Entry Path
CVS and RNS
(Step 2 & 3)
FWS
(Step 4)
ALL Pumps OFF
ALL Paths Isolated
SGS and CCS
(Step 5 & 6)
VWS, DWS, FPS, SFP Cooling
(Step 7 & 8)
Final Status of Systems at Procedure Completion
CVS: OFF if not needed for core cooling or boration
RNS: Stopped if leaking from CLP/SFP with V011&V022 Closed
FWS: ALL Stopped and Isolated
SFS: Isolated from CNS
CCS: Isolated if Not Intact (RCPs tripped and Isolated to CNS)
VWS: Isolated if Not Intact
DWS/FPS/RNS from SFP: Locally Isolated
CNS Equipment Hatches
Elevation Locations
Upper: 135’
Lower: 107’
CNS Personnel Airlocks
Elevation Locations
Upper: 135’
Lower: 107’
Containment Floodup Levels (1/2)
Containment Floodup Levels (2/2)
Credited Floodup Sources:
RCS
TWO Accumulators
TWO CMTs
IRWST
Cask Loading Pil (CLP)
Boric Acid Tank (BAST)
Common Distractors:
CWP, CCS, CST