Earthwork Test 1

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/99

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 4:47 AM on 9/10/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

100 Terms

1
New cards

What does the geotechnical engineer prepare for soil and construction management?

-Soil testing reports

-design alternatives

-equipment reccommendations

2
New cards

What does the project manager?

-match the design/scope with available resources

-select the equipment

-design the work sequence/schedule

-monitor the progress and adjust operations as necessary

3
New cards

What are three soil types?

-granular

-cohesive

-organic

4
New cards

Granular Soil

-smaller 3D versions of parent rock

-strong and relatively stable

-from boulders to silt

5
New cards

Cohesive Soil

-Small flat 2D particles

-React with water

-Clays

6
New cards

Organic Soil

-organic materials

-decay over time

-peat and muck

-odor

7
New cards

What do you have to worry about with clay?

moisture

8
New cards

What do you have to worry about with sand?

dryness

9
New cards

Who pays for the Geotech report?

owner

10
New cards

What are "problem" soils?

-reactive clays

-soft soils

-sink holes

11
New cards

When do you use organic soils?

topsoil

12
New cards

what are the three types of soils identified in a sieve analysis?

-continuous

-uniform

-gap

13
New cards

continuous soil

-compacts well and fits together like puzzle

14
New cards

uniform soil

does not pack together well

15
New cards

gap soil

compacts better than uniform soil but still has air gaps

16
New cards

#4 sieve is where soil changes from gravel to what?

sand

17
New cards

#200 sieve is where soil changes from sand to what?

clay

18
New cards

With the Unified Soil Classification System, each soil is given a ___ - _______ classification.

2 letter

19
New cards

Soil Symbol: G

gravel

20
New cards

Soil Symbol: S

Sand

21
New cards

Soil Symbol: M

Silt

22
New cards

Soil Symbol: C

Clay

23
New cards

Soil Symbol: O

Organic

24
New cards

Soil Symbol: Pt

Peat

25
New cards

Plasticity Symbols

- H: High Plasticity

- L: low Plasticity

26
New cards

Gradation Symbols

-W: Well graded

-P: Poorly graded

27
New cards

SW soil would be what classification of soil?

Well-graded sand

28
New cards

SC soil would be what classification of soil?

clayey sand

29
New cards

SM soil would be what classification of soil?

silty sand

30
New cards

MH soil would be what classification of soil?

Highly Plastic Silt

31
New cards

What is the main criteria used to classify fine grained soils (silt and clay)?

soil plasticity

32
New cards

Soil plasticity largely depends on:

-moisture content

-type of clay mineral

33
New cards

T/F: Two soil samples having approximately the same size particles may behave differently based on the amount of their existing moisture content.

True

34
New cards

Atterberg Limits

The arbitrary limits which define the boundaries between the different states of fine-grained soils

<p>The arbitrary limits which define the boundaries between the different states of fine-grained soils</p>
35
New cards

Shrinkage Limit

a moisture content at which the soil changes from a solid state to a semi solid state

36
New cards

If moisture content is less than the shrinkage limit, then _______________.

there is no volume reduction upon drying

37
New cards

Moderate Shear Strength in Soil

soil is stable and can support low to moderate loads

38
New cards

Plastic Limit

The moisture content at which a soil starts to change from a semisolid to a plastic state

39
New cards

Plastic Material

one that deforms readily without cracking or crumbling

40
New cards

Low Shear Strength in Soil

soil deforms easily under loads

41
New cards

Liquid Limit

-moisture content at which the soil changes from a plastic state to a liquid state

-the water content at which the soil has negligible shear strength

42
New cards

Clay flows like liquid when the moisture content is _______ (greater than, less than) the liquid limit.

greater than

43
New cards

Plasticity Index

Ramge of water content over which the soil remains plastic

44
New cards

Plasticity Index=

Liquid Limit-Plastic limit

45
New cards

Compaction

density of soil by the application of mechanical energy (removing the air)

46
New cards

Why is soil compacted?

-to increase soil strength

-to improve the stability of the soil

-to reduce soil permeability

-to reduce erosion damage

47
New cards

What are the factors affecting compaction?

-water content

-compacting effort

-type of soil

-method of compaction

48
New cards

Liquidity Index is especially important when building in ____ zones.

earthquake

49
New cards

Why is soil compaction important?

- ALL construction work is ultimately supported by soil

- Improperly compacted soils can lead to structural failure

50
New cards

Fill is usually placed in _____ or ______.

lifts, layers

51
New cards

Utility trenches typically have lifts in what increments?

4-inch

52
New cards

Large fill areas typically have lifts in what increments>

6-12 inch lifts (dependent on density requirements, type of soil, and compaction equipment)

53
New cards

Why is it important to scarify or disk the top of a lift that has just been placed before placing next lift?

-prevents laminations

-Ensures uniform compaction

54
New cards

Density requirements in the contract specifications

-expressed as percentage of maximum dry weight

-max dry weight determined by a proctor test

-Proctor Test ASTM 698

55
New cards

Proctor Curve

knowt flashcard image
56
New cards

When do pumping soils occur?

when the moisture content of clayey or silty soils gets too high, they begin to pump when compacted

57
New cards

Bank CY

material in its natural state

58
New cards

Loose CY

Material that has been excavated

59
New cards

Compacted CY

material after it has been compacted

60
New cards

What is the most common method to get cubic yards for earthwork construction?

average end area method

61
New cards

Typically, excavation (cut) is paid for in what unit of measure?

Bank Cubic Yards

62
New cards

Typically, fill is paid for in what unit of measure?

compacted cubic yards

63
New cards

T/F: Hauling soil, haul road maintenance, equipment maintenance, etc. is paid for separately from cut and fill cost.

False. The cost of these activities is included in the unit prices for cut and fill.

64
New cards

What equipment is used to spread material?

dozers

65
New cards

What equipment is used to compact cohesionless soil?

vibratory roller

66
New cards

What equipment is used for cohesive soil?

sheepsfoot roller

67
New cards

What equipment is used to aerate soil?

disks

68
New cards

What equipment is used for sand?

pneumatic roller

69
New cards

What are the objectives of field explorations?

-locate and define vertical and horizontal boundaries of various soil and rock strata under the site

-locate the groundwater table

-determine the engineering properties of the soil (in undisturbed and disturbed state)

70
New cards

What are the benefits of field explorations?

-substantially assist a contractor in preparing a bid

-performed by third party engineers on the request of the owner

-In government projects, owner and engineers may belong to the same organization

71
New cards

Soil Data Obtained During Field Explorations

-Soil Profile

-Index Properties

-Strength and Compressibility Characteristics

-Others

72
New cards

Soil Profile

Layer Thickness and Soil Identification

73
New cards

Index Properties

water content, Atterberg limits, etc.

74
New cards

Strength and Compressibility Characteristics

Shear Strength and Bearing Capacity

75
New cards

Other Data Obtained During Field Explorations

Water table depth, presence of debris or utilities, etc.

76
New cards

Spacing of borings for a multi-story building

50-100ft

77
New cards

Spacing of borings for a one story building, earth dam, and borrow pits

100-200ft

78
New cards

Spacing of borings for highways(subgrade)

500-1000ft

79
New cards

Standard Penetration Test Correlations in Granular Soils

knowt flashcard image
80
New cards

Standard Penetration Test Correlations in Clays

knowt flashcard image
81
New cards

NPDES Phase I

1990 - EPA began requiring large and medium municipalities, many industries, and construction sites greater than 5 acres to obtain NPDES storm water permits

82
New cards

NPDES Phase II

- 1999 - EPA began requiring small municipalities and small construction sites between 1 and 5 acres to require permits - - Phase II covers 75% of construction Industry

83
New cards

SWPPP

-Storm Water Pollution Prevention Plan

- site-specific, dynamic plans that describe and dictate

what measures will be used to control erosion and prevent

sedimentation from leaving a construction jobsite

84
New cards

Why are SWPPPs important?

-dynamic measures taken to keep every inch of soil contained on a jobsite

-Construction professionals need to have a full

understanding of the erosion process to grasp the importance of erosion and sediment control on a

jobsite

85
New cards

Who monitors SWPPP?

-federal government

-state and regional government

-county/city regulations

-construction site owners and operators

-specialty contractors

86
New cards

Erosion

-is the process by which the land surface is worn away

by the action of wind, water and gravity

-is natural and can be accelerated by man

87
New cards

sedimentation

the settling of soil particles transported by wind and water

88
New cards

Erosion control is _______, while sediment control is ________.

proactive, reactive

89
New cards

Good erosion control plan effects:

erosion can be limited to not more than 2% over natural causes of erosion

90
New cards

Bad erosion control plan effects:

-job cost increase

-potential jail time

-loss of job

91
New cards

Buffer Zone

the use of a vegetated strip of land bordering a water body or wetland to reduce sediment and nutrient impact of sheet erosion flow

92
New cards

Stabilized Fiber Matrices and Hydro-Seeding

-Spray of Biodegradable man-made fibers, grass seed, fertilizer and water

- spray effective after 1-hr drying & will control erosion and sedimentation

93
New cards

Erosion Control Blankets

- Plant fiber erosion control blankets most common.

- Erosion control blankets widely used on large projects with steep slopes or anywhere slope stabilization is needed.

- Easy to install and come

- in rolls that range from 3' to custom rolls of 40'

- Most common width is 3'-4'

94
New cards

Types of Sediment Control

• Straw Wattles

• Silt Fence

• Drain Inlet Devices

• Fiber Filtration Tubes

• Rock Check Dams

• Construction Site entrance rip-rap

95
New cards

Silt Fence Effectiveness and Installation

-Most common BMP

-Often fail due to improper installation

-should be checked and maintained often

-cleaned when sediment has accumulated to almost half of the fence's height

96
New cards

Silt Fence Failure Modes

-Poor Maintenance

-By-Pass

-Improper Installation

-Undercutting

-Silt By Pass

-Overtopping

97
New cards

Construction Entrance/Exit Stabilization purpose

to reduce erosion of temporary roadbeds (haul roads) and parking areas prior to final stabilization of the site

98
New cards

Rock Check Dams

-reduce velocity of concentrated flows of storm water in ditches and on slopes

-must be frequently cleaned of debris

99
New cards

Sediment Basins

-Capture, detain, treat stormwater prior to offsite

discharge

- Contain suspended particles found in stormwater runoff

- Treatment through gravitational settlement

- Contained water must remain long enough for deposition of suspended particles to occur

- Install before other grading operations begin

100
New cards

T/F: The bottom of the top check dam needs to be same height as the top of the lower check dam.

True