CSI 2004

studied byStudied by 0 people
0.0(0)
learn
LearnA personalized and smart learning plan
exam
Practice TestTake a test on your terms and definitions
spaced repetition
Spaced RepetitionScientifically backed study method
heart puzzle
Matching GameHow quick can you match all your cards?
flashcards
FlashcardsStudy terms and definitions

1 / 55

encourage image

There's no tags or description

Looks like no one added any tags here yet for you.

56 Terms

1

Division 0

Procurement and Contracting Requierments

New cards
2

Division 1

General Requierments

New cards
3

Division 2

Existing Conditions

New cards
4

Division 3

Concrete

New cards
5

Division 4

Masonry

New cards
6

Division 5

Metals

New cards
7

Division 6

Woods and Plastics and Composites

New cards
8

Division 7

Thermal and Moisture Protection

New cards
9

Division 8

Openings

New cards
10

Division 9

Finishes

New cards
11

Division 10

Specialties

New cards
12

Division 11

Equipment

New cards
13

Division 12

Furnishings

New cards
14

Division 13

Special Construction

New cards
15

Division 14

Conveying Systems

New cards
16

Division 21

Fire Supression

New cards
17

Division 22

Plumming

New cards
18

Division 23

Mechanical

New cards
19

Division 26

Electrical

New cards
20

Division 31

Site Requierments

New cards
21

Temporary Utilities, Vehicular Access and Parking, Commissionings, Cleaning and Waste Management

Division 1

New cards
22

Demolition, Structure Moving

Division 2

New cards
23

Concrete Forming, Embedded Anchors, Concrete Accessories

Division 3

New cards
24

CMU/Brick/Stone, Mortar, Grout, Glass Masonry, Concrete Unit Masonry

Division 4

New cards
25

Steel Joist Framing, Steel Decking, Metal Specialties, Metal Stairs and Railings

Division 5

New cards
26

Plastic Fabrications, Glued Laminated Construction, Fasteners,

Division 6

New cards
27

Dampproofing, Thermal Insulation, Wood Shingles and Shakes, Roof Tiles, Flashing/ Siding.

Division 7

New cards
28

Specialty Doors and Frames, Unit Skylights, Door Hardware, Wood Windows, Louvers, Vents

Division 8

New cards
29

Lath and Plaster, Terrazzo Flooring, Access Flooring, Paint, Gypsum Board

Division 9

New cards
30

Stove/fireplace, Chalkboards, Tackboards, Partitions, Flagpoles,

Division 10

New cards
31

Residential Appliances, Detention Equipment, Religious Equipment

Division 11

New cards
32

Art, Rugs and Mats, Courtains and Drapes, Furniture

Division 12

New cards
33

Saunas, Athletic Rooms, Raidiation Protection, Sound, Vibration, and Seismic Control, Geodesic Structures, Swimming Pools

Division 13

New cards
34

Moving Walks, Elevators, DumbWaiters, Escalators

Division 14

New cards
35

Sprinkeler Systems

Division 21

New cards
36

Residential and Commercial Plumbing Fixtures

Division 22

New cards
37

Furnaces, HVAC Ducts and Casings Ducts,

Division 23

New cards
38

Exterior Luminaries, Interior Lighting, Wiring, Fixtures, Communications, Sound and Video

Division 26

New cards
39

Clearing and Grubbing, Underpinning, Cofferdams, Slurry Walls

Division 31

New cards
40

Bar Chart (Gantt Chart)

Used where projects are simple and Fairly Linear. Example:Houses.

New cards
41

Network Diagram

Used where projects are complex. Example: Power Plants, submarines.

New cards
42

Matrix Schedule

Used where proejects have a series of repetative tasks. Example: High-Rise

New cards
43

Line of Balance Diagram

Used where projects are linear in nature, horizontal construction. Example: Highways, Pipelines.

New cards
44

Horse Blanket

Pattern resembles old horse blanket. Used where projects have various types of construction practices. Example: subways (subway station and track), Interstate Highways (roadways, bridge building, toll booths, rest areas), Airports (Highway approach, parking garages, baggage terminal, concourses).

New cards
45
term image

Bar Chart (Gantt Chart)

New cards
46
term image

Network Diagram

New cards
47
term image

Matrix Chedule

New cards
48
term image

Line of Balance Diagram

New cards
49
term image

Horse Blanket

New cards
50

Size Factor

Your building size/ typical building size

New cards
51

Cost Multiplier

where the size factor (x-axis) intersects the cost modifier curve

New cards
52

Inflation factor

present index/past index

New cards
53

Commercial Riser stair Hight

7”

New cards
54

Residential Riser Stair Hight

7.75”

New cards
55

(H/2)/resid or commercial riser hight

Number of stairs?

New cards
56

(H/2)/# of stairs

Stud Length?

New cards
robot