1/51
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
HORIZONTAL BRANCHES
DRILL A HOLE THROUGH THE CENTER OF THE STUDS
METHANE GAS
120°F
TRUE
5 mins
10 ft
152 mm
125 mm
1.78 m
GA 24 B&S (0.5 mm thick)
6.8 kg asphalt felt
1 hour
air test
the system shall be tight at all points
hot water heater
replace a clean filter screen
4 units
cross section area of the draw pipe served
4
control gate valve
12
utility vent
local vent
looped vent
continuous vent
fixture branch
72 hours
air gap drainage
branch intervals
8 psi
black iron pipe
pop-up drain
the inlet should be higher than the outlet
6”
5 ft
galvanized steel
all of the above
Provide cleanouts on horizontal drain less than 1.5 m in length service sink or urinals.
aggregate kitchen drain size
DC
shut off the curb stop
PVB
228 mm
13
61 m
all of these
zeolite
3”
NSDW
1.2 m2