Lean 6 sigma is a (3)
,Management Philosophy, metric, methodology
Opinion data cannot be
,improved
Define ascostic, DMAIC (MDAIC),Define
Measure
Analyze
Improve
Control
Which methodology is used for problems with NO proven solution
,DMAIC
List 4 methodologies,
DMAIC
LEAN
"DESIGN for 6Sigma"
Go Do
"Design for 6 Sigma" is for the
so as not to have a at _.,
creation of new things
defect
launch
SMART problem statement should be (5),
specific
measurable, acchievable
realistic
time-based
Sigma calc take away:
high sigma is,good
Sigma calc take away:
low sigma is,Bad
Average only good for what data?,
Normal distribution
For Non normal data a better indicator than average is,
Median
2 ways to test hypothesis,
Try it
and
historical data
Who defines the defects and Y metric,
Customer
Y is a function of,
X
Entitlement is,
Best ever done
Scrap entitlement is,
Lowest scrap rate
Cycle time entitlement is,
Lowest cycle time
Production entitlement is,
Highest production
DPMO,
Defects per million
Pareto chart,
Graphical display of 80/20 rule
2 types of data are,
Discrete
And
Continuous
Control Chart identifies (2)
variations,Special cause
And
random
Control chart plots (2),
The average
3 standard deviations
Boxplot is used for what kind of data,
Continuous Y and discrete X
Baseline of data is either
Average or median data
If process is out of control it indicates,
Non random patterns in data
25 tires weighed randomly selected from warehouse represent what type of data (weights could be any value),
Continuous
25 tires sorted into piles by type represent what type of data? tIres counted by an identified characteristic),
Discrete
Lean focuses on removal of,
Waste
Lean 7 forms of waste are,
Defects
Over-production
Waiting
(Not utilizing
. talent)
Transportation
Inventory
Motion
Excess-Processing
5s is the Lean principle for organizing an area and sustaining new order. It stands for:,
Sort
Set
Shine
Standardize
Sustain
Value added is defined by a task that,
Physically changes a product
Is right the first time
Is something the customer would pay for
Percent of process steps that add no value,
95
TPM stands for,
Total productive maintenance
One principle of Lean is,
Single piece flow
In Lean we are taught that we can take X% of time from any process,
75
Lean places 2 concepts under the principle of Poke Yoke:,
Risk mitigation and
Mistake proofing
Lean defines 4 methodologies,
Lean
DMAIC
DMADV
Go do
Lean Tool, SIPOC stands for,
Supplier
Inputs
Process
Output
Customer
Lean Tool, VSM stands for,
Value Stream Mapping
Value Stream Mapping consists of (4) activities,
SIPOC
Activity mapping
Value added and
Non value added analysis
Waste hunting
Wishbone diagram is primarily for,
Brainstorming root causes of a problem
2 major Fishbone mistakes,
Opinion data
and
Don't finish their sentences
Fishbone should use this language,
Is it possible that blank Causes blank
A car can be scratched or dented. How many opportunities for defects exist?,
2
Calc TOP for 25 cars that can be scratched or dented.,
50 possible defects
Calc DPMO for 25 cars if 7 are scratched and 2 are dented.,
180000 DPMO
Calc TAKT for 60 units that must be produced in 30 minutes.,
.5 Min/unit
" Try it" is a good approach If (4),
Cheap
Easy
Fast
Reversable
TAKT,
takt time is the RATE at which a finished product needs to be completed in order to meet customer demand.