Quality Management Principles and Tools

0.0(0)
studied byStudied by 0 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/55

flashcard set

Earn XP

Description and Tags

This set of flashcards covers key concepts and tools related to Quality Management, including Six Sigma, Lean methodologies, team dynamics, and various analytical tools.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No study sessions yet.

56 Terms

1
New cards

Six Sigma

A methodology focused on reducing variation and defects in a process.

2
New cards

Lean

An approach aimed at eliminating waste and improving flow.

3
New cards

DMAIC

The five phases of Six Sigma: Define, Measure, Analyze, Improve, Control.

4
New cards

TPS

Stands for Toyota Production System.

5
New cards

Lean Six Sigma

A combination of Lean and Six Sigma methodologies.

6
New cards

Six Sigma belt levels

Hierarchy in Six Sigma including White, Yellow, Green, Black, and Master Black Belt.

7
New cards

Project roles

Roles in projects such as Sponsor and Project Manager.

8
New cards

Team-development stages

The five stages of team development: Forming, Storming, Norming, Performing, and Transforming.

9
New cards

1.5 sigma shift

A correction for long-term process drift in Six Sigma.

10
New cards

Indicates 3.4 defects per million opportunities (DPMO).

11
New cards

Sigma level

A measure of the baseline process capability.

12
New cards

Brainstorming

A technique to generate many ideas without judgment.

13
New cards

NGT

Nominal Group Technique; structured idea prioritization.

14
New cards

Multi-voting

A method used to narrow down a long list of ideas.

15
New cards

5 fundamentals of quality

Customer focus, prevention, continuous improvement, employee involvement, and fact-based decisions.

16
New cards

Quality

The measure of meeting customer requirements consistently.

17
New cards

Cost of quality categories

Include Prevention, Appraisal, Internal Failure, and External Failure.

18
New cards

Check Sheet

A structured data-collection tool.

19
New cards

Histogram

A graph that shows data distribution.

20
New cards

Pareto Chart

A chart used to identify the vital few causes in the 80/20 rule.

21
New cards

Fishbone Diagram

A tool used for root-cause identification.

22
New cards

Scatter Plot

A chart that shows relationships between variables.

23
New cards

Run Chart

A chart showing performance trends over time.

24
New cards

Control Chart

A tool used to detect process stability and variation.

25
New cards

Problem statement questions

What, Where, When, and Impact.

26
New cards

VOC

Voice of the Customer.

27
New cards

CTQ

Critical to Quality; a measurable requirement.

28
New cards

Stakeholder analysis

The process of identifying and managing those affected by a project.

29
New cards

Stakeholder ranking criteria

Criteria used to rank stakeholders based on their Power and Interest.

30
New cards

SIPOC

Supplier, Inputs, Process, Outputs, Customer; a tool used in defining processes.

31
New cards

Project charter

A document that defines the scope, goals, roles, and alignment of a project.

32
New cards

RACI chart

A matrix used to clarify who does what in a project.

33
New cards

Responsible

The person who does the work in a project.

34
New cards

Accountable

The person who owns the outcome of a task.

35
New cards

Consulted

Individuals who provide input on a project.

36
New cards

Informed

Individuals who are kept updated on a project.

37
New cards

Affinity Diagram

A tool used to group similar ideas or themes.

38
New cards

Critical Path

The longest sequence of dependent tasks in a project.

39
New cards

Measures of central tendency

Mean, Median, and Mode.

40
New cards

Measures of spread

Range, Variance, and Standard Deviation.

41
New cards

FMEA

Failure Mode and Effects Analysis; identifies potential failures and prioritizes them.

42
New cards

RCA

Root Cause Analysis; a method for identifying the root cause of issues.

43
New cards

5 Whys

A technique used to dig to the root cause of a problem.

44
New cards

Data distribution shapes

Normal, Skewed, and Bimodal shapes of data.

45
New cards

Type I error

Also known as a false positive.

46
New cards

Type II error

Also known as a false negative.

47
New cards

Significance level

Typically set at 0.05 in statistical tests.

48
New cards

Goal of the Improve phase

To implement solutions that address validated root causes.

49
New cards

PICK chart

A tool for ranking solutions based on effort and impact.

50
New cards

Pilot test

A small-scale trial run to test a solution.

51
New cards

Future-State Map

A redesigned process map showing improvements.

52
New cards

Update FMEA in Improve

To evaluate the risks associated with the new process.

53
New cards

Goal of the Control phase

To sustain improvements and prevent regression.

54
New cards

Control Plan

A document that specifies how a process is monitored.

55
New cards

Update SOPs

To institutionalize the improved process.

56
New cards

Control charts

Tools used to monitor the stability of an improved process over time.