50 Terms

1
New cards

Lean 6 sigma is a (3)

,Management Philosophy, metric, methodology

2
New cards

Opinion data cannot be

,improved

3
New cards

Define ascostic, DMAIC (MDAIC),Define

Measure
Analyze
Improve
Control

4
New cards

Which methodology is used for problems with NO proven solution

,DMAIC

5
New cards

List 4 methodologies,

DMAIC
LEAN
"DESIGN for 6Sigma"
Go Do

6
New cards

"Design for 6 Sigma" is for the


so as not to have a at _.,

creation of new things
defect
launch

7
New cards

SMART problem statement should be (5),

specific
measurable, acchievable
realistic
time-based

8
New cards

Sigma calc take away:

high sigma is,good

9
New cards

Sigma calc take away:

low sigma is,Bad

10
New cards

Average only good for what data?,

Normal distribution

11
New cards

For Non normal data a better indicator than average is,

Median

12
New cards

2 ways to test hypothesis,

Try it
and
historical data

13
New cards

Who defines the defects and Y metric,

Customer

14
New cards

Y is a function of,

X

15
New cards

Entitlement is,

Best ever done

16
New cards

Scrap entitlement is,

Lowest scrap rate

17
New cards

Cycle time entitlement is,

Lowest cycle time

18
New cards

Production entitlement is,

Highest production

19
New cards

DPMO,

Defects per million

20
New cards

Pareto chart,

Graphical display of 80/20 rule

21
New cards

2 types of data are,

Discrete
And
Continuous

22
New cards

Control Chart identifies (2)

variations,Special cause
And
random

23
New cards

Control chart plots (2),

The average
3 standard deviations

24
New cards

Boxplot is used for what kind of data,

Continuous Y and discrete X

25
New cards

Baseline of data is either

Average or median data

26
New cards

If process is out of control it indicates,

Non random patterns in data

27
New cards

25 tires weighed randomly selected from warehouse represent what type of data (weights could be any value),

Continuous

28
New cards

25 tires sorted into piles by type represent what type of data? tIres counted by an identified characteristic),

Discrete

29
New cards

Lean focuses on removal of,

Waste

30
New cards

Lean 7 forms of waste are,

Defects
Over-production
Waiting
(Not utilizing
. talent)
Transportation
Inventory
Motion
Excess-Processing

31
New cards

5s is the Lean principle for organizing an area and sustaining new order. It stands for:,

Sort
Set
Shine
Standardize
Sustain

32
New cards

Value added is defined by a task that,

Physically changes a product
Is right the first time
Is something the customer would pay for

33
New cards

Percent of process steps that add no value,

95

34
New cards

TPM stands for,

Total productive maintenance

35
New cards

One principle of Lean is,

Single piece flow

36
New cards

In Lean we are taught that we can take X% of time from any process,

75

37
New cards

Lean places 2 concepts under the principle of Poke Yoke:,

Risk mitigation and
Mistake proofing

38
New cards

Lean defines 4 methodologies,

Lean
DMAIC
DMADV
Go do

39
New cards

Lean Tool, SIPOC stands for,

Supplier
Inputs
Process
Output
Customer

40
New cards

Lean Tool, VSM stands for,

Value Stream Mapping

41
New cards

Value Stream Mapping consists of (4) activities,

SIPOC
Activity mapping
Value added and
Non value added analysis
Waste hunting

42
New cards

Wishbone diagram is primarily for,

Brainstorming root causes of a problem

43
New cards

2 major Fishbone mistakes,

Opinion data
and
Don't finish their sentences

44
New cards

Fishbone should use this language,

Is it possible that blank Causes blank

45
New cards

A car can be scratched or dented. How many opportunities for defects exist?,

2

46
New cards

Calc TOP for 25 cars that can be scratched or dented.,

50 possible defects

47
New cards

Calc DPMO for 25 cars if 7 are scratched and 2 are dented.,

180000 DPMO

48
New cards

Calc TAKT for 60 units that must be produced in 30 minutes.,

.5 Min/unit

49
New cards

" Try it" is a good approach If (4),

Cheap
Easy
Fast
Reversable

50
New cards

TAKT,

takt time is the RATE at which a finished product needs to be completed in order to meet customer demand.