term
Promote sustainable development
free, prior, & informed consent (FPIC)
backed by several treaties (ie. UNDRIP)
indigenous peoples must be able to give/withold consent to projects impacting their lands, territories, or resources
must be free of coercion, prior to any approval, & informed w/ full info about potential impacts
EIA process: impact assessment
critical part of EIA, no EIA w/o it
identify, analyse, & evaluate potential impacts in detail
focus on envral
healps determine impact significance, is essential to guide decisions, design, & project approvals
impact assessment priority concerns
vulnerability: degree to which system susceptible/unable to cope w/ adverse effects of envral changes/hazards
encompasses both system sensitivity & capacity to adapt / recover
assessment = crucial to understand how external stressors (climate change, pollution) may impact it & to find measures to enhance resilience
tries to rank important impacts based on priority
impact assessment steps
identify potential impacts
predict impact nature & magnitude
impact significance evaluation
adverse impacts mitigation
residual impact assessment
risk analysis & uncertainty
Cumulative Impact Assessment
documentation & reporting
impact assessment act (IAA)
governs EIAs at federal Canadian level
replaced CEAA in 2019
more emphasis on indigenous rights, transparency, public involvement, & sustainability
still used today
public participation = core element
impact assessment agency of Canada (IAAC)
federal agency, oversees all major Canadian EIAs
primary goal: ensure potential impacts of designated projects evaluated before decisions = made
mandate:
lead federal impact assessments, streamline projects & avoid duplication
ensure assessments consider envral, health, social, & ecnomic impacts, including indigenous knowledge & rights
engage public & indigenous ppl meaningfully throughout process
provide high-quality evidence-based assessments to support decision-making
promote sustainability, contribute to Canada’s envral/climate goals
EIA process: IAAC
conducts/coordinates EIAs for designated projects
consults indigenous grps, public, & experts
prepares report
provides evidence to Minister of Envr & Climate Change Canada
mitigation
SUPER vague - COME BACK
EIA process: monitoring & follow-up
after project approved & operational
last step
focus on tracking actual envral impacts, determining if proposed mitigation measures implemented & effective, compliance w/ regulatory conditions
involves:
monitoring: collecting data to track envral performance, assess if complies w/ outlined EIA terms
envral indicators: specific metrics to monitor key areas of concern
monitoring frequency: how often measurements = taken, continously, periodically, or at key stages
reporting: monitoring results compiled in reports & shared w/ authorities/stakeholders
follow-up: ensure unforeseen impacts = addressed, project evolves sustainably
adaptive management, corrective actions, audits
EIA process steps
screening
scoping & baseline assessment
impact assessment
decision making
monitoring & follow-up
EIA vs IAA
COME BACK - L8
non-adaptive (traditional) management
assumes fixed model of world
aims for control & predictability, often fails in complex systems
nonlinearity
envral responses !always proportional to inputs
sudden/unexpected changes can occur, challenging predictability & planning
participation in EM
engaging stakeholders from multiple disciplines & communities
stakeholders: all relevant parties (local communities, gov agencies, NGOs, etc)
aims to incorporate diverse POVs, improve decision quality, & foster community ownership of envral initiatives
rationales for pariticipation in EM
normative rationale (rationale of democratic rights)
instrumental rationale
substantive rationale
participation rationales: normative
participation =
participation rationales: instrumental
participation rationales: substantive
participatory approaches
passive adaptive management
residual impacts
resilience
scoping
screening
single-loop learning
adjusts actions to meet existing goals w/o questioning underlying assumptions/goals
socio-economic systems
sustainable development
transparency
Valued Components (VCs)
vulnerability