24 Terms

1
New cards

Concrete

a construction material produced by combining Portland

cement with aggregate and water

2
New cards

Admixture

material other than cement, aggregates, and water that

are added to concrete either immediately before or

during its mixing to alter the properties of concrete in a

variety of ways

3
New cards

Batching

process of proportioning cement, water, aggregates, and

additives prior to mixing concrete

4
New cards

Plasticizers

used to increase workability of mix

5
New cards

Pozzolan

used to reduce the heat of hydration, increase

workability, and reduce segregation of mix

6
New cards

Accelerator

decreases setting time and increase the early strength of concrete

7
New cards

Retarder

slows the rate of hardening of concrete

8
New cards

Water-reducing agent

increases the slump or workability of a concrete mix,

allowing the amount of water in concrete to be changed

without a change in consistency

9
New cards

Hydration

chemical reaction between cement and water which

produces hardened cement

10
New cards

Water

required in the concrete mix to provide the moisture

required for hydration of cement to take place

11
New cards

Aggregate

used in concrete to reduce the cost of the mix and reduce shrinkage

12
New cards

Total resistance

the combination of grade resistance and rolling resistance

13
New cards

Rolling resistance

primarily due to tire flexing and penetration of the travel

surface

14
New cards

Grade resistance

represents the component of vehicle weight which acts

parallel to the inclined surface

15
New cards

Heaped volume

maximum volume that can be placed in the bucket

without spillage based on a specific angle of repose

16
New cards

Water line capacity

assumes a level of material flush with the lowest edge of

the bucket

17
New cards

Struck capacity

bucket capacity when the load is struck off flush within

the bucket sides

18
New cards

Plate line capacity

the bucket volume contained within the bucket when

following the outline of the bucket sides

19
New cards

Overhead signs

signs which provide means of displaying essential traffic

information on wide multi-lane roads, where some degree

of lane use control is required or where side-of-road

clearance is insufficient to accommodate a road side sign

20
New cards

Roadwork signs

warn users of temporary hazardous conditions that could endanger road users or the men and equipment engaged in roadwork

21
New cards

Guide signs

inform and advice road users of directions, distance,

routes, and points of interest

22
New cards

Warning signs

warns users of road condition on or adjacent to the road

23
New cards

Regulatory sign

signs that inform road users of traffic laws and

regulations

24
New cards

Traffic sign

device mounted on a fixed support or portable support

whereby a specific message is conveyed by means of

words or symbols placed or erected for the purpose of

regulating, warning, or guiding traffic