1/31
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Direct Cost
Can be traced specifically to the cost object
Indirect Cost
Related to but cannot be specifically traced to the cost object
Manufacturing Costs
Direct materials, Direct Labor, MOH
Predetermined Overhead Rate (POHR)
Estimated total MOH / Estimated total allocation base
MOH consists of:
Indirect material, indirect labor, depreciation
2 types of nonmanufacturing costs
Selling and Administrative expenses
Product Cost
EVERYTHING used to make the product. DM, DL, MOH
Variable Cost
Constant per unit, TOTAL varies
Fixed Cost
total remains constant regardless of activity
y=ax+b
y= total, a=fixed, b=variable cost/unit, x= # of units
Steps of High Low Method
V= change in cost / change in activity— then— F= TC - VC — then — plug it into y=ax+b
3 inventory accounts
Raw Materials, Work in Progress, Finished Goods
CM format income statement
REV-VC=CM-FC=NOI
Traditional format income statement
REV-COGS=GM-SG&A=NOI
3 types of overhead rates
Actual MOH (end), Estimated MOH (beg), Applied MOH (during)
Break Even (unit)
FC / unit CM
Break Even (sales)
FC / CM%
CM%
CM / Sales
Margin of Safety (MOS) $
Actual (budgeted) sales - Break Even Sales
Margin of Safety (MOS) %
MOS $$ / Actual Sales
Degree of Operating Leverage
CM / NOI
% Change of NOI=
DOL x % Change in Sales
Relevant Cost (make or buy)
Any cost that is different between 2 choices
Segment Margin
CM - Traceable FC
Common fixed costs ______________
only go in the totals column
Constraints are also known as
bottlenecks
Avoidable FC
would disappear if the segment disappeared
Production Budget
Budgeted sales
+ Desired units of ending FG
= Total Needs
- beg FG
= Required production
DM Budget
Required Production
x RM per FG=
RM needed for production
+desired end RM inventory
=Total RM needed
-Units of beg RM inv
=RM to be purchased
Cash Budget
beg cash balance
+cash reciepts
=total cash available
-cash disbursements
= excess OR deficiencey
What’s on the left side of the pitchfork
actual
Right side of the pitchfork?
flex