Socalo, Masonry
The wall between the bottom of the window will and the ground.
80%
Under R2.210 (Use of Income from Fees) It is the percentage of
the LOCAL government under the breakdown of collections that
is documented by the Building Official
15 mm thickness
20 mm thickness
25 mm thickness
In FLOOR Construction of
Solid RC Slabs, What is the AVERAGE thickness for reinforcement
with a:
1 hour
2 hours
3-4 hours
100 mm thickness
125 mm thickness
150 mm thickness
In FLOOR Construction of
Solid RC Slabs, What is the OVERALL thickness for reinforcement
with a:
1 hour
2 hours
3-4 hours
1100 mm minimum
900 mm maximum
750 mm minimum
Under 12.1207 (Stairs/Exits/Occupant Load) What is the width of
a Stairway with an Occupant Load of:
MORE THAN 50
LESS THAN 50
LESS THAN 10
1:10
Under 12.1207 (Stairs/Exits/Occupant Load) What is the dimen-
sion of slopes for exit courts
1:8
Under 12.1207 (Stairs/Exits/Occupant Load) What is the dimen-
sion of slopes for exit passage ways
3 meters
3 hours FR and 4 hours FR
Under 12.1207 (Stairs/Exits/Occupant Load) What is the width of
openings leading to exit courts and exit passage ways and its FIRE RATING
Dry Standpipe - Automatic Dry
Under 12.1212 (Fire Extinguishing Systems) It is a type of Dry
Standpipe that is filled with pressurized air and water is supplied
upon opening
Dispersal Area (Safe)
An area which will accommodate a number of persons equal to
the total capacity of the stand and building it serves, in such a
manner that no person within the area need be closer than 15.00
meters (50 feet) from the stand or building.
Public Way
A parcel of land unobstructed from the ground to the sky, more
than 3.00 meters in width, appropriated to the free passage of the
general public.
Storey
That portion of a building included between the upper surface of
any floor and the upper surface of the floor next above, except
that the topmost storey shall be that portion of a building included
between
the upper surface of the topmost floor and the ceiling or roof
above.
Building Permit
A document issued by the Building Official to an owner/applicant
to proceed with the construction, installation, addition, alteration,
renovation, conversion, repair, moving, demolition or other work
activity of a specific project/building/structure.
Office of the Building Official
The Office authorized to enforce the provisions of the Code and its
IRR in the field as well as the enforcement of orders and decisions
made pursuant thereto.
Code of Hammurabi
The first building law recorded in history
Indigenous Family Dwellings and BP220
Under R1.102 (Declaration of Policy) the following are not included in the NBC
PD 957
Presidential Decree: Subdivision and Condominium Buyers Protective Act
RA8981
Republic Act: PRC Modernization Act of 2000
Bodies of Water
Volcanic Sites
Sources of Fire and Explosives
Under R1.105 (Site Requirements) of the NBC, all buildings must be in a safe distance from 3 factors
Secretary
Under R2.203 (General Powers and Functions of the "blank") This
person is in charge of the following: Formulation of Policies, Ap-
proval of Referral Codes, Ensure compliance with Memorandum
Circulars, and appoints the Building Official
100% of the Building Permit Fees
Under R2.212 (Administrative Fines) What is the percentage of
surcharge in constructing or causing a change in occupancy
without any permit
10% of the Building Permit Fee
Under R2.212 (Administrative Fines) What is the percentage of
surcharge excavating or constructing foundation without any permit.
50% of the Building Permit Fee
Under R2.212 (Administrative Fines) What is the percentage of surcharge in construction of a superstructure up to 2 meters without any permit
25% of the Building Permit Fee
Under R2.212 (Administrative Fines) What is the percentage of surcharge during construction when it includes pile driving and laying of reinforcing bars without any permit.
Cellar
The portion of a building between floor and ceiling which is wholly
partly below grade and so located that the vertical distance from
grade to the floor below is equal to or greater than the vertical
distance from grade to ceiling.
Residential Appliance Type Chimney
A factory-built or Masonry chimney suitable for removing products
of combustion from residential type appliance producing combus-
tion gases bit in excess of 538°C measured at the appliance fuel
outlet.
Load, Lateral
That load caused by winds, earthquakes, or other
dynamic forces.
Load, Live
The weight of the contents of a building or structure; it includes
all loads except dead and lateral loads, and weight of temporary
partitions, cases, counters, and similar equipment, and
all loads imposed due to the occupancy of the building or struc-
ture.
Load, Occupant
The total number of persons that may occupy a building or portion
thereof at any one time.
Corner Lot
A lot situated at the junction of two or more streets forming an
angle of not more than one hundred thirty-five degrees (135o)
Depth of Lot
The average horizontal distance between the front and the rear lot
lines.
Front Lot
The front boundary line of a lot bordering on the street and in the
case of a corner lot, it may be either frontage.
Inside Lot
A lot fronting on but one street or public alley and the remaining
sides bounded by lot lines.
Lot Line
The line of DEMARCATION between either public and private prop-
erty.
Open Lot
A lot bounded on all sides by street lines.
Mezzanine Floor
A partial intermediate floor in any storey or room of a building
having an area not more than one-half of the area of the room or
space in which it is constructed.
Non-conforming Building
A building which does not conform with the regulations of the
district where it is situated as to height, yard requirement, lot area,
and percentage of occupancy.
Panic Hardware
A bar which extends across at least one-half the width of each
door leaf, which will open the door if subjected to pressure.
Pier
An isolated mass of masonry forming support for arches, columns,
girders, lintels, trusses, and similar structural parts.
Platform, Enclosed
A partially enclosed portion of an assembly room the ceiling of
which is not more than 1.50 meters above the proscenium opening
and which is designed or used for the presentation of plays,
demonstrations or other entertainment.
Shaft
A vertical opening through a building for elevators, dumbwaiters,
mechanical equipment, or similar purposes.
Slum
Blighted Area; Eyesore; An area where the values of real state
tend to deteriorate because of the dilapidated, obsolescent, and
unsanitary condition of the building within the area.
Structural Frame
The framing system including the columns and the girders,
beams, trusses, and spandrels having direct connection to the
columns and all other members which are essential to the stability
of the building as a whole.
Wall, Cross
A term which may be used synonymously with a partition.
Wall, Curtain
The enclosing walls of an iron or steel framework or the
Wall, Fire
Any wall which subdivides a building so as to resist the spread
of fire, by starting at the foundation and extending continuously
through all stories to, or above, the roof. Extension above the roof.
is 1.00 meter (3 feet, 3 inches).
Height of Wall
The perpendicular distance measured from its base line either
at the grade or at the top of the girder to the top of the coping
thereof. Foundation and retaining walls are measured from the
grade downward to the base of the footing.
Wire Backing
Horizontal strands of tautened wire attached to
surfaces vertical wood supports which, when covered with build-
ing paper, provide a backing for portland cement plaster.
Oriel Window
A projecting window similar to a bay window, but carried on
brackets or corbels. The term "bay window" may also be applied
to an oriel window projecting over the street line.
EO648
Executive Order: The HLURB
EO72
Executive Order: Preparation and Implementation of the CLUP
EO71
Executive Order: Approval of Preliminary and Final Subdivision
Plan
EO90
Executive Order: The HUDCC (Housing and Urban Development Coordinating Council)
EO124
Executive Order: Evaluating Areas for Land Conversion
EO1008
Executive Order: Construction Industry Arbitration
PD1216
Presidential Decree: Open Space in Residential Subdivisions
30%
A percentage of 1 hectare of an OPEN space in RESIDENTIAL SUBDIVISIONS under PD1216
9% and 3.5%
A percentage of an open space in SOCIALIZED housing in residential
subdivisions under PD1216
7%
A percentage of an open space in ECONOMIC housing in residential
subdivisions under PD1216
PD957
Presidential Decree: Subdivision and Condominium Buyers Protective Act
PD223
Presidential Decree: PRC (Professional Regulatory Commission)
PD705
Presidential Decree: System of Land Classification
PD1067
Presidential Decree: Water Code
PD856
Presidential Decree: Sanitation Code
RA1378
Republic Act: Plumbing Code
RA545
Republic Act: Regulate to Practice or Predecessor of RA9266
RA9285
Republic Act: Alternative Dispute Resolution
ADR
Alternative Dispute Resolution
RA8981
Republic Act: PRC Modernization Act of 2000
RA7279
Republic Act: Urban Development and Housing Act
BP220
Batasa Pambansa: Socialized and Economic Act
BP344
Bastas Pambansa: Accessibility Law
RA8293
Intellectual Property Code
RA7160
Republic Act: Local Government Code
RA4566
Republic Act: Contractor's License Law
Civil Code Article 1723
Civil Liability of Architect
Indigenous Family Dwellings and BP220
Under R1.102 (Declaration of Policy) the following are not includ-
ed in the NBC
15 Days for Repair / Renovation
Under 2.216 (Other Remedies) After the final decision of the
Secretary, the Owner is notified. How many days is given to the
owner to repair/renovate damages?
Less than 20 sqm
Under 3.301 (Building Permits) How many square meters is pre-
scribed for patios to be exempted from a Building Permit
500 mm in depth
Under 3.301 (Building Permits) How many square meters is pre-
scribed for an aquarium of private use to be exempted from a
Building Permit
1.20 m in height
Under 3.301 (Building Permits) How many square meters is prescribed for garden masonry walls to be exempted from a Building Permit
240 mm minimum
Under 10.1002 (Projections into Alleys and Streets) What is the
MINIMUM footing projection below grade along national roads
300 mm maximum
Under 10.1002 (Projections into Alleys and Streets) What is the
MAXIMUM footing projection beyond the property line
500 mm maximum
Under 10.1002 (Projections into Alleys and Streets) What is the
allowable MAXIMUM width of a foundation that can encroach into
public sidewalks
600 mm maximum
Under 10.1002 (Projections into Alleys and Streets) What is the
allowable MAXIMUM depth of a foundation that can encroach into
public sidewalks
3 meters maximum
Under 10.1003 (Projections of Balconies over Streets) What is the
MAXIMUM height clearance of balconies from street grade
28 (10 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Dwellings
18.6 (10 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area per occupant for Apartments, Dormitories, and Hotels
1.8 (50 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Classrooms
1.4 (50 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area per occupant for Conference Rooms, Exhibit Halls, and Gymnasia
4.6 (50 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area per occupant for School Shops, Vocational Institutions, and Laboratories
8.4 (5 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area per occupant for Hospitals and Sanitaria
7.4 (5 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Nursing Homes, Adoption Centers, and Homes
for the Aged
3.25 (6 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Children Nurseries
2.8 (50 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Basements and Ground Floor
5.6 (10 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Upper Floors
9.3 (30 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area
per occupant for Offices
0.65 (50 occupants = 2 Exits)
Under 12.1207 (Stairs/Exits/Occupant Load) What is the unit area per occupant for Auditoriums, Theaters, Church / Chapels, Dance Floor, and Review Stands
6 meters
Under 12.1207 (Stairs/Exits/Occupant Load) What is the MAXI-
MUM length of corridors with dead ends
1 hour FR
Under 12.1207 (Stairs/Exits/Occupant Load) What is the Fire
Rating for Corridors