1/19
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Identify the Process - Standardize Process
Review existing processes
Identify Stakeholders
Identify process to standardize
Document Process - Standardize Process
Identify people & their practices
Document practices
Create documentation for implementation
Implement Process - Standardize Process
Eliminate waste points
Improve efficiency
Document and implement process
Monitor/Improve Process - Standardize Process
Monitor process for efficiency improvements
Continuously improve process based on results
IE Process Standardization
make a process as efficient and effective as possible
waste elimination
monitor/control process variations in quality
SE Process Standardization
Make the process work with the rest of the system
SMART Goals
Specific, Measurable, Attainable, Realistic, Time-bound Goals
Work Measurement
analyze time and resources needed for each process step (ex: time & motion studies)
Ergonomics
design workspaces to minimize physical strain and improve work productivity
Process Mapping
visually represent the entire process flow, identify interaction and dependencies
Requirements Management
define clear and measurable goals for the standardized process
Risk Management
proactively identify and mitigate potential issues during implementation
Change Management
develop strategies to address employee resistance and ensure smooth adoption
IE + SE Process Standardization
Phase 1: Planning Analysis
Phase 2: Design & Development
Phase 3: Implementation & Verification
Phase 4: Continuous Improvement
Phase 1: Planning Analysis
Use a process mapping to identify the target process and its interactions within the larger system
Leverage work measurement to understand the current process efficiency and identify areas for improvement
Phase 2: Design & Development
Collaboratively design the standardized process using IE tools like Lean Six Sigma to optimize workflow
Define clear requirements for standardized process, ensuring it meets quality and efficiency goals
Phase 3: Implementation & Verification
Develop and implement a change management plan to address employee concerns and ensure adoption
Use SPC to monitor the performance of the standardized process and identify any deviations
Statistical Process Control (SPC): a chart that tracks average data across time
Phase 4: Continuous Improvement
Conduct regular reviews to assess the effectiveness of the standardized process
Utilize data from SPC to identify further areas for improvement and iterate on the process
Sigma
waste elimination, Reduce variability, related to standard deviation (not the same thing, but basically are the same thing), slices away from mean on a normal bell curve
Statistical Process Control (SPC)
monitor process variations